2007-06-08 16:10:21 | FAILED |
| |
| 1) RESPOND TO COMMENTS IN WRITING. |
| |
| 2) DUMPSTER AND ADA PARKING DETAILS DO NOT MEET CITY |
| CODE (SHEET A3) - REPEAT COMMENT. |
| |
| 3) WHERE IS THE LANDSCAPE AREA FOR THE LONE DUMPSTER |
| BEHIND THE BUILDING - REPEAT COMMENT. |
| |
| 4) THE ELEVATIONS DO NOT MATCH THOSE APPROVED BY |
| ORDINANCE NO. 3987-06. |
| |
| 5) SIGNS ARE TO BE UNDER A SEPARATE PERMIT. |
| |
| 6) WHERE IS THE LANDSCAPE PLAN? |
| |
| 7) THE 12 FOOT EASEMENT ALONG THE 45TH STREET FRONTAGE |
| IS TO BE FOR FUTURE ROAD WIDENING, NOT UTILITY PURPOSES |
| AS STATED ON THE SITE PLAN. |
| |
| 8) NOT ALL CONDITIONS OF ORD. NO. 3987-06 HAVE BEEN |
| MET: |
| |
| A) THE PROPERTY OWNER SHALL POST SURETY IN THE AMOUNT |
| OF ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00) |
| WITHIN TWELVE (12) MONTHS OF THIS DEVELOPMENT ORDER |
| (DUE BY OCTOBER 10, 2007) IN A FORM ACCEPTABLE TO THE |
| COUNTY ATTORNEY TO ASSURE THE INSTALLATION OF THE |
| TRAFFIC SIGNAL WHEN WARRANTED. |
| |
| B) AT SUCH TIME AS THE PROPERTY OWNER COMPLETES THE |
| DRAINAGE PLAN FOR THE PROJECT, THE PROPERTY OWNER SHALL |
| NOTIFY THE COUNTY?S ROADWAY PRODUCTION DIVISION IF THE |
| PROJECT HAS ANY EXCESS STORMWATER RETENTION CAPACITY |
| THAT CAN BE MADE AVAILABLE TO THE COUNTY FOR THE |
| WIDENING OF 45TH STREET FROM TWO (2) LANES TO FOUR (4) |
| LANES FROM HAVERHILL ROAD TO THE FLORIDA TURNPIKE.IF |
| THERE IS EXCESS CAPACITY AVAILABLE, THE PROPERTY OWNER |
| SHALL MAKE THAT CAPACITY AVAILABLE TO THE COUNTY |
| THROUGH THE DEDICATION OF A TWENTY FOOT (20?) DRAINAGE |
| EASEMENT FROM THE ROAD RIGHT-OF-WAY TO THE ULTIMATE |
| OUTFALL.THE DRAINAGE EASEMENT SHALL COVER THE ENTIRE |
| POND. |
| |
| C) NO MORE THAN 1,146 NEW DAILY TRIPS MAY BE PERMITTED |
| UNTIL CONTRACT IS LET FOR WIDENING OF HAVERHILL ROAD TO |
| FIVE (5) LANES, FROM 45TH STREET TO CARIBBEAN |
| BOULEVARD. |
| |
| D) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| THAT 85 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO |
| LETTING OF THE CONTRACT FOR THE FOUR (4) LANING OF |
| HAVERHILL ROAD, FROM BEELINE HIGHWAY TO 45TH STREET. |
| |
| E) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| THAT 103 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO |
| LETTING OF THE CONTRACT FOR THE FOLLOWING IMPROVEMENTS |
| AT THE INTERSECTION OF HAVERHILL ROAD AND ROEBUCK |
| ROAD: |
| |
| 1. ADDITION OF A SECOND EXCLUSIVE NORTHBOUND LEFT TURN |
| LANE. |
| |
| 2. ADDITION OF A SECOND EXCLUSIVE EASTBOUND LEFT TURN |
| LANE. |
| |
| 3. RECONFIGURE THE WESTBOUND APPROACH TO PROVIDE ONE |
| EXCLUSIVE LEFT TURN LANE, TWO THROUGH LANES AND ONE |
| EXCLUSIVE RIGHT-TURN LANE. |
| |
| F) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| THAN 261 NEW EXTERNAL AM PEAK HOUR TRIPS PRIOR TO THE |
| LETTING OF THE CONTRACT FOR THE ADDITION OF A SECOND |
| NORTHBOUND THROUGH LANE AT THE INTERSECTION OF |
| HAVERHILL ROAD AND 45TH STREET. |
| |
| G) WITHIN SIX (6) MONTHS FROM THE DATE OF THE |
| DEVELOPMENT ORDER (DUE BY APRIL 10, 2007), THE |
| DEVELOPER MUST ENTER INTO A PUBLIC FACILITIES AGREEMENT |
| (PFA) WITH PALM BEACH COUNTY TO FUND AND/OR TO |
| CONSTRUCT ANY AND ALL IMPROVEMENTS AS THE TERM IS |
| DEFINED BY THE TRAFFIC PERFORMANCE STANDARDS ORDINANCE. |
| THE PFA MUST BE IN A FORM ACCEPTABLE TO THE COUNTY |
| ENGINEER.THE CITY SHALL NOT ISSUE ANY BUILDING |
| PERMITS ASSOCIATED WITH THE PROJECT UNLESS AND UNTIL |
| THE PFA HAS BEEN APPROVED BY THE BOARD OF COUNTY |
| COMMISSIONERS. |
| |
| H)A USE CHART SHALL BE SUBMITTED TO THE PLANNING AND |
| ZONING AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT |
| WITH ALL BUILDING PERMIT AND/OR OCCUPATIONAL LICENSE |
| APPLICATIONS STATING THE SQUARE FOOTAGE DEVOTED TO THE |
| USES WITHIN BUILDINGS 1, 2 AND 3.THE SPECIFIC SQUARE |
| FOOTAGE USE WITHIN EACH BUILDING MAY NOT EXCEED THE |
| ALLOWANCES OUTLINED IN THE BUILDING USE SQUARE FOOTAGE |
| TABLE (EXHIBIT F), UNLESS THE PROPERTY OWNER PROVIDES A |
| TRAFFIC EQUIVALENCY STATEMENT, PREPARED BY A LICENSED |
| TRAFFIC ENGINEER, DEMONSTRATING THAT THE APPROVED |
| TRAFFIC CONCURRENCY FOR THE PROJECT IS NOT EXCEEDED. |
| |
| I)A TRAFFIC STATEMENT, PREPARED BY A LICENSED TRAFFIC |
| ENGINEER, SHALL BE SUBMITTED TO THE PLANNING AND ZONING |
| AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT WITH |
| ALL BUILDING PERMIT APPLICATIONS OUTLINING THE NUMBER |
| OF DAILY TRIPS, AM TRIPS AND PM TRIPS GENERATED FOR |
| EACH USE AND ITS SQUARE FOOTAGE FOR EACH BUILDING.THE |
| TRAFFIC STATEMENT SHALL INCLUDE THE TRIPS ASSOCIATED |
| WITH THE SPECIFIC USE AND A CUMULATIVE TABLE FOR ALL OF |
| THE USES APPROVED IN THE PREMIER PARK OF COMMERCE CPD. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1435 |