2007-11-05 11:18:01 | REVIEW #: 2ND |
| ACTION: DENIED |
| |
| FBC 2004 CODE FAMILY W/ 2005 AND 2006 SUPPLEMENTS FBC |
| CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN |
| RESPONSES FOR THE PURPOSE OF CONTINUITY. |
| |
| NOTE: THERE WAS NO WRITTEN RESPONSE TO PREVIOUS |
| MECHANICAL REVIEW COMMENTS IN THIS SUBMITTAL PACKAGE. |
| PLANS WILL BE REVIEWED TO DETERMINE IF PREVIOUS |
| COMMENTS WERE ADDRESSED. |
| |
| 1. NOT ADDRESSED. INFORMATION IS STILL MISSING ON |
| PLANS. |
| |
| 2. NOT ADDRESSED. |
| |
| 3. NO VENTILATION (OUTSIDE AIR) CALCULATIONS OR |
| INFORMATION PROVIDED. OCCUPANCY AND OCCUPANT LOAD FOR |
| PURPOSES OF VENTILATION SHALL BE DETERMINED IN |
| ACCORDANCE WITH FBC,M TABLE 403.3 PROVIDE CALCULATIONS |
| SHOWING OCCUPANCY, OCCUPANT LOAD, O.A. REQUIRED AND |
| O.A. PROVIDED. ALSO, PROVIDE BATHROOM EXHAUST FAN |
| INFORMATION ON EQUIPMENT SCHEDULE SHOWING MAKE/MODEL, |
| CFM AND MEANS OF CONTROL. ALSO SHOW DISCHARGE LOCATION |
| OF BATH EXHAUST IN ACCORDANCE WITH FBC,M 401.5. NOTE: |
| BATH EXHAUST FAN IS NOT SHOWN ON ELECTRICAL PLANS. HOW |
| WILL THIS FAN BE POWERED? |
| |
| 4. AIR BALANCE SCHEDULE FOR THE SPACE HAS NOT BEEN |
| PROVIDED. PLEASE READ PREVIOUS COMMENT AND PROVIDE ALL |
| REQUESTED INFORMATION TO SHOW COMPLIANCE WITH THE CODE |
| SECTIONS AS PREVIOUSLY REFERENCED. NOTE: IT IS |
| PROHIBITED TO HAVE RETURN AIR IN THE KITCHEN FOR |
| NON-DEDICATED KITCHEN HVAC SYSTEMS IN ACCORDANCE WITH |
| FBC,M 407.1. |
| |
| 5. NOT ADDRESSED. NO INFORMATION PROVIDED. SEE PREVIOUS |
| REVIEW COMMENT. |
| |
| 6. WITHOUT A WRITTEN RESPONSE, THE FOLLOWING IS NOTED |
| BASED ON INFORMATION ON PLANS AND SUBMITTALS: |
| A) PLAN INDICATES A/C IS NEW AND EXISTING. ONLY ONE |
| SYSTEM IS SHOWN ON PLAN. ARE THERE TWO SYSTEMS? ONLY |
| ONE IS LISTED ON EQUIPMENT SCHEDULE. |
| B) FLOOR PLAN SHOWS A ?CU #5 ON ROOF.? IS THIS A |
| ROOFTOP PACKAGE UNIT AS INDICATED BY EQUIPMENT SCHEDULE |
| AND MANUAL J FORM OR A SPLIT SYSTEM WITH AHU AND CU? IS |
| THIS THE NEW SYSTEM OR THE EXISTING SYSTEM? |
| C) THE RTU LISTED ON PLAN DOES NOT MATCH THE RTU LISTED |
| ON MANUAL J FORM. |
| D) THE GAS RISER DIAGRAM SHOWS AN EXISTING 4 TON RTU ON |
| ROOF. THIS DOES NOT MATCH ANY OF THE OTHER SUPPLIED |
| INFORMATION. THERE IS ALSO A GAS LINE SHOWN GOING TO |
| THE RTU FOR HEAT WHILE THE ELECTRICAL PLAN SHOWS A 5KW |
| HEAT STRIP. |
| E) ELECTRICAL PLAN SHOWS SERVICE FOR ONE AHU AND ONE CU |
| FOR ONE SPLIT SYSTEM. WHERE IS THE 2ND SYSTEM ON |
| ELECTRICAL PLANS? THE LETTER FROM A & J TECHNOLOGIES, |
| INC. INDICATES THAT A NEW UNIT IS SIZED TO PROVIDE |
| ADDITIONAL COOLING REQUIRED BY THE KITCHEN. IS THE ONE |
| EXISTING SYSTEM BEING REPLACED OR IS THIS AN ADDITIONAL |
| SYSTEM? IN ANY EVENT, THE ELECTRICAL SHOWS ONLY ONE |
| SPLIT SYSTEM. THE ACTUAL NATURE OF THE WORK TO BE |
| PERFORMED CAN NOT BE DETERMINED AT THIS TIME. |
| F) THE LETTER INDICATES THAT A & J TECHNOLOGIES HAS |
| DESIGNED THIS A/C SYSTEM. IN ORDER TO PERFORM DESIGN OF |
| THIS COMMERCIAL SYSTEM, THEY ARE REQUIRED TO BE |
| LICENSED AS AN ENGINEERING BUSINESS UNDER FS 471 OR AS |
| A MECHANICAL CONTRACTOR UNDER FS 489. PROVIDE ALL |
| RELEVANT LICENSE INFORMATION FOR THIS COMPANY. SEE FBC |
| 105.3.1.2(4). |
| |
| 7. AIRFLOW ON SCHEDULE NOW SHOWS 1300 CFM, BUT WE STILL |
| DON?T KNOW THE CFM OF THE 6 INCH DROP IN THE KITCHEN. |
| THIS NEEDS TO BE ADJUSTED BASED ON WHAT EQUIPMENT IS |
| ACTUALLY BEING USED AND WHAT IS REQUIRED BASED ON THE |
| MANUAL J SUBMITTED. |
| |
| 8. NOTE 9 HAS BEEN REMOVED. THERE IS NO LONGER A |
| CONFLICT. HOWEVER, NOTE 4 NOW STATES 1\ INCH R-6 DUCT. |
| GENERALLY 1 ? INCH IS REQUIRED TO ACHIEVE R-6. PLEASE |
| CORRECT NOTE OR PROVIDE DUCT MANUFACTURER?S SUBMITTAL |
| TO VERIFY THIS INFORMATION. |
| |
| 9 AND 10. NO INFORMATION WAS PROVIDED REGARDING THE |
| COMMERCIAL KITCHEN EXHAUST SYSTEM OTHER THAN A NOTE FOR |
| CFM ON HE MANUAL J FORM. PROVIDE INFORMATION FOR A |
| COMPLETE COMMERCIAL KITCHEN EXHAUST SYSTEM, |
| DEMONSTRATING COMPLIANCE WITH FBC,M SECTIONS 505 |
| THROUGH 509. |
| |
| 11. THIS COMMENT STILL STANDS AS SIGNIFICANT |
| INFORMATION IS STILL MISSING. |
| |
| ENERGY CALCULATIONS: METHOD A COMPLIANCE FORM IS NOT |
| AVAILABLE FOR THIS PROJECT AS THIS IS NOT A WHOLE |
| BUILDING. SHOW COMPLIANCE WITH MINIMUM PRESCRIPTIVE |
| REQUIREMENTS FOR ALL NEW COMPONENTS BEING INSTALLED IN |
| ACCORDANCE WITH FBC 13-400.0.C.4. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| RONALD J. REGUEIRO |
| 561.805.6719 |
| [email protected] |