2007-03-20 10:46:18 | DENIED |
| REFERENCE: FBC-2004 FUEL GAS; FBC-2004 CHAPTER 1, THE |
| CITY OF WEST PALM BEACH AMENDMENTS; THE CITY OF WEST |
| PALM BEACH GAS PERMIT APPLICATION REQUIREMENTS; |
| |
| THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| GAS PLAN REVIEW TO MEET CODE COMPLIANCE: |
| |
| CONTRACTOR INFORMATION |
| NOTE: GAS PERMIT REQUIRED. GAS CONTRAC- |
| TOR TO SUBMIT PLANS WITH PERMIT APPLICA- |
| TION. ALL GAS INSPECTIONS TO BE COMPLETE |
| BEFORE FINAL GEN/RES INSPECTION. |
| |
| ******IMPORTANT INFORMATION****** |
| AS OF 8/25/06 GENERATOR (GEN/RES AND |
| GEN/COM) PERMIT APPLICATIONS SHALL NOT |
| BE ACCEPTED UNLESS THE ELECTRICAL INFOR- |
| MATION AND GAS (OR DIESEL) INFORMATION |
| IS ALL SUBMITTED AT THE SAME TIME. THE |
| GENERATOR, ELECTRICAL AND GAS/DIESEL IN- |
| FORMATION WILL BE ROUTED TOGETHER. THIS |
| WILL ENSURE THAT ALL OF THE INFORMATION (PARTICULARLY |
| THE MANUFACTURER'S SPECI- |
| FICATIONS AND INSTALLATION INSTRUCTIONS) |
| ARE AVAILABLE TO ALL PLAN REVIEWERS. |
| |
| 1. A GAS PERMIT CAN NOT BE ISSUED UNTIL |
| A GEN/RES PERMIT APPLICATION HAS BEEN |
| APPROVED BY ZONING FOR THE GENERATOR LOCATION. |
| |
| 2. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2004 |
| FUEL GAS CODE. |
| NOTE: THIS INCLUDES THE EXISTING GAS SYSTEM AS WELL AS |
| THE PROPOSED GENERATOR. PLEASE CLEARLY INDICATE THE |
| EXISTING GAS SYSTEM AS WELL AS THE PROPOSED. |
| |
| 3. SHOW TYPE OF PIPING MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE BEING USED. |
| NOTE: THIS INCLUDES THE EXISTING AS WELL AS THE |
| PROPOSED. |
| |
| 4. PLEASE INDICATE THE TYPE OF GAS, (LP OR NATURAL) ON |
| THE DRAWING. |
| |
| 5. BTU LOAD OF EACH APPLIANCE AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU |
| 402.4(33). |
| |
| 6. SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY, (METER), TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| OF CAPACITY TABLES A.3.1(4). |
| |
| 7. PLEASE INDICATE THE DELIVERY PRESSURE (PSI) PER |
| FBC-2004 FUEL GAS CODE SEC. 402.2. |
| NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| |
| 8. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2. |
| A} GENERATOR. |
| B} MP REGULATOR IF DELIVERY PRESSURE IS 2 PSI. |
| |
| 9. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| |
| 10. CLEARLY INDICATE ON THE PLAN IF THE |
| LP TANK IS ABOVE OR BELOW GROUND, AND |
| SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| PER NFPA 58. IF THE TANK |
| IS BELOW GROUND THE CONTAINER SHALL BE |
| SECURILY ANCHORED PER NFPA 58 SECTION |
| 3-2.2.7(H). |
| |
| 11. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| NAME, AND ALSO DATE DRAWING. PLEASE DO |
| THIS PRIOR TO RESUBMITTING. |
| |
| ********IMPORTANT INFORMATION******** |
| IN ORDER TO EXPIDITE PLAN REVIEW: WHEN RESUBMITTING, |
| PLEASE REPLACE ONLY SHEETS |
| WHICH HAVE CHANGED AND PROVIDE ONE COPY |
| OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| ONLY. NOTE: ONLY ONE CORRECTED DRAWING |
| IN RED INK FOR REFERENCE FOR |
| RESUBMITTAL. |
| |
| END OF COMMENTS: |
| |
| REVIEW BY MIKE PERSON |
| (561) 805-6730 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |
| UNDER SUPERVISION OF K.STEVENS |
| (561) 805-6721 |
| |
| |
| |