2007-06-08 16:10:21FAILED
  
 1) RESPOND TO COMMENTS IN WRITING.
  
 2) DUMPSTER AND ADA PARKING DETAILS DO NOT MEET CITY
 CODE (SHEET A3) - REPEAT COMMENT.
  
 3) WHERE IS THE LANDSCAPE AREA FOR THE LONE DUMPSTER
 BEHIND THE BUILDING - REPEAT COMMENT.
  
 4) THE ELEVATIONS DO NOT MATCH THOSE APPROVED BY
 ORDINANCE NO. 3987-06.
  
 5) SIGNS ARE TO BE UNDER A SEPARATE PERMIT.
  
 6) WHERE IS THE LANDSCAPE PLAN?
  
 7) THE 12 FOOT EASEMENT ALONG THE 45TH STREET FRONTAGE
 IS TO BE FOR FUTURE ROAD WIDENING, NOT UTILITY PURPOSES
 AS STATED ON THE SITE PLAN.
  
 8) NOT ALL CONDITIONS OF ORD. NO. 3987-06 HAVE BEEN
 MET:
  
 A) THE PROPERTY OWNER SHALL POST SURETY IN THE AMOUNT
 OF ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00)
 WITHIN TWELVE (12) MONTHS OF THIS DEVELOPMENT ORDER
 (DUE BY OCTOBER 10, 2007) IN A FORM ACCEPTABLE TO THE
 COUNTY ATTORNEY TO ASSURE THE INSTALLATION OF THE
 TRAFFIC SIGNAL WHEN WARRANTED.
  
 B) AT SUCH TIME AS THE PROPERTY OWNER COMPLETES THE
 DRAINAGE PLAN FOR THE PROJECT, THE PROPERTY OWNER SHALL
 NOTIFY THE COUNTY?S ROADWAY PRODUCTION DIVISION IF THE
 PROJECT HAS ANY EXCESS STORMWATER RETENTION CAPACITY
 THAT CAN BE MADE AVAILABLE TO THE COUNTY FOR THE
 WIDENING OF 45TH STREET FROM TWO (2) LANES TO FOUR (4)
 LANES FROM HAVERHILL ROAD TO THE FLORIDA TURNPIKE.IF
 THERE IS EXCESS CAPACITY AVAILABLE, THE PROPERTY OWNER
 SHALL MAKE THAT CAPACITY AVAILABLE TO THE COUNTY
 THROUGH THE DEDICATION OF A TWENTY FOOT (20?) DRAINAGE
 EASEMENT FROM THE ROAD RIGHT-OF-WAY TO THE ULTIMATE
 OUTFALL.THE DRAINAGE EASEMENT SHALL COVER THE ENTIRE
 POND.
  
 C) NO MORE THAN 1,146 NEW DAILY TRIPS MAY BE PERMITTED
 UNTIL CONTRACT IS LET FOR WIDENING OF HAVERHILL ROAD TO
 FIVE (5) LANES, FROM 45TH STREET TO CARIBBEAN
 BOULEVARD.
  
 D) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE
 THAT 85 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO
 LETTING OF THE CONTRACT FOR THE FOUR (4) LANING OF
 HAVERHILL ROAD, FROM BEELINE HIGHWAY TO 45TH STREET.
  
 E) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE
 THAT 103 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO
 LETTING OF THE CONTRACT FOR THE FOLLOWING IMPROVEMENTS
 AT THE INTERSECTION OF HAVERHILL ROAD AND ROEBUCK
 ROAD:
  
 1. ADDITION OF A SECOND EXCLUSIVE NORTHBOUND LEFT TURN
 LANE.
  
 2. ADDITION OF A SECOND EXCLUSIVE EASTBOUND LEFT TURN
 LANE.
  
 3. RECONFIGURE THE WESTBOUND APPROACH TO PROVIDE ONE
 EXCLUSIVE LEFT TURN LANE, TWO THROUGH LANES AND ONE
 EXCLUSIVE RIGHT-TURN LANE.
  
 F) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE
 THAN 261 NEW EXTERNAL AM PEAK HOUR TRIPS PRIOR TO THE
 LETTING OF THE CONTRACT FOR THE ADDITION OF A SECOND
 NORTHBOUND THROUGH LANE AT THE INTERSECTION OF
 HAVERHILL ROAD AND 45TH STREET.
  
 G) WITHIN SIX (6) MONTHS FROM THE DATE OF THE
 DEVELOPMENT ORDER (DUE BY APRIL 10, 2007), THE
 DEVELOPER MUST ENTER INTO A PUBLIC FACILITIES AGREEMENT
 (PFA) WITH PALM BEACH COUNTY TO FUND AND/OR TO
 CONSTRUCT ANY AND ALL IMPROVEMENTS AS THE TERM IS
 DEFINED BY THE TRAFFIC PERFORMANCE STANDARDS ORDINANCE.
 THE PFA MUST BE IN A FORM ACCEPTABLE TO THE COUNTY
 ENGINEER.THE CITY SHALL NOT ISSUE ANY BUILDING
 PERMITS ASSOCIATED WITH THE PROJECT UNLESS AND UNTIL
 THE PFA HAS BEEN APPROVED BY THE BOARD OF COUNTY
 COMMISSIONERS.
  
 H)A USE CHART SHALL BE SUBMITTED TO THE PLANNING AND
 ZONING AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT
 WITH ALL BUILDING PERMIT AND/OR OCCUPATIONAL LICENSE
 APPLICATIONS STATING THE SQUARE FOOTAGE DEVOTED TO THE
 USES WITHIN BUILDINGS 1, 2 AND 3.THE SPECIFIC SQUARE
 FOOTAGE USE WITHIN EACH BUILDING MAY NOT EXCEED THE
 ALLOWANCES OUTLINED IN THE BUILDING USE SQUARE FOOTAGE
 TABLE (EXHIBIT F), UNLESS THE PROPERTY OWNER PROVIDES A
 TRAFFIC EQUIVALENCY STATEMENT, PREPARED BY A LICENSED
 TRAFFIC ENGINEER, DEMONSTRATING THAT THE APPROVED
 TRAFFIC CONCURRENCY FOR THE PROJECT IS NOT EXCEEDED.
  
 I)A TRAFFIC STATEMENT, PREPARED BY A LICENSED TRAFFIC
 ENGINEER, SHALL BE SUBMITTED TO THE PLANNING AND ZONING
 AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT WITH
 ALL BUILDING PERMIT APPLICATIONS OUTLINING THE NUMBER
 OF DAILY TRIPS, AM TRIPS AND PM TRIPS GENERATED FOR
 EACH USE AND ITS SQUARE FOOTAGE FOR EACH BUILDING.THE
 TRAFFIC STATEMENT SHALL INCLUDE THE TRIPS ASSOCIATED
 WITH THE SPECIFIC USE AND A CUMULATIVE TABLE FOR ALL OF
 THE USES APPROVED IN THE PREMIER PARK OF COMMERCE CPD.
  