2007-03-05 09:41:13----------------DENIED------------------
  
 FLORIDA BUILDING CODE 2004
 FLORIDA BUIDLING CODE, MECHANICAL 2004
 NFPA 96-01
  
 1. PG M-1 INFECTION CONTROL PLAN: NOTES CALL FOR
 EX-AHU-3 TO PROVIDE 100% OUTDOOR AIR FOR AREA BEING
 RENOVATED. THERE IS NO AHU-3 SHOWN ON THIS PLAN. PLEASE
 CLARIFY PER FBC 106.1.1.
  
 2. PG A3.0 DETAIL D4 NOTES: REFERS TO PG A13.2 AND
 A13.5 FOR ADDITIONAL INFO. NO SUCH PAGES WERE INCLUDED
 IN PLAN. PLEASE CLARIFY PER FBC 106.1.1.
  
 3. PG A5.1 WHAT PROVISIONS ARE BEING MADE TO MAINTAIN
 FIRE RATED SEPARATION BETWEEN GROUND FLOOR AND FIRST
 FLOOR WHILE SHAFT IS REMOVED FOR REPLACEMENT OF DUCTS?
  
 4. PG A1.0 AND A3.0 SHOW TEMPORARY CONTAINMENT BARRIER
 TO BE 1-HOUR RATED. ARE REQUIRED WHERE DUCTS (OUTSIDE
 AIR FROM EX-AHU-3 AND TEMPORARY EF) PENETRATE THE RATED
 ASSEMBLY PER FBC,M 607.5.
  
 5. PG M-2 PLAN NOTE #5: NO INFORMATION REGARDING THE
 REMOVAL OF A THROUGH-WALL FAN COULD BE FOUND IN
 ARCHITECTURAL DRAWINGS. PLEASE CLARIFY PER FBC
 106.1.1.
  
 6. PG M-1 FAN SCHEDULE SHOWS EX-EF-1 MOVING 13,700 CFM.
 PG M-5 KITCHEN AIR BALANCE SCHEDULE SHOWS EX-EF-1
 MOVING 2530 CFM. THESE TWO SCHEDULES DO NOT MATCH. IT
 ALSO APPEARS THAT THERE IS AN EXTRA 2530 CFM IF EXHAUST
 IN THE KITCHEN AIR BALANCE SCHEDULE SINCE EX-EF-1 IS
 ALREADY BEING USED BY THE COMBINED HOODS TO PRODUCE THE
 13,700 CFM LISTED AT THE TOP OF THE SCHEDULE. PLEASE
 CLARIFY PER FBC 106.1.1.
  
 7. PLEASE INDICATE ON PLAN THE THICKNESS OF THE
 STAINLESS STEEL EXHAUST DUCTS TO SHOW COMPLIANCE WITH
 FBC,M 506.3.1.1.
  
 8. PG X1.1 PLEASE REFERENCE SMACNA-95 HVAC DUCT
 CONSTRUCTION STANDARDS - METAL AND FLEXIBLE TO SHOW
 COMPLIANCE WITH FBC,M 603.3.
  
 9. GREASE DUCTS TO BE SLOPED TOWARD THE HOOD AT NOT
 LESS THAN 1/4 UNIT VERTICAL IN 12 UNITS HORIZONTAL PER
 FBC,M 506.3.7.
  
 10. THERE ARE NO CLEANOUTS SHOWN ON HORIZONTAL GREASE
 DUCTS IN KITCHEN AREA. CLEANOUTS LOCATED ON HORIZONTAL
 DUCTS SHALL BE SPACED NOT MORE THAN 20' APART PER FBC,M
 506.3.9.
  
 11. GREASE DUCTS FOR TYPE I HOODS SHALL NOT BE
 INTERCONNECTED UNLESS THEY MEET ALL THE REQUIREMENTS OF
 FBC,M 506.3.5. THIS DESIGN CALLS FOR THE GREASE DUCTS
 FROM HOODS 1,2 AND 7 TO INTERCONNECT AFTER ENTERING THE
 RATED SHAFT ASSEMBLY. THIS DOES NOT COMPLY WITH
 REQUIREMENT #3 OF THIS SECTION.
  
 12. DUCT ENCLOSURE FOR GREASE DUCTS SHALL SERVE ONLY A
 SINGLE GREASE EXHAUST DUCT SYSTEM AND SHALL MEET THE
 MINIMUM AND MAXIMUM CLEARANCE REQUIREMENTS OF FBC,M
 506.3.10. MAKE-UP AIR DUCTS MAY NOT USE THE SAME SHAFT
 ENCLOSURE AS THE GREASE DUCT.
  
 13. DUCTS PENETRATING A SHAFT ENCLOSURE SHALL BE
 PROTECTED WITH APPROVED FIRE AND SMOKE DAMPERS
 INSTALLED IN ACCORDANCE WITH THEIR LISTING PER FBC,M
 607.5.5.1. THIS APPLIES ONLY TO THE MAKE-UP AIR DUCTS.
  
 14. DRAWING SK-1 SHOWS METAL STRAPS OVER TOP OF FAN
 HOUSINGS FOR THE PURPOSE OF ROOF ATTACHMENT. THESE
 STRAPS SHOULD NOT HAVE TO BE REMOVED FOR EQUIPMENT
 SERVICE PANEL ACCESS PER FBC,M 306.1.
  
 NOTE: A SEPARATE PERMIT WILL BE NEEDED FOR THE REQUIRED
 MECHANICAL HOOD SUPPRESSION SYSTEM.
  
 IF YOU HAVE ANY QUESTIONS PLEASE FEEL FREE TO CONTACT
 ME.
  
 RONALD J REGUEIRO
 561-805-6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved