Date Text
2007-01-11 08:37:20*** UNSAT **
  
 1) NOTE: PLEASE KNOW ALL OF THE FOLLOWING CODES SHALL
 BE STATED AS RELEVANT TO THE DESIGN AND PLANS. 2005
 NFPA-70
 2002 NFPA-72
 2003 NFPA-101
 ** PLEASE ALSO KNOW AS PERMIT APPLICATION WAS SUBMITTED
 AFTER DECEMBER 7TH,2006, AS OF DECEMBER 8TH, 2006 THE
 2005 NEC BECAME ADOPTED BY THE STATE AS WELL AS THE
 2006 REVISIONS TO THE 2004 FBC.
  
 2) NOTE: PLEASE CLARIFY SERVICE AS SHOWN. PLEASE SEE
 RISER SHOWS THIS BEING FED FROM SERVICE BY OTHERS,
 HOWEVER NO INFORMATION WAS SUBMITTED FOR WHERE AND HOW
 THIS EXISTING SERVICE IS, LOAD, SIZE, ETC.PLEASE SEE
 SOME OF THE FOLLOWING COMMENTS WILL BE BASED ON WHETHER
 OR NOT THIS MDP IS A NEW SE MAIN OR A SUB PANEL.
 COMMENTS WILL BE ALSO BROUGHT UP IF FED ON THE LOAD
 SIDE OF AN EXISTING MAIN, THEN THE GROUNDING ELECTRODE
 SYSTEM AS SHOWN ON RISER WILL CHANGE. PLEASE SEE OTHER
 COMMENTS FOR CORRELATION OF SEVERAL OTHER ELECTRICAL
 ITEMS.
 FBC 106.1.2, 106.3.5.1.2
 NEC 2005
  
 3) NOTE: PLEASE SEE IF THIS IS A NEW SERVICEMAIN, A
 MAIN CIRCUIT BREAKER WILL BE REQUIRED IN THE MDP PER
 230.70, 230.71.
  
 4) NOTE: PLEASE SEE RISER SHOWS THIS PANEL AS BEING
 3-PHASE AND 1-PHASE? PLEASE ALSO SEE MDP WHICH IS THREE
 PHASE FOR BREAKERS TO EACH SUB PANEL, HOWEVER EACH SUB
 PANEL IS ONLY 1-PHASE?
 PLEASE SEE THE SPACE ALLOTTED FOR EACH SUB PANEL SHOWS
 ONLY 2-POLES BEING USED, YET PANEL SHOWS PHASES BEING
 3? PLEASE CORRELATE AS LOADS, SERVICE ETC CAN NOT BE
 CONFIRMED FOR COMPLIANCE AT THIS TIME.
 FBC 106.1.2, 106.3.5.1.2
 PLEASE SEE NEXT COMMENT ALSO.
  
 5) NOTE: PLEASE CORRELATE FEEDERS TO SUB PANELS. RISER
 SHOWS BOTH 4/0'S AND #3'S TO EACH?
 PLEASE SEE ONE SHOWS 3-PHASE FOR THE NUMBER OF FEEDERS
 AND THE OTHER SHOWS 1-PHASE FOR THE SAME. PLEASE SEE
 PANELS FOR EACH SUB PANEL ARE SHOWN AS 1-PHASE WITH A
 2-POLE 80AMP BREAKER OR 100A BREAKER. PLEASE ALSO KNOW
 THAT 4/0'S WILL NOT FIT INTO A 80AMP OR 100AMP
 BREAKERS.
 PLEASE CORRELATE ALL OF THE FEEDERS, THE PHASING, ETC
 PLEASE KNOW COMPLIANCE FOR MANY ITEMS CAN NOT BE
 REVIEWED AT THIS TIME DUE TO SOME COORDINATION ISSUES.
 FBC 106.1.2, 106.3.5.1.2,
 NEC 215.3, 215.5, 230, 310.16, 240.4 ETC
  
 6) NOTE: PLEASE SEE RISER MENTIONS 1 1/2INCH THWN,
 WHICH SEEMS TO BE A MISPRINT WHICH SHOULD READ CONDUIT
 INSTEAD, UNLESS THE CONDUIT IS THE 2INCH AS NOTED
 DIRECTLY ABOVE.
 FBC 106.1.2
  
 7) NOTE: PLEASE SEE 250.50 AND 250.32 FOR THIS
 STRUCTURE IS BEING FED FROM AN EXISTING SERVICE AND IS
 ON THE LOAD SIDE OF AN EXISTING MAIN. PLEASE SEE THE
 NEUTRAL AND THE GROUNDING ELECTRODE AT THIS DETACHED
 BUILDING SHALL NOT BE BONDED TOGETHER. IF THIS IS A NEW
 SERVICE THEN THE RISER WILL BE CHANGING BASED ON THE
 NEW SERVICE ENTRANCE CONDUCTORS WHICH WILL NOT CONTAIN
 AN EQUIPMENT GROUNDING CONDUCTOR.
 250.6, 250.24B
 PLEASE ALSO SEE MISSING FOOTER STEEL FROM GROUNDING
 RISER. MENTIONS BUILDING STEEL WHICH IS REQUIRED TO BE
 PART OF THE SYSTEM, HOWEVER FOOTER STEEL COULD NOT BE
 LOCATED.250.50
  
 8) NOTE: PLEASE CLARIFY THE OCCUPANCY SENSORS AS SHOWN.
 PLEASE SEE SOME ROOMS DO NOT CONTAIN THESE. PLEASE
 STATE THE TIMES.
 PLEASE INDICATE THAT THE EMERGENCY AND EXIT LIGHTS
 SHALL BE CONNECTED AHEAD OF THESE DEVICES. THIS AHJ HAS
 HAD NUMEROUS INSTANCES WHERE THE CONNECTION OF THE
 EMERGENCY AND EXIT LIGHTS ARE BEING DONE ON THE LOAD
 SIDE OF THESE OC DEVICES. PLEASE PROVIDE NOTE/DETAIL
 FOR THIS.
 700.12E.
  
 9) NOTE: PLEASE SEE THAT MINIMUM STROBES AND HORN
 LEVELS SHALL BE STATED ON PLANS FOR FBC 11-4.28.2,
 .3(4).
 ** PLEASE KNOW EVEN THOUGH THE FIRE ALARM WILL BE UNDER
 A SEPARATE PERMIT THIS IS REQUIRED ON THE PLANS AT THIS
 TIME.
 ** PLEASE ALSO KNOW THE SECURITY SYSTEM AS SHOWN WILL
 ALSO BE UNDER A SEPARATE PERMIT.
  
 10) NOTE: PLEASE CLARIFY TITLE BLOCK AND LICENSURE FOR
 FIR. PLEASE SEE A BRUH- HOSEIN-RUPP IS BEING SHOWN,
 HOWEVER LICENSURE IS STATED FOR ROYAL ARCHITECTURE. THE
 STATE DEPARTMENT OF BUSINESS AND PROFESSIONAL
 REGULATION?S WEBSITE DOES NOT CONTAIN ANY RELEVANT
 INFORMATION FOR OTHER NAMES RELATED TO THIS LICENSE AS
 SHOWN.
  
 11) NOTE: PLEASE SUBMIT COMPLETE LOAD CALCULATIONS IF
 THE SERVICE AS SHOWN IS BEING FED FROM AN EXISTING
 SERVICE.
 220, 215.3, 230.42
 PLEASE ALSO SEE THAT ALL CONTINUOUS LOADS SHALL BE
 SHOWN AT 125%. 215.3 AND 230.42.
  
  
 ** PLEASE KNOW AS THERE ARE SEVERAL UNANSWERED
 QUESTIONS WITH THE RISER/PANELS AND FEEDERS THERE MAY
 BE FURTHER COMMENTS ON NEXT REVIEW.
  
 ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
  
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]