Date |
Text |
2007-03-05 09:41:13 | ----------------DENIED------------------ |
| |
| FLORIDA BUILDING CODE 2004 |
| FLORIDA BUIDLING CODE, MECHANICAL 2004 |
| NFPA 96-01 |
| |
| 1. PG M-1 INFECTION CONTROL PLAN: NOTES CALL FOR |
| EX-AHU-3 TO PROVIDE 100% OUTDOOR AIR FOR AREA BEING |
| RENOVATED. THERE IS NO AHU-3 SHOWN ON THIS PLAN. PLEASE |
| CLARIFY PER FBC 106.1.1. |
| |
| 2. PG A3.0 DETAIL D4 NOTES: REFERS TO PG A13.2 AND |
| A13.5 FOR ADDITIONAL INFO. NO SUCH PAGES WERE INCLUDED |
| IN PLAN. PLEASE CLARIFY PER FBC 106.1.1. |
| |
| 3. PG A5.1 WHAT PROVISIONS ARE BEING MADE TO MAINTAIN |
| FIRE RATED SEPARATION BETWEEN GROUND FLOOR AND FIRST |
| FLOOR WHILE SHAFT IS REMOVED FOR REPLACEMENT OF DUCTS? |
| |
| 4. PG A1.0 AND A3.0 SHOW TEMPORARY CONTAINMENT BARRIER |
| TO BE 1-HOUR RATED. ARE REQUIRED WHERE DUCTS (OUTSIDE |
| AIR FROM EX-AHU-3 AND TEMPORARY EF) PENETRATE THE RATED |
| ASSEMBLY PER FBC,M 607.5. |
| |
| 5. PG M-2 PLAN NOTE #5: NO INFORMATION REGARDING THE |
| REMOVAL OF A THROUGH-WALL FAN COULD BE FOUND IN |
| ARCHITECTURAL DRAWINGS. PLEASE CLARIFY PER FBC |
| 106.1.1. |
| |
| 6. PG M-1 FAN SCHEDULE SHOWS EX-EF-1 MOVING 13,700 CFM. |
| PG M-5 KITCHEN AIR BALANCE SCHEDULE SHOWS EX-EF-1 |
| MOVING 2530 CFM. THESE TWO SCHEDULES DO NOT MATCH. IT |
| ALSO APPEARS THAT THERE IS AN EXTRA 2530 CFM IF EXHAUST |
| IN THE KITCHEN AIR BALANCE SCHEDULE SINCE EX-EF-1 IS |
| ALREADY BEING USED BY THE COMBINED HOODS TO PRODUCE THE |
| 13,700 CFM LISTED AT THE TOP OF THE SCHEDULE. PLEASE |
| CLARIFY PER FBC 106.1.1. |
| |
| 7. PLEASE INDICATE ON PLAN THE THICKNESS OF THE |
| STAINLESS STEEL EXHAUST DUCTS TO SHOW COMPLIANCE WITH |
| FBC,M 506.3.1.1. |
| |
| 8. PG X1.1 PLEASE REFERENCE SMACNA-95 HVAC DUCT |
| CONSTRUCTION STANDARDS - METAL AND FLEXIBLE TO SHOW |
| COMPLIANCE WITH FBC,M 603.3. |
| |
| 9. GREASE DUCTS TO BE SLOPED TOWARD THE HOOD AT NOT |
| LESS THAN 1/4 UNIT VERTICAL IN 12 UNITS HORIZONTAL PER |
| FBC,M 506.3.7. |
| |
| 10. THERE ARE NO CLEANOUTS SHOWN ON HORIZONTAL GREASE |
| DUCTS IN KITCHEN AREA. CLEANOUTS LOCATED ON HORIZONTAL |
| DUCTS SHALL BE SPACED NOT MORE THAN 20' APART PER FBC,M |
| 506.3.9. |
| |
| 11. GREASE DUCTS FOR TYPE I HOODS SHALL NOT BE |
| INTERCONNECTED UNLESS THEY MEET ALL THE REQUIREMENTS OF |
| FBC,M 506.3.5. THIS DESIGN CALLS FOR THE GREASE DUCTS |
| FROM HOODS 1,2 AND 7 TO INTERCONNECT AFTER ENTERING THE |
| RATED SHAFT ASSEMBLY. THIS DOES NOT COMPLY WITH |
| REQUIREMENT #3 OF THIS SECTION. |
| |
| 12. DUCT ENCLOSURE FOR GREASE DUCTS SHALL SERVE ONLY A |
| SINGLE GREASE EXHAUST DUCT SYSTEM AND SHALL MEET THE |
| MINIMUM AND MAXIMUM CLEARANCE REQUIREMENTS OF FBC,M |
| 506.3.10. MAKE-UP AIR DUCTS MAY NOT USE THE SAME SHAFT |
| ENCLOSURE AS THE GREASE DUCT. |
| |
| 13. DUCTS PENETRATING A SHAFT ENCLOSURE SHALL BE |
| PROTECTED WITH APPROVED FIRE AND SMOKE DAMPERS |
| INSTALLED IN ACCORDANCE WITH THEIR LISTING PER FBC,M |
| 607.5.5.1. THIS APPLIES ONLY TO THE MAKE-UP AIR DUCTS. |
| |
| 14. DRAWING SK-1 SHOWS METAL STRAPS OVER TOP OF FAN |
| HOUSINGS FOR THE PURPOSE OF ROOF ATTACHMENT. THESE |
| STRAPS SHOULD NOT HAVE TO BE REMOVED FOR EQUIPMENT |
| SERVICE PANEL ACCESS PER FBC,M 306.1. |
| |
| NOTE: A SEPARATE PERMIT WILL BE NEEDED FOR THE REQUIRED |
| MECHANICAL HOOD SUPPRESSION SYSTEM. |
| |
| IF YOU HAVE ANY QUESTIONS PLEASE FEEL FREE TO CONTACT |
| ME. |
| |
| RONALD J REGUEIRO |
| 561-805-6719 |
| [email protected] |