Date |
Text |
2007-03-09 08:09:19 | PLEASE PROVIDE FOLLOWING INFO: |
| |
| 1. PLEASE SHOW STANDARDS NOTES OF CITY OF WPB ON |
| DRAWINGSFOR SIDEWALK WIDTH , ITS SLOPE, DRIVEWAY, |
| PARKING, HANDICAP PARKING, PAINTPER CITY CODES ETC.,, |
| MUST MEET PER ADA,,ETC.,ALL THESE STANDARDS & NOTES OF |
| CITY OF WPB CAN BE OBTAINED FROM 1000 45TH STREET, ENG |
| DEPT. |
| 2. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| 3. FIRST FLOOR ELEVATION,MUST MEET FL BLDG CODE, FLOOD |
| ZONE, CENTER LINE OF ROAD , SIDEWALK ELEVATION. PLEASE |
| SHOW ALL THESE ELEVATIONS ON THE DRAWINGS. |
| 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT, GEO-TECH |
| REPORT. |
| 5.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| OR2.5"CRITERIA, ? PRE & POSTPERVIOUS AREA, |
| IMPERVIOUS AREA & TOTAL SITE AREA. |
| 6. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| 7. POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| ETC., PLANS SHOWING SILT FENCE AROUND THE SITE |
| 8. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| 9. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| YOUR SITE FOR STORM WATER DRAIN. |
| 10. ANY ASBESTOS FOUND OR LEAD IN OLD PAINT MUST BE |
| HANDLED BY HEALTH DEPT & FDEP. |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |