2007-08-23 18:02:20 | |
| *** DENIED 3RD REVIEW *** |
| |
| ** PLEASE SEE THERE ARE SUBSTANTIAL NEW COMMENTS. THIS |
| IS THE FIRST REVIEW OF MANY ITEMS WHICH ARE NOW ON |
| PLANS WHICH WERE NOT ON PLANS PREVIOUSLY SUBMITTED. |
| PLEASE SEE THIS IS THE FIRST TIME THAT A PANEL |
| SCHEDULE, LOAD CALCULATIONS AND RISER HAVE BEEN |
| SUBMITTED FOR REVIEW CREATING SEVERAL NEW COMMENTS. |
| |
| 1) NOTE: PLEASE SEE THE NEW PANEL WHICH SEEMS TO BE |
| REPLACING THE EXISTING PANEL DOES NOT CORRELATE WITH |
| RISER OR LOAD CALCULATIONS. |
| PLEASE SEE MANY OF THE FOLLOWING ITEMS WHICH ARE NOT |
| CODE COMPLIANT. |
| A) PLEASE SEE THE RISER SHOWS THIS AS AN EXISTING |
| 3-PHASE PANEL AND FEEDERS YET THE NEW PANEL IS SHOWN AS |
| A 1-PHASE PANEL? |
| B) PLEASE SEE NO OVER CURRENT PROTECTION IN THE |
| EXISTING MAIN IS BEING SHOWN ON THE RISER FOR NEW |
| PANEL. THIS WAS REQUESTED ON THE TWO PREVIOUS REVIEWS |
| AND THE INFORMATION SUBMITTED IS NOT COMPLETE. ONLY |
| SHOWS 2/0 FOR FEEDERS AND BEING 3-PHASE YET AGAIN NEW |
| PANEL IS 1-PHASE. |
| C) PLEASE SEE THE VOLTAGE OF THE PANEL IS BEING SHOWN |
| AS 120/240 YET THE LOAD CALCULATIONS INDICATES THIS |
| SERVICE AND CALCULATIONS AS 120/208V? |
| D) PLEASE SEE THERE A NUMEROUS BREAKERS ON THE PANEL |
| SCHEDULE WHICH ARE SHOWN AS 2-POLE BREAKERS FEEDING |
| SINGLE POLE CIRCUITS WHICH CAN NOT BE POSSIBLE. PLEASE |
| SEE THERE ARE 2-POLE CIRCUITS SHOWN FOR THREE POLE |
| SPACES. PLEASE SEE THERE ARE THREE POLE SPACES WITH TWO |
| POLES CIRCUIT BREAKERS. |
| *** NONE OF THESE THINGS CORRELATE AND IT IS NOT |
| POSSIBLE. PLEASE CORRELATE ALL BREAKERS AND CIRCUITS. |
| PLEASE BE SURE TO CORRECTLY INDICATE IF THESE ARE |
| 1-POLE, 2-POLEPR 3-POLE DEPENDING ON THE CIRCUIT AND |
| WHETHER OR NOT PANEL IS SINGLE PHASE OR THREE PHASE. |
| PLEASE BE SURE ALL SPACES IN PANEL CORRELATE WITH THE |
| PHASES AND SPACE EACH BREAKER WILL TAKE. |
| 408.4. |
| E) PLEASE SEE RISER INDICATES PANEL AS 150AMP YET PANEL |
| IS BEING SHOWN AS 225AMP. IS THE EXISTING 150AMP AND |
| THE NEW ONE WILL BE 225AMP? |
| F) PLEASE SEE 110.14 AND 310.16 AS 2/0 CONDUCTORS ARE |
| NOT RATED FOR 200 OR 225AMP OCP. PLEASE KNOW YOU MAY |
| ONLY USE THE 75 DEGREE COLUMN IN THE NEC UNLESS LUGS |
| ARE 90 DEGREE RATED. (MOST EQUIPMENT IS 75, SPECIAL |
| ORDER FOR 90 ONLY) |
| |
| 2) NOTE: PLEASE SUBMIT LOAD CALCULATIONS WHICH MEET THE |
| MINIMUM AS REQUIRED PER THE NEC 220. |
| PLEASE SEE THE LOADS SHOWN FOR THE A/C EXCEED THE |
| BRANCH CIRCUIT RATING OF THE BREAKERS AND |
| CONDUCTORS.240.4, 310.16 ( THIS IS BASED ON THESE BEING |
| SHOWN IN A SINGLE PHASE PANEL. THIS MAY BE OK, IF |
| INDEED THIS IS A THREE PHASE PANEL AND SERVICE. |
| PLEASE SHOW ALL CONTINUOUS LOADS AT 125% AS REQUIRED |
| PER 215.3, 230.42 ETC. (LIGHTING). |
| PLEASE SEE 422.13 AS THE MINIMUM LOAD FOR WATER HEATERS |
| ARE REQUIRED TO BE FIGURED AND SHOWN AT 125%. |
| PLEASE SEE 220.87 |
| |
| 3) NOTE: PLEASE SEE NOW THAT PANEL HAS MOVED WHICH IT |
| WAS SHOWN ON PREVIOUS PLANS IN CLOSET, THE PLANS ARE |
| NOW MISSING THE REQUIRED WATER HEATER DISCONNECT PER |
| 422.31. |
| |
| 4) NOTE: GFI REQUIRED FOR BATH ROOM RECEPTACLES |
| 210.8B1 |
| |
| |
| IF THERE ARE ANY QUESTIONS, PLEASE CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW II |
| CONSTRUCTION SERVICES DEPARTMENT |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |