Plan Review Notes
Plan Review Notes For Permit 07030782
Permit Number 07030782
Review Stop M
Sequence Number 1
Notes
Date Text
2007-03-30 08:42:18*** DENIED ***
 1) MECHANICAL PLANS ARE SHOWING A PACKAGE A/C SYSTEM TO
 BE INSTALLED, A/C EQUIPMENT LISTING IS CALLING FOR A
 SPLIT SYSTEM (AIR HANDLER AND CONDENSER UNIT), THE TWO
 MUST COINCIDE, PLEASE CORRECT.
  
 2) PLEASE SUBMIT DETAILED MANUFACTURER'S
 SPECIFICATION'S AND INSTALLATION INSTRUCTIONS FOR A/C
 SYSTEM.
  
 3) THE 8" RETURN AIR TRANSFER DUCT TO BEDROOM #3 NEEDS
 TO BE 10", SEE 2004 FBC/R M1602.4. PLEASE CORRECT.
  
 4)THE 8" RETURN AIR TRANSFER DUCT TO BEDROOM #2 NEEDS
 TO BE 12", SEE 2004 FBC/R M1602.4. PLEASE CORRECT.
  
 5)THE 8" RETURN AIR TRANSFER DUCT TO BEDROOM #1 NEEDS
 TO BE 9", SEE 2004 FBC/R M1602.4. PLEASE CORRECT.
  
 ** 2004 FBC/R M1602.4 BALANCED RETURN AIR MAY BE
 ACHIEVED BY.
 (A)TRANSFER DUCTS MAY ACHIEVE THIS BY INCREASING THE
 RETURN TRANSFER ONE AND ONE HALF TIMES THE CROSS
 SECTIONAL AREA (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING AND THE DOOR
 HAVING AT LEAST AN UNRESTRICTED 1 INCHUNDERCUT TO
 ACHIEVE PROPER RETURN AIR BALANCE.
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.