Date |
Text |
2007-01-11 08:37:20 | *** UNSAT ** |
| |
| 1) NOTE: PLEASE KNOW ALL OF THE FOLLOWING CODES SHALL |
| BE STATED AS RELEVANT TO THE DESIGN AND PLANS. 2005 |
| NFPA-70 |
| 2002 NFPA-72 |
| 2003 NFPA-101 |
| ** PLEASE ALSO KNOW AS PERMIT APPLICATION WAS SUBMITTED |
| AFTER DECEMBER 7TH,2006, AS OF DECEMBER 8TH, 2006 THE |
| 2005 NEC BECAME ADOPTED BY THE STATE AS WELL AS THE |
| 2006 REVISIONS TO THE 2004 FBC. |
| |
| 2) NOTE: PLEASE CLARIFY SERVICE AS SHOWN. PLEASE SEE |
| RISER SHOWS THIS BEING FED FROM SERVICE BY OTHERS, |
| HOWEVER NO INFORMATION WAS SUBMITTED FOR WHERE AND HOW |
| THIS EXISTING SERVICE IS, LOAD, SIZE, ETC.PLEASE SEE |
| SOME OF THE FOLLOWING COMMENTS WILL BE BASED ON WHETHER |
| OR NOT THIS MDP IS A NEW SE MAIN OR A SUB PANEL. |
| COMMENTS WILL BE ALSO BROUGHT UP IF FED ON THE LOAD |
| SIDE OF AN EXISTING MAIN, THEN THE GROUNDING ELECTRODE |
| SYSTEM AS SHOWN ON RISER WILL CHANGE. PLEASE SEE OTHER |
| COMMENTS FOR CORRELATION OF SEVERAL OTHER ELECTRICAL |
| ITEMS. |
| FBC 106.1.2, 106.3.5.1.2 |
| NEC 2005 |
| |
| 3) NOTE: PLEASE SEE IF THIS IS A NEW SERVICEMAIN, A |
| MAIN CIRCUIT BREAKER WILL BE REQUIRED IN THE MDP PER |
| 230.70, 230.71. |
| |
| 4) NOTE: PLEASE SEE RISER SHOWS THIS PANEL AS BEING |
| 3-PHASE AND 1-PHASE? PLEASE ALSO SEE MDP WHICH IS THREE |
| PHASE FOR BREAKERS TO EACH SUB PANEL, HOWEVER EACH SUB |
| PANEL IS ONLY 1-PHASE? |
| PLEASE SEE THE SPACE ALLOTTED FOR EACH SUB PANEL SHOWS |
| ONLY 2-POLES BEING USED, YET PANEL SHOWS PHASES BEING |
| 3? PLEASE CORRELATE AS LOADS, SERVICE ETC CAN NOT BE |
| CONFIRMED FOR COMPLIANCE AT THIS TIME. |
| FBC 106.1.2, 106.3.5.1.2 |
| PLEASE SEE NEXT COMMENT ALSO. |
| |
| 5) NOTE: PLEASE CORRELATE FEEDERS TO SUB PANELS. RISER |
| SHOWS BOTH 4/0'S AND #3'S TO EACH? |
| PLEASE SEE ONE SHOWS 3-PHASE FOR THE NUMBER OF FEEDERS |
| AND THE OTHER SHOWS 1-PHASE FOR THE SAME. PLEASE SEE |
| PANELS FOR EACH SUB PANEL ARE SHOWN AS 1-PHASE WITH A |
| 2-POLE 80AMP BREAKER OR 100A BREAKER. PLEASE ALSO KNOW |
| THAT 4/0'S WILL NOT FIT INTO A 80AMP OR 100AMP |
| BREAKERS. |
| PLEASE CORRELATE ALL OF THE FEEDERS, THE PHASING, ETC |
| PLEASE KNOW COMPLIANCE FOR MANY ITEMS CAN NOT BE |
| REVIEWED AT THIS TIME DUE TO SOME COORDINATION ISSUES. |
| FBC 106.1.2, 106.3.5.1.2, |
| NEC 215.3, 215.5, 230, 310.16, 240.4 ETC |
| |
| 6) NOTE: PLEASE SEE RISER MENTIONS 1 1/2INCH THWN, |
| WHICH SEEMS TO BE A MISPRINT WHICH SHOULD READ CONDUIT |
| INSTEAD, UNLESS THE CONDUIT IS THE 2INCH AS NOTED |
| DIRECTLY ABOVE. |
| FBC 106.1.2 |
| |
| 7) NOTE: PLEASE SEE 250.50 AND 250.32 FOR THIS |
| STRUCTURE IS BEING FED FROM AN EXISTING SERVICE AND IS |
| ON THE LOAD SIDE OF AN EXISTING MAIN. PLEASE SEE THE |
| NEUTRAL AND THE GROUNDING ELECTRODE AT THIS DETACHED |
| BUILDING SHALL NOT BE BONDED TOGETHER. IF THIS IS A NEW |
| SERVICE THEN THE RISER WILL BE CHANGING BASED ON THE |
| NEW SERVICE ENTRANCE CONDUCTORS WHICH WILL NOT CONTAIN |
| AN EQUIPMENT GROUNDING CONDUCTOR. |
| 250.6, 250.24B |
| PLEASE ALSO SEE MISSING FOOTER STEEL FROM GROUNDING |
| RISER. MENTIONS BUILDING STEEL WHICH IS REQUIRED TO BE |
| PART OF THE SYSTEM, HOWEVER FOOTER STEEL COULD NOT BE |
| LOCATED.250.50 |
| |
| 8) NOTE: PLEASE CLARIFY THE OCCUPANCY SENSORS AS SHOWN. |
| PLEASE SEE SOME ROOMS DO NOT CONTAIN THESE. PLEASE |
| STATE THE TIMES. |
| PLEASE INDICATE THAT THE EMERGENCY AND EXIT LIGHTS |
| SHALL BE CONNECTED AHEAD OF THESE DEVICES. THIS AHJ HAS |
| HAD NUMEROUS INSTANCES WHERE THE CONNECTION OF THE |
| EMERGENCY AND EXIT LIGHTS ARE BEING DONE ON THE LOAD |
| SIDE OF THESE OC DEVICES. PLEASE PROVIDE NOTE/DETAIL |
| FOR THIS. |
| 700.12E. |
| |
| 9) NOTE: PLEASE SEE THAT MINIMUM STROBES AND HORN |
| LEVELS SHALL BE STATED ON PLANS FOR FBC 11-4.28.2, |
| .3(4). |
| ** PLEASE KNOW EVEN THOUGH THE FIRE ALARM WILL BE UNDER |
| A SEPARATE PERMIT THIS IS REQUIRED ON THE PLANS AT THIS |
| TIME. |
| ** PLEASE ALSO KNOW THE SECURITY SYSTEM AS SHOWN WILL |
| ALSO BE UNDER A SEPARATE PERMIT. |
| |
| 10) NOTE: PLEASE CLARIFY TITLE BLOCK AND LICENSURE FOR |
| FIR. PLEASE SEE A BRUH- HOSEIN-RUPP IS BEING SHOWN, |
| HOWEVER LICENSURE IS STATED FOR ROYAL ARCHITECTURE. THE |
| STATE DEPARTMENT OF BUSINESS AND PROFESSIONAL |
| REGULATION?S WEBSITE DOES NOT CONTAIN ANY RELEVANT |
| INFORMATION FOR OTHER NAMES RELATED TO THIS LICENSE AS |
| SHOWN. |
| |
| 11) NOTE: PLEASE SUBMIT COMPLETE LOAD CALCULATIONS IF |
| THE SERVICE AS SHOWN IS BEING FED FROM AN EXISTING |
| SERVICE. |
| 220, 215.3, 230.42 |
| PLEASE ALSO SEE THAT ALL CONTINUOUS LOADS SHALL BE |
| SHOWN AT 125%. 215.3 AND 230.42. |
| |
| |
| ** PLEASE KNOW AS THERE ARE SEVERAL UNANSWERED |
| QUESTIONS WITH THE RISER/PANELS AND FEEDERS THERE MAY |
| BE FURTHER COMMENTS ON NEXT REVIEW. |
| |
| ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| |
| |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |