Date |
Text |
2007-01-18 12:10:44 | *** DENIED *** |
| 1) PLEASE SUBMIT ENERGY CALCULATIONS, PER 2004 FBC |
| 13-101.2.2. |
| |
| 2) PLEASE SUBMITMANUAL J CALCULATIONS, PER 2004 FBC |
| 13-607.1.ABC.1 . |
| |
| 3) SEE ONE SET OF PLANS PAGE M/P/E-1 HAS AN ENGINEER'S |
| NAME AND INFORMATION IN THE TITLE BLOCK , SO HIS |
| SIGNATURE AND SEAL MUST ALSO APPEAR IN THE TITLE BLOCK, |
| PER FAC 61G15-23.002. |
| |
| 4) PLEASE SHOW AN EQUIPMENT (A/C) LISTING WITH ALL |
| PERTINENT INFORMATION ON THE MECHANICAL PLANS. |
| |
| 5) THE RETURN AIR GRILL CAN NOT BE LOCATED IN THE |
| MASTER BATHROOM, PER 2004 FBC/R M1602.2(4), PLEASE |
| CORRECT. |
| |
| 6) THE MASTER BATHROOM WITH THE TUB WILL REQUIRE AN |
| EXHAUST FAN, PER 2004 FBC/R R303.3, PLEASE CORRECT. |
| |
| 7) PLEASE SHOW THE SIZE OF ALL SUPPLY AND RETURN AIR |
| GRILLS ON PLANS. |
| |
| 8) PLEASE SHOW THE SIZE OF THE RETURN AIR DUCT (FLEX) |
| ON MECHANICAL PLANS. |
| |
| *** INFORMATIONAL *** |
| BALANCED RETURN AIR MAY BE ACHIEVED BY. |
| (A)TRANSFER DUCTS MAY ACHIEVE THIS BY |
| INCREASING THE RETURN TRANSFER ONE AND |
| ONE HALF TIMES THE CROSS SECTIONAL AREA |
| (SQUARE INCHES) OF THE SUPPLY DUCT |
| ENTERING THE ROOM OR SPACE IT'S SERVING |
| AND THE DOOR HAVING AT LEAST AN |
| UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE |
| PROPER RETURN AIR BALANCE. |
| (C)HABITABLE ROOMS ONLY SHALL BE |
| REQUIRED TO MEET THESE REQUIREMENTS FOR |
| PROPER BALANCED RETURN AIR EXCLUDING |
| BATHROOMS, CLOSETS, STORAGE ROOMS AND |
| LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY |
| AIR INTO THE MASTER SUITE SHALL BE |
| INCLUDED. PER 2004 FBC/R M1602.4 . |
| |
| MECHANICAL PLAN REVIEW BY; |
| TOM GORDON (561) 805-6729. |