2006-12-12 15:24:39DENIED
 REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1
  
 THE FOLLOWING CORRECTIONS ARE REQUIRED FOR GAS PLAN
 REVIEW TO MEET CODE COMPLIANCE:
  
 1. NOTE: ONLY ONE SET OF GAS DRAWINGS AND SUBMITTALS
 WERE SUBMITTED WITH THE GEN/RES PERMIT APPLICATION.A
 MINIMUM OF TWO (2) COMPLETE SETS OF GAS DRAWINGS AND
 SUBMITTALS ARE REQUIRED FOR PLAN REVIEW PER FBC-2004
 CHAPTER 1, SECTION 106.1.
  
 2. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
 NOTE: PLEASE INCLUDE BOTH THE ABOVE AND UNDERGROUND
 PIPING AND THE LOCATION OF THE 1ST AND 2ND STAGE
 REGULATORS.
  
 3. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 NOTE: PLEASE INCLUDE BOTH THE ABOVE AND UNDERGROUND
 PIPING MATERIALS AND SIZES.
  
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
  
 5. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2
 NOTE: NEED MANUFACTURER SHEETS AND INSTALLATION
 INSTRUCTIONS REGAURDING CLEARENCES FOR THE GENERATOR.
 PLEASE SUBMIT MANUFACTURER SHEETS OF 1ST AND 2ND STAGE
 REGULATORS.
  
 6. FBC-2004 CHAPTER 1,SECTION 106.3.4.2:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING. PLEASE DO
 THIS PRIOR TO RESUBMITTING.
  
 7. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 8. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved