Plan Review Notes For Permit 07051085 |
Permit Number |
07051085 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2007-05-30 16:50:08 | DENIED BY BUILDING | | | | 1) THE PRODUCT APPROVAL FOR THE GAF MODIFIED ROOF | | SYSTEM IS NOT A CLEAR ENOUGH COPY TO BE COPIED FOR | | RECORD KEEPING PURPOSES. SUBMIT TWO CLEAR LEGIBLE | | COPIES. FBC 106.1.3*. | | | | 2) THE ASSEMBLY THAT WAS SELECTED IS FOR AN INSULATED | | DECK. IS THIS ROOF DECK GOING TO BE INSULATED? | | | | 3) SPECIFY WHICH ONE OF THE FASTENING OPTIONS AND | | DESIGN PRESSURE WILL BE USED. CIRCLE THE CORRECT ONE ON | | THE NOA. | | | | 4) THE DESIGN PRESSURE OF -45 PSF ON THE NOA IS TOO LOW | | FOR THE PERIMETER AND CORNER AREAS. SEE GENERAL | | LIMITATION #7 ON PAGE 32, WHICH ALLOWS ENHANCED | | FASTENING. SUBMIT RAS 117 CALCULATIONS AS REQUIRED FOR | | ENHANCED FASTENING. | | | | 5) THE WRONG COVERSHEET WAS SUBMITTED FOR THE GAF | | MODIFIED ROOF SYSTEM. THE CORRECT ONE IS FL617-R1. | | | | 6) THE COVERSHEET AND NOA FOR THE GAF ROYAL SOVERIGN | | SHINGLES HAVE BEEN REVISED. SUBMIT THE CURRENT ONES | | COVERSHEET FL183-R2 AND NOA 05-1115.11. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 | | | | |
|