Date |
Text |
2007-04-30 11:45:27 | ** UNSAT ** |
| |
| ** PLEASE SEE THAT ANY REFERENCES TO THE FBC CHAPTER 1 |
| ARE FROM THE ADMINISTRATIVE CODE ADOPTED BY THE CITY OF |
| WEST PALM BEACH. |
| |
| |
| 1) NOTE:PLEASE KNOW THAT ANY PERMIT APPLICATIONS |
| WHICH ARE SUBMITTED AFTER DECEMBER 8TH, 2006 PLACES |
| PROJECTS UNDER THE NEW CODES ADOPTED BY THE STATE. |
| PLEASE SEE THAT THIS SHALL INCLUDE 2006 REVISIONS TO |
| THE 2004 FBC FOR ALL TRADES AND THE 2005 NFPA-70. |
| PLEASE KNOW THERE ARE CHANGES IN THE FBC WHICH MAY |
| AFFECT DESIGNS FOR ALL TRADES. |
| PLEASE LIST THE FOLLOWING ON ELECTRICAL SHEETS FOR THIS |
| REVIEWER AT A MINIMUM. |
| 2004 FBC W/ 2006 REVISIONS |
| 2005 NFPA-70 |
| |
| 2) NOTE: PLEASE VERIFY SYSTEM BEING INSTALLED AND |
| PROPOSED. PLEASE SEE THE GENERATOR LOAD CALCULATIONS |
| AND SPECIFICATIONS INDICATE THIS UNIT AS 120/240 SINGLE |
| PHASE, AND THE PLANS INDICATE THE EQUIPMENT/PANEL BEING |
| 120/208V. |
| PLEASE ALSO SEE THAT PART OF THE RISER SHOWS THIS |
| SERVICE AS THREE PHASE.? |
| FBC 106 .1.2 |
| |
| 3) NOTE: PLEASE SEE THE RISER STILL SEEMS TO SHOW A |
| CONNECTION FROM THE GUTTER TO THE SAME PANEL WHICH IS |
| BEING FED FROM THE GENERATOR? |
| PLEASE CLARIFY RISER AS SHOWN AS THE EXISTING |
| CONNECTION FROM GUTTER WOULD BE REQUIRED TO BE REMOVED |
| INCLUDING CONDUIT. |
| PLEASE CLARIFY RISER AS SHOWN WITH THE FEED FROM FPL. |
| DOES THIS COME THROUGH THE METER? IS THIS A 600AMP |
| METER/ OR CT. |
| FBC 106.1.2, |
| NEC 215.5 |
| |
| 4) NOTE: PLEASE CLARIFY THE LOAD CALCULATIONS AS SHOWN. |
| PLEASE SEE THESE MENTION APARTMENT LOADS, HOWEVER THE |
| LOADS ARE NOT COMPLETE FOR APARTMENTS. |
| PLEASE SEE THE LOADS MUST BE BASED ON THE NEC. 220 |
| (2005 NEC). |
| FBC 106.1.2 |
| |
| 5) NOTE: PLEASE SEE THE LOAD CALCULATION SHEET |
| INDICATES THE GENERATOR BREAKERAT 200AMPS, THE RISER |
| SHOWS THIS AS 150AMPS, AND THE SPECS INDICATES 175AMP? |
| PLEASE COORDINATE ALL, AT THIS TIME THE SIZES OF |
| CONDUCTORS ETC CAN NOT BE VERIFIED. |
| 240.4, 310.16 ETC. |
| FBC 106.3.5.1.2, 106.1.2 |
| |
| 6) NOTE: PLEASE SEE THE SPECS SUBMITTED FOR THE ATS |
| DOES NOT INDICATE A DISCONNECTING MEANS FOR THE |
| LINE/NORMAL SIDE AND A BREAKER/DISCONNECT FOR THE |
| GENERATOR/EM SIDE? |
| PLEASE REVISE SPECS OR RISER TO INCLUDE A DISCONNECTING |
| MEANS AT THE SERVICE LOCATION. |
| 225.31-225.39. |
| ** PLEASE KNOW, AS ZONING COMMENTS WILL MOST LIKELY |
| REQUIRE THIS UNIT TO BE IN AN ENCLOSURE THE BREAKER ON |
| THE GENERATOR MAY NOT BE USED. |
| |
| 7) NOTE: PLEASE PROVIDE ALL ELECTRICAL EQUIPMENT ON THE |
| PLAN LAYOUT SHEET. |
| FBC 106.1.2 |
| LOCATIONS NEED TO BE VERIFIED FOR 230, 225 ETC. |
| |
| 8) NOTE: PLEASE SEE THE SPECIFICATIONS INDICATES THIS |
| AS BEING CONNECTED TO A PROPANE TANK, YET THE GAS |
| PERMIT APPLICATION MENTIONS THIS WILL BE A NATURAL GAS |
| UNIT? |
| PLEASE SEE COMMENTS FROM PLUMBING. |
| |
| 9) NOTE: PLEASE SEE THE NOC SUBMITTED AS EXPIRED PER FS |
| 713.13(2). |
| PLEASE SEE THE NOC WILL BE REQUIRED TO BE RE-RECORD |
| BEFORE PICKING UP THE PERMIT. |
| |
| ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW II |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |
2007-04-27 17:00:40 | PLANS REMOVED FROM INCOMING/TABLE IN ELEC FOR REVIEW. |