Date Text
2007-02-23 13:47:02DENIED BY BUILDING
  
 1) PLANS ARE REQUIRED TO HAVE THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THEM. FBC* 106.
  
 2) FBC * 106.1.1 REQUIRES CONSTRUCTION DOCUMENTS SHALL
 BE OF SUFFICIENT CLARITY TO INDICATE THE LOCATION,
 NATURE AND EXTENT OF THE WORK PROPOSED AND SHOW IN
 DETAIL THAT IT WILL CONFORM TO THE PROVISIONS OF THIS
 CODE AND RELEVANT LAWS, ORDINANCES, RULES AND
 REGULATIONS, AS DETERMINED BY THE BUILDING OFFICIAL.
  
 3) FBC * 106.1.3 QUALITY OF BUILDING PLANS. BUILDING
 PLANS SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON
 SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM.
  
 4) FBC R312 AND FBC CHAPTER 11 REQUIRES AT LEAST ONE
 BATHROOM, LOCATED WITH MAXIMUM POSSIBLE PRIVACY, WHERE
 BATHROOMS ARE PROVIDED ON HABITABLE GRADE LEVELS, WITH
 A DOOR THAT HAS A 29-INCH (737 MM) CLEAR OPENING.
 HOWEVER, IF ONLY A TOILET ROOM IS PROVIDED AT GRADE
 LEVEL, SUCH TOILET ROOMS SHALL HAVE A CLEAR OPENING OF
 NOT LESS THAN 29 INCHES (737 MM). NEW MASTER BATH IS
 REQUIRED TO COMPLY.
  
 5) PLANS NEED TO SPECIFY THE WINDOW TYPE (I.E. SINGLE
 HUNG, FIXED, ETC.), LOCATION OF EACH, ETC. AND WHICH
 ONES ARE BEING REPLACED.
  
 6) SPECIFY WHICH EXTERIOR DOORS ARE BEING REPLACED.
  
 7) PLANS NEED TO SPECIFY THE LOCATIONS WHERE THE
 DRYWALL IS BEING REPLACED. IF ALL THE WALLS AND CEILING
 DRYWALL IS BEING REPLACED SPECIFY THAT ON THE PLANS.
  
 8) PLANS NEED TO SPECIFY WHICH WALLS ARE NEW AND WHICH
 ARE EXISTING.
  
 9) PLANS NEED TO SPECIFY THE R-VALUE OF THE INSULATION
 AND THE LOCATIONS OF WHERE EACH TYPE IS BEING
 INSTALLED.
  
 10) ENERGY CALC. FORM SPECIFIES EXTERIOR MASONRY WALLS
 WITH R-11 INSULATION. TYPICALLY MASONRY WALLS ARE
 INSULATED WITH R-5. SPECIFY HOW THE EXTERIOR MASORY
 WALLS ARE BEING INSULATED TO ACHIEVE R-11.
  
 11) SUBMIT A KEY PLAN AND INSTALLATION SCHEDULE FOR THE
 STORM PANELS. SPECIFY THE FASTENER TYPE AND SPACING,
 THE CONNECTION TYPE, THE EDGE DISTANCE, WIND PRESSURE,
 SEPARATION DISTANCE, SPANS, ETC. CIRCLE THE APPROPRIATE
 ITEMS ON THE NOA AND FILL OUT ATTACHED INSTALLATION
 SCHEDULE OR PROVIDE ONE OF YOUR OWN
  
 12) SUBMIT PRODUCT APPROVALS FOR THE STRUCTURAL WINDOW
 MULLIONS.
  
  
 13) ON THE PRODUCT APPROVAL FOR THE GAF MODIFIED ROOF
 SYSTEM INDICATE WHICH ONE OF THE APPROVED SYSTEMS WILL
 BE INSTALLED. SEE PAGES 9-31 OF NOA. INDICATE THE
 FASTENING OPTION AND DESIGN PRESSURE THAT WILL BE USED
 TO INSTALL THE SYSTEM. IF ENHANCED FASTENING IS
 REQUIRED TO INCREASE THE DESIGN PRESSURES AT THE
 PERIMETER AND CORNER AREAS, SUBMIT RAS 117 CALCULATIONS
 AS REQUIRED BY LIMITATION #7. SEE PAGE 32.
  
 14) THE FL COVER SHEET SUBMITTED FOR THE GAF MODIFIED
 ROOF SYSTEM IS NOT THE CORRECT ONE. THE CORRECT ONE IS
 FL 617-R1.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved