2007-03-08 16:07:36 | PLEASE PROVIDE FOLLOWING INFO: |
| |
| 1. PLEASE SHOW STANDARDS NOTES OF CITY OF WPB ON |
| DRAWINGSFOR SIDEWALK WIDTH , ITS SLOPE, DRIVEWAY, |
| PARKING, HANDICAP PARKING, PAINTPER CITY CODES ETC.,, |
| MUST MEET PER ADA,,ETC.,YOU CAN GET STANDARD NOTES OF |
| CITY OF WPB IN A C.D. FROM 1000 45TH STREET. WE SHOULD |
| HAVE THOSE NOTES ON YOUR DRAWINGS. |
| 2. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| SIDEWALK ELEVATION MUST MEET FL BLDG CODE, & FLOOD |
| ZONE,FIRST FLOOR ELEVATION MUST MEET THESE |
| MINIMUMREQUIREMENTS. |
| 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, & GEO TECH |
| REPORT. |
| 5.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| OR2.5"CRITERIA, ? |
| 6. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| PROJECT ONLY ?ALSO, WHAT IS TOTAL PERVIOUS,& IMPERVIOUS |
| AREA FOR THIS PROJECT. |
| 7. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? 8. |
| POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| ETC., PLANS SHOWING SILT FENCE AROUND THE SITE |
| 9. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED 10. |
| ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND YOUR |
| SITE FOR STORM WATER DRAIN. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |