2006-12-07 08:51:04 | *** UNSAT *** |
| |
| 1) NOTE:PLEASE SEE LOADS FOR SHOW WINDOWS NEED TO BE |
| CLARIFIED PER 220.12A. PLEASE SEE AS THE VA IS NOT |
| SHOWN AND NO LOAD SUMMARY IS SHOWN, THE VA PER FOOT CAN |
| NOT BE VERIFIED. |
| 210.62 |
| |
| 2) NOTE: PLEASE VERIFY THE LOAD SHOWN FOR THE SIGN |
| CIRCUIT(S). PLEASE SEE 600.5, WHICH REFERENCES TO |
| 220.3B6 FOR THE MINIMUM VA TO USE TO FIGURE FOR SIGN |
| CIRCUITS. PLEASE SEE THE LOAD OF 5A?S FOR EACH DOES NOT |
| CORRELATE TO THE MINIMUM VA REQUIRED. |
| PLEASE SEE NO LOAD SUMMARY IS SHOWN TO VERIFY THIS. |
| |
| 3) NOTE: PLEASE CORRELATE LOADS ON PANEL FOR KNOWN |
| RECEPTS ON A CIRCUIT. 220.13 |
| |
| 4) NOTE: PLEASE SEE A NOTE ON "E" UNIT INDICATES |
| RECEPTACLE ABOVE CEILING AS TYPICAL FOR EACH SIGN |
| CIRCUIT. PLEASE SEE 600.5, AS IT ONLY REQUIRES A |
| CIRCUIT. PLEASE SEE 400.8(2) WHICH DO NOT PERMIT |
| RECEPTACLES ABOVE CEILINGS AS THIS WOULD THEN CREATE |
| THE ISSUE OF CORDS BEING RUN THROUGH CEILINGS WHICH IS |
| NOT PERMITTED. |
| PLEASE REVISE. |
| |
| 5) NOTE: PLEASE CLARIFY THE GROUNDING ELECTRODE SYSTEM |
| AS SHOWN. RISER SHOWS THE MAIN GROUNDING ELECTRODE |
| BEING "TAPPED" AND SHOWN TO EACH MAIN DISCONNECT?? |
| PLEASE SEE 250.24B, 250.6. PLEASE KNOW WHEN INSTALLING |
| THE GUTTER, THE NEUTRAL CONDUCTOR WOULD BE "BONDED" TO |
| THE GUTTER WHICH MAY CONTAIN THE SOLE CONNECTION OF THE |
| GEC. PLEASE SEE ONLY ONE SET OF PHASE AND NEUTRAL |
| CONDUCTORS WOULD THEN BE ROUTED TO EACH METER AND MAIN. |
| EACH NEUTRAL WOULD BE BONDED TO THE ENCLOSURE AT THE |
| FIRST MEANS OF DISCONNECT. |
| PLEASE SEE AS SHOWN THIS SEEM TO BE AN INTERESTING |
| SCENARIO AT THE CONNECTION POINT SHOWN AT THE GROUND |
| LEVEL LOCATION. |
| ** PLEASE SEE THIS BEING AN EXISTING BUILDING AND THE |
| CONCRETE ENCASED ELECTRODE ON AN EXISTING BUILDING IS |
| NOT REQUIRED TO BE ATTACHED. PLEASE KNOW IF SHOWN ON |
| GROUNDING ELECTRODE DETAIL BEING REQUIRED THEN THIS |
| WILL BE REQUIRED IN THE FIELD. PLEASE VERIFY THIS BEING |
| REQUIRED AND POSSIBLY AFFECTING THE STRUCTURAL |
| INTEGRITY OF THE EXISTING FOOTER. |
| |
| 6) NOTE: PLEASE LIST THE FOLLOWING RELEVANT CODES ON |
| THE PLANS. 2002 NFPA-70, 2003 NFPA-101 |
| |
| 7) NOTE: PLEASE CORRELATE LOADS, OVER CURRENT |
| PROTECTION, CONDUCTORS ETC FOR THE A/C SYSTEMS. PLEASE |
| SEE ELECTRICAL PLANS SEEM TO INDICATE A POSSIBLE 5KW |
| LOAD, HOWEVER AS KW RATINGS/ KVA LOADS ARE NOT SHOWN, |
| THESE ARE UNCLEAR AT THIS TIME. PLEASE SEE MECHANICAL |
| PLANS CALL FOR 8KW AND 10KW UNITS. |
| PLEASE SEE 424.3B, 310.16, 240.4 ETC |
| FBC 106.1.2 ADMIN SECTION. |
| |
| * ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |