Plan Review Notes
Plan Review Notes For Permit 07030752
Permit Number 07030752
Review Stop G
Sequence Number 1
Notes
Date Text
2007-04-11 11:11:25DENIED
 REFERENCE:
 ** FBC-2004 FUEL GAS.
 ** THE CITY OF WEST PALM BEACH GAS AND GEN/RES PERMIT
 APPLICATION REQUIREMENTS.
 ** FBC-2004 CHAPTER 1, THE CITY OF
 WEST PALM BEACH AMENDMENTS.
  
 THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR
 GAS PLAN REVIEW TO MEET CODE COMPLIANCE:
  
 1. ONLY ONE COPY OF SURVEY WAS SUBMITTED, A MINIMUM OF
 TWO REQUIRED.
  
 2. PLEASE INDICATE ON THE SURVEY THE PROPOSED LOCATION
 OF THE GENERATOR AND THE DISTANCES TO ALL BUILDING
 OPENINGS. THIS INCLUDES DOORS, WINDOWS AND ATTIC
 VENTILATION OPENINGS. INDICATE THE DIMENSIONS OF THE
 PROPOSED GENERATOR FROM PROPERTY LINES AND DISTANCES
 FROM ADJACENT DWELLING STRUCTURES.
  
 3. PLEASE INDICATE THE ABOVE GROUND CORRESPONDING PIPE
 CUT LENGTHS AND PIPING MATERIAL ON THE RESUBMITTED
 DRAWINGS. THE ONLY LENGTH INDICATED IS 15' OF 1-1/4"
 PE. WHAT IS THE ABOVE GROUND PIPING MATERIAL AND CUT
 LENGTHS?
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved