2007-02-01 09:11:58 | PLEASE PROVIDE FOLLOWING INFO: |
| |
| 1.PLEASE MAKE SURE ALL STANDARDS NOTES ON DRAWINGS MUST |
| MEET CITY OF WPB, & ADA REQUIREMENTS FOR SIDEWALK WIDTH |
| , ITS SLOPE, DRIVEWAY, PARKING, HANDICAP PARKING, PAINT |
| PER CITY CODES ETC.,, |
| 2. PLEASE MAKE SURE DUMPSTER & ITS ENCLOSURE LOCATION |
| ON DWG, MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| SIDEWALK ELEVATION MUST MEET FL BLDG CODE, PLEASE SHOW |
| ON THE DRAWINGS. |
| 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO TECH |
| REPORT. |
| 5.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| OR2.5"CRITERIA, ?PERVIOUS AREA, LIKE GREEN, |
| LAKES, ETC,IMPERVIOUS AREA CAL., |
| 6. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| PROJECT ONLY ? SO, WE CAN CHECK PERVIOUS, IMPERVIOUS |
| CAL. |
| 7. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| 8.ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| YOUR SITE FOR STORM WATER DRAIN. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL IN A LETTER & ON |
| DRAWINGS AS REVISIONS TO EXPEDITE YOUR PERMITTING |
| PROCESS |
| |