2006-12-12 15:24:39 | DENIED |
| REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1 |
| |
| THE FOLLOWING CORRECTIONS ARE REQUIRED FOR GAS PLAN |
| REVIEW TO MEET CODE COMPLIANCE: |
| |
| 1. NOTE: ONLY ONE SET OF GAS DRAWINGS AND SUBMITTALS |
| WERE SUBMITTED WITH THE GEN/RES PERMIT APPLICATION.A |
| MINIMUM OF TWO (2) COMPLETE SETS OF GAS DRAWINGS AND |
| SUBMITTALS ARE REQUIRED FOR PLAN REVIEW PER FBC-2004 |
| CHAPTER 1, SECTION 106.1. |
| |
| 2. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2004 |
| FUEL GAS CODE. |
| NOTE: PLEASE INCLUDE BOTH THE ABOVE AND UNDERGROUND |
| PIPING AND THE LOCATION OF THE 1ST AND 2ND STAGE |
| REGULATORS. |
| |
| 3. SHOW TYPE OF PIPING MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE BEING USED. |
| NOTE: PLEASE INCLUDE BOTH THE ABOVE AND UNDERGROUND |
| PIPING MATERIALS AND SIZES. |
| |
| 4. BTU LOAD OF EACH APPLIANCE AND THE |
| TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU |
| 402.4(33). |
| |
| 5. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2 |
| NOTE: NEED MANUFACTURER SHEETS AND INSTALLATION |
| INSTRUCTIONS REGAURDING CLEARENCES FOR THE GENERATOR. |
| PLEASE SUBMIT MANUFACTURER SHEETS OF 1ST AND 2ND STAGE |
| REGULATORS. |
| |
| 6. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| NAME, AND ALSO DATE DRAWING. PLEASE DO |
| THIS PRIOR TO RESUBMITTING. |
| |
| 7. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| |
| 8. CLEARLY INDICATE ON THE PLAN IF THE |
| LP TANK IS ABOVE OR BELOW GROUND, AND |
| SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| PER NFPA 58. IF THE TANK |
| IS BELOW GROUND THE CONTAINER SHALL BE |
| SECURILY ANCHORED PER NFPA 58 SECTION |
| 3-2.2.7(H). |
| |