Plan Review Notes
Plan Review Notes For Permit 07040621
Permit Number 07040621
Review Stop M
Sequence Number 1
Notes
Date Text
2007-05-08 10:05:23--------------DENIED----------------
  
 FBC 2004 CODE FAMILY W/2006 REVISIONS
 FBC CH 1 AS AMENDED BY THE CITY OF WEST PALM BEACH
 ASHRAE 15-01
 ASHRAE 62.1-04
  
 1. MH-101: THERE ARE MANY AREAS THROUGHOUT THIS FLOOR
 WHERE TRANSFER DUCTS ABOVE CEILING ARE TOO SMALL TO
 RETURN THE REQUIRED CFM BASED ON TD SCHEDULE ON MM-501.
 THERE ARE ALSO MANY ROOMS WHICH DO NOT HAVE ANY
 TRANSFER DUCT ABOVE CEILING TO ALLOW RETURN AIR FROM
 SPACE EVEN THOUGH THE SPACE IS SEPARATED FROM THE FCU
 BY A PARTITION. THERE ARE TOO MANY TO LIST, BUT HERE
 ARE SOME EXAMPLES: ROOMS 169,175,129,126,117,100.
 BALANCED RETURN IS REQUIRED FROM ALL HABITABLE ROOMS
 PER FBC,M 601.4.
  
 2. MH-101: ROOM AIR DATA SCHEDULE DOES NOT ACCOUNT FOR
 1510 CFM OF EXHAUST FROM OED'S (KEY NOTES 3&4). THE
 AMOUNT OF SUPPLY IS TO BE APPROXIMATELY EQUAL TO RETURN
 AND EXHAUST AIR PER FBC,M 403.1. SCHEDULE SHOWS 9080
 CFM SUPPLY WITH 8220 R/A + 715 CFM EA +1510 EA. THERE
 IS A TOTAL OF 10445 CFM R/A AND EA VS 9080 CFM SUPPLY.
 BALANCE IS OFF BY 1365 CFM. PLEASE SHOW COMPLIANCE WITH
 THIS SECTION WHILE MAINTAINING MIN. REQUIRED
 VENTILATION RATES IN ACCORDANCE WITH FBC,M 403.3.
  
 3. ERV-1 IS RATED FOR 2200 CFM ON SCHEDULE. TOTAL OA
 REQUIRED BY ALL FCU'S FED BY ERV-1 AS STATED ON FCU
 SCHEDULE IS 2510. PLEASE COORDINATE EQUIPMENT,SCHEDULES
 AND VENTILATION RATES IN CUNJUNCTION WITH REVIEW
 COMMENT #2.
  
 4. MH-101: THE FOLLOWING FCU'S ARE MISSING A SIZE FOR
 OA DUCT: 1-6, 1-7, 1-9, 1-14. FCU 1-5 SHOWS 10X12 OA
 DUCT FOR 140 CFM. IS THIS CORRECT? PLEASE CLARIFY. FBC
 106.1.1.
  
 5. MH-101: 18X14 OED IS LOCATED IN CEILING SPACE ABOVE
 ROOM 182. THIS SPACE IS ISOLATED FROM OTHER CEILING
 SPACES EXCEPT FOR TD-3. IS TD-3 FOR THE PURPOSE OF
 RETURN BACK TO FCU OR IS IT TO ALLOW EXHAUST TO REACH
 OED? A) TD-3 IS TOO SMALL TO TRANSFER 950 CFM OF
 EXHAUST AND B) IT CANNOT BOTH ALLOW EXHAUST IN AND
 RETURN AIR OUT OF SPACE SIMULTANEOUSLY. PERHAPS THE OED
 CAN BE RELOCATED TO A LARGER OPEN PLENUM AREA TO ALLOW
 PROPER EXHAUST FLOW AND RETURN AIR FLOW FROM ROOM 182.
 BALANCED RETURN IS REQUIRED PER FBC,M 601.4.
  
 6. MH-101: WHAT IS THE SIZE OF 2ND SUPPLY DROP IN
 WAITING 110? WHAT IS THE SIZE OF DUCT/GRILL AT
 ELECTRICAL CLOSET 101? FBC 106.1.1.
  
 7. MH-101: THE FOLLOWING FCU'S SHOW CFM'S ON ROOM AIR
 DATA SCHEDULE WHICH DIFFER FROM THOSE SHOWN ON FCU
 SCHEDULE (MM-603): 1-2,1-3,1-4,1-6,1-8,1-10. WHICH IS
 CORRECT? PLEASE CLARIFY PER FBC 106.1.1.
  
 8. MH-101: DUCTS ARE SHOWN PENETRATING 1-HOUR RATED
 WALLS FROM FCU-10 INTO LOBBY 100 AND ELECTRICAL ROOM
 104. ALSO THE RETURN OPENING FROM LOBBY 100 INTO
 WAITING 110.
 A) WHAT SIZE IS RETURN OPENING?
 B) PLEASE SHOW THESE OPENINGS IN RATED ASSEMBLIES TO BE
 PROTECTED PER FBC,M 607.5.
  
 9. MH-102: THE FOLLOWING FCU'S HAVE CFM VALUES ON ROOM
 AIR DATA SCHEDULE WHICH DIFFER FROM THOSE SHOWN ON FCU
 SCHEDULE: 2-1, 2-2. WHICH IS CORRECT? FBC 106.1.1.
  
 10. MH-102: PLEASE SEE REVIEW COMMENT #2: SUPPLY IS NOT
 BALANCED WITH RETURN AND EXHAUST. 6990 CFM SUPPLY VS
 5575 R/A+ 1920 CFM EA FOR A TOTAL OF 7495 CFM R/A AND
 EA.SYSTEM IS OUT OF BALANCE BY 505 CFM. FBC,M 403.1.
  
 11. MH-102: DUCT AND TRANSFER OPENING IN RATED WALL AT
 ELEV. VESTIBULE 200. PLEASE SHOW OPENING PROTECTIVES
 PER FBC,M 607.5.
  
 12. MH-102: ROOM AIR DATA SCHEDULE SHOWS EXEC.
 CONFERENCE ROOM AS 205A, FLOOR PLAN SHOWS CONFERENCE
 206. PLEASE COORDINATE SCHEDULE AND FLOOR PLAN.
  
 13. MH-102: PLEASE SHOW SIZES OF ALL EXHAUST BRANCH
 DUCTS SUCH AS IN LAVATORY 218 AND WC 223.
  
 14. MH-102: CONFERENCE ROOM 206 SHOWS 570 CFM SUPPLY
 WITH ONE TD-2 TRANSFER DUCT WHICH IS RATED FOR MAX. 250
 CFM ON PG MM-501. PLEASE SHOW BALANCED RETURN IN THIS
 AREA PER FBC,M 601.4.
  
 15. MH-102: VESTIBULE 200 IS SHOWN TO HAVE ONE SUPPLY
 DROP AT 200 CFM WITH ONE TD-1 FOR TRANSFER WHICH HAS A
 MAX. OF 175 CFM PER MM-501. PLEASE SHOW BALANCED RETURN
 PER FBC,M 601.4. ALSO, PLAN SHOWS SOME TYPE OF
 RECTANGLE INTAKE GRILL IN CEILING. PLEASE CLARIFY.
  
 16. MM-501 DETAIL #6:
 A) PLEASE SHOW MEANS OF ATTACHMENT OF SUPPORTS TO
 STRUCTURE AS WELL AS TYPE/SIZE OF SUPPORTS TO STRUCTURE
 AS WELL AS TYPE/SIZE OF SUPPORTS TO BE USED.
 B) PLEASE SHOW MEANS OF CONDENSATE SECONDARY/AUXILIARY
 DRAIN PROTECTION PER FBC,M 307.2.3.
  
 17. MM-502 DETAIL #1: CONDENSATE DRAINS SHALL BE
 TRAPPED AS REQUIRED BY THE EQUIPMENT OR APPLIANCE
 MANUFACTURER. FBC,M 307.2.4
  
 18. MM-502 DETAIL #5: ROOF MOUNTED MECHANICAL UNITS
 SHALL BE MOUNTED ON CURBS RAISED A MINIMUM OF 8 INCHES
 (203 MM) ABOVE THE ROOF SURFACE, OR WHERE ROOFING
 MATERIALS EXTEND BENEATH THE UNIT, ON RAISED EQUIPMENT
 SUPPORTS PROVIDING A MINIMUM CLEARANCE HEIGHT IN
 ACCORDANCE WITH TABLE 1509.7. ALSO, PRE-ENGINNERED A/C
 STANDS ARE STRUCTURAL ELEMENTS AS DEFINED BY FAC 9B-72.
 THEREFORE, PRODUCT APPLROVAL IS REQUIRED.
  
 19. PLEASE SHOW OUTDOOR AIR CALCULATIONS. FBC,M 403.3
 AND FBC 106.1.2.
  
 20. ENERGY CALCULATIONS SHALL BE MADE A PART OF THE
 PLANS AND SPECIFICATIONS OF THE BUILDING PER FBC
 13-103.2. DESIGN PROFESSIONALS RESPONSIBLE UNDER
 FLORIDA LAW FOR THE DESIGN OF LIGHTING, ELECTRICAL,
 MECHANICAL, AND PLUMBING SYSTEMS AND THE BUILDING
 SHELL, SHALL CERTIFY COMPLIANCE OF THOSE BUILDING
 SYSTEMS WITH THE CODE BY SIGNING AND PROVIDING THEIR
 PROFESSIONAL REGISTRATION NUMBER ON THE ENERGY CODE
 FORM PROVIDED AS PART OF THE PLANS AND SPECIFICATIONS
 TO THE BUILDING DEPARTMENT. FBC 13-103.1.1.1.
  
 21. MM-601: PLEASE PROVIDE SIZES ON CHILLED WATER
 SCHEMATIC AND DUCT RISER DIAGRAMS. ALSO, PLEASE SHOW
 PUMP LOCATION AND REMOVE THE NOTE STATING "OPTIONAL".
 FBC 106.1.1.
  
 22. FAN SHUT-DOWN BY SMOKE DETECTOR IS REQUIRED FOR ALL
 SUPPLY FANS IN THE A/C SYSTEM, INCLUDING ERV'S PER
 FBC,M 607.2.2. EXCEPTIONS: AC-1 AND EMU-1.
  
 23. ABOVE CEILING AREAS ARE USED AS PLENUMS. PLEASE
 ENSURE THAT ALL AMTERIALS EXPOSED IN PLENUMS ARE IN
 COMPLIANCE WITH FBC,M 602.2.1, INCLUDING TAGS,
 EQUIPMENT LABELS AND PIPE MARKERS AS LISTED IN
 SPECIFICATIONS BOOK SEC. 15075. ALSO SEE SEC. 15181-7
 REGARDING CONDENSATE PIPING. PVC CANNOT BE USED IN A
 PLENUM AS IT DOES NOT MEET THE REQUIREMENTS OF
 602.2.1.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT:
  
 RONALD J REGUEIRO
 561.805.6719
 [email protected]