2007-07-30 14:43:47 | BUILDING REVIEW THIRD CHECKLIST: |
| 1- THIS IS THE THIRD TIME THAT THE ENERGY CALCULATIONS |
| (FORM 600B-04ROR 600C-04R)ARE REQUESTED AS REQUIRED |
| BY SEC. 13-600.3.ABC.3FBC 2004. |
| |
| 2- ROOF FRAMING PLAN: REVISE NUMBER OF FASTENERS |
| SPECIFIED FOR SIMPSON HETAL20 CONNECTOR TO ACHIEVE THE |
| SPECIFIED UPLIFT LOAD.SEE CURRENT SIMPSON CATALOG AND |
| REVISE AS REQUIRED. OTHERWISE, PROVIDE COMPLETE |
| ENGINEERING ANALYSIS TO DEMONSTRATE WHY NUMBER OF |
| FASTENERS IS DIFFERENT THAN THAT TESTED AND PUBLISHED |
| BY THE MANUFACTURER. SEC. 106.1.2 CITY AMENDMENTS TO |
| FBC 2004. |
| |
| 3- PROVIDE COMPLETE SPECIFICATIONS FOR SOFFIT |
| CONSTRUCTION. "STUCCO FINISH SOFFIT" ARE NOT COMPLETE |
| SPECIFICATIONS. SEC. 106.1.2 CITY AMENDMENTS TO FBC |
| 2004. |
| |
| 4-SOFFIT VENTILATION WAS CHANGED.NEW SPECS CALL FOR |
| 7" X 24"AT 24" O.C. VENTS.THEY ARE ARE NOT ENOUGH |
| TO PROVIDE CROSS VENTILATION AS REQUIRED BY SEC. R806 |
| FOR FLAT ROOFS. REVISE AS REQUIRED. |
| |
| 5- REVISE REFERENCES FOR EMERGENCY EGRESS WINDOWS. SEE |
| RESIDENTIAL CODE FOR CORRECT CODE SECTIONS TO BE USED. |
| ON THE OTHER HAND,EGRESS WINDOWS ARE NOT REQUIRED FOR |
| BATHROOM WINDOWS. |
| |
| 6- PROVIDE PRODUCT APPROVAL AS REQUIRED BY DCA RULE |
| 9B-72 FOR: |
| A) STORM SHUTTERS. DRAWINGS SUBMITTED ARE NOT AN |
| APPROVED PRODUCT APPROVAL. |
| ***NOTE: ALSO, CLEARLY INDICATE ON SHUTTER DRAWINGS |
| SPECIFIC MOUNTING CONDITIONS (EG; WALL MOUNTED, ETC) |
| AND SPECIFIC ANCHOR TYPE AND SPACING TO BE USED. |
| |
| B) FLAT ROOF ASSEMBLY. AND CLEARLY IDENTIFY SPECIFIC |
| ASSEMBLY TO BE INSTALLED AND SPECIFIC FASTENING OPTION. |
| |
| ALSO, PROVIDE RAS 117 CALCULATIONS FOR NAIL ENHANCING |
| AT PERIMETER AND CORNER AREAS AS REQUIRED BY GENERAL |
| LIMITATION #7. |
| |
| 7- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS |
| REQUIRED BY SEC. 106.3.3 CITY AMENDMENTS TO FBC 2004. |
| ***NOTE: ENGINEER NEEDS TO WRITE HIS NAME ON REVIEW |
| STAMP.REVIEW & APPROVE STAMP ALONE IS NOT ACCEPTABLE |
| BECAUSE IT DOESN'T SAY WHO REVIEWED THE PRODUCT |
| APPROVAL. |
| |
| 8- SURVEY AND FLOOR PLANS DON'T MATCH. SEE DIMENSIONS |
| AND BUILDING LAYOUT. REVISE AS REQUIRED TO MATCH. |
| |
| JULIO GOMEZ |
| BUILDING PLANS EXAMINER |
| (561)805-6712 |