Plan Review Notes
Plan Review Notes For Permit 07010472
Permit Number 07010472
Review Stop P
Sequence Number 2
Notes
Date Text
2007-05-09 17:16:08DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 CHAPTER 11
 FBC-2004 BUILDING
 FBC-2004 CHAPTER 1
  
 CORE/SHELL ONLY
  
 ****FROM PREVIOUS REVIEW:
  
 1. SHT GV-101 CODE REFERENCES ARE INCORRECT. THE CODE
 ADOPTED IS THE FBC-2004 WITH 2005, & 2006 REVISIONS.
 PLEASE INDICATE THE CORRECT CODE REFERENCE FOR DESIGN &
 CONSTRUCTION. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT THERE ARE STILL SOME CODES
 DATED 2001, & 2000. ALL CODES SHALL REFLECT THE CODE IN
 EFFECT AT THIS TIME.
  
 2. OK
 3. OK
 4. OK
  
 5. SHT AF-103 SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106 & 1107 AND ALL
 SUBSECTIONS. INDICATE THE SQUARE FOOTAGE OF EACH AREA,
 PLUS 1/2 THE AREA OF ALL VERTICAL WALLS, INCLUDING
 PARAPETS, PLUS ANY ROOF AREA THAT DRAINS ONTO THE ROOF
 AREAS FROM ABOVE. IF SCUPPERS ARE USED, SUBMIT A DETAIL
 SHOWING THE LENGTH, WIDTH, AND THE MEASUREMENT FROM THE
 ROOF TO THE FLOW LINE OF THE SCUPPER. SECTION
 1503.4.2.
 ****RESPONSE NOTED, BUT SHT AF-103 SEEM TO INDICATE
 THAT THE CENTER OF THE ROOF IS EITHER THE HIGH POINT OR
 THE LOW POINT OF THE ROOF. PLEASE INDICATE THE SLOPE OF
 THE ROOF AND INDICATE HIGH & LOW POINTS OF THE ROOF.
 SECTION 106.2.1 (MORE INFORMATION REQUIRED).--THE
 SECONDARY ROOF DRAINS ARE NOT SHOWN ON THE MAIN ROOF
 PLAN. PLEASE INDICATE THE LOCATION OF THE SECONDARY
 ROOF DRAINS. IF THE SECONDARY ROOF DRAINS FOR THE MAIN
 ROOF ARE TO BE SCUPPERS, SUBMIT A DETAIL SHOWING THE
 HEIGHT, WIDTH, AND INDICATE THE HEIGHT OFF THE ROOF TO
 THE FLOW LINE. TABLE 1106.3 AND SECTIONS 1107.1 &
 1107.2 AND BUILDING CODE SECTION 1503.4.3
  
 6. INFORMATIONAL. IN PHASE III THE ACCESSIBILITY
 REQUIREMENTS WILL BE REQUIRED PER SECTIONS 11-4.15,
 11-4.16, 11-4.18, 11-4.19, 11-4.21, 11-4.22, AND
 11-4.24. ALSO NO DRINKING FOUNTAINS WERE SEEN.
 ****RESPONSE NOTED, OK
  
 7. IN PHASE III PLEASE SUBMIT CALCULATIONS FOR MINIMUM
 FACILITIES PER TABLES 1004.1.2 & 403.1.
 ****RESPONSE NOTED, OK
  
 **********NEW COMMENT**********
  
 1B. SUBMIT A STORM RISER ISOMETRIC DIAGRAM FOR THE NEW
 ROOFS. SECTION 106.3.5.1.3((7)(13).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]


Account Summary | Usage Policy | Privacy Policy