2007-04-30 16:39:36---------------DENIED------------------
  
 THE FIRST SET OF COMMENTS ARE NUMBERED TO CORRESPOND
 WITH PREVIOUS REVIEW COMMENTS FOR CONTINUITY:
  
 1.OK
  
 2. MACHINERY ROOM EXHAUST TERMINATES 11'6" FROM
 PROPERTY LINE AND IS ADJASCENT TO AN OPENING INTO THE
 PARKING GARAGE. THE REQUIREMENTS OF FBC,M 1105.6.1 HAVE
 NOT BEEN MET.
  
 3. OK
  
 4. WHAT PROVISIONS AHVE BEEN MADE FOR REQUIRED MINIMUM
 VENTILATION UNDER NON-EMERGENCY CONDITIONS PER FBC,M
 1105.6 AND IN QUANTITIES DETERMINED BY FBC,M 1105.6.3?
 NOTES INDICATE FAN IS ONLY ENERGIZED AND MAKE-UP AIR
 DAMPERS ARE ONLY OPEN UNDER EMERGENCY CONDITIONS.
  
 5. OK
  
 NEW COMMENTS:
  
 A. M2.3.1 AND M2.3.2: BALCONY (ROOM 316) COULD NOT BE
 FOUND ON ARCHITECTURAL FLOOR PLANS. ALSO, SEVERAL FIRE
 DAMPERS ARE SHOWN IN WALLS WHICH ARE NOT SHOWN TO BE
 RATED ON ARCHITECTURAL PLANS OR LIFE SAFETY PLANS.
 PLEASE COORDINATE DRAWINGS SHOWING LOCATION OF RATED
 BARRIERS/PARTITIONS (IF NEEDED) WHICH CORRESPONDS WITH
 DUCT PENETRATION OPEN ING PROTECTIVES (IF NEEDED).
  
 B. M2.1.1: A TWO-HOUR RATED WALL IS SHOWN BETWEEN ROOM
 100 AND 101/101A ON PAGE LS2.1.0. THERE ARE THREE
 MECHANICAL PENETRATIONS IN THIS WALL FROM AHU 1-2
 REQUIRING OPENING PROTECTIVES PER FBC,M 607.5. ALSO,
 PLEASE SHOW SIZE AND TYPE OF DIFFUSERS (IF ANY) TO BE
 USED AT THESE WALL TERMINATIONS.
  
 C. AHU 1-1: WHAT IS THE SIZE OF RETURN OPENING IN
 MACHINERY ROOM 103? ALSO, AIR FROM AHU 1-1 SHALL NOT BE
 RECIRCULATED PER FBC,M 403.2.1 AND FBC,M 1105.6.2.
  
 D. M2.1.2: AHU 1-3 CALLS FOR 6000 CFM ON SCHEDULE BUT
 SHOWS 6275 ON FLOOR PLAN. WHICH IS CORRECT?
  
 E. M2.1.2 ROOM 113: GRILL DESIGNATION SAYS "TYPICAL OF
 7" BUT PLAN SHOWS 8 GRILLS IN ROOM. PLEASE CLARIFY.
  
 F. M2.2.1 BOYS/GIRLS LOCKER ROOMS: BOTH AREAS SHOW
 RETURN AIR FROM LOCKER ROOMS. RECIRCULATION OF AIR FROM
 LOCKER ROOMS/RESTROOMS IS PROHIBITED PER FBC,M TABLE
 403.3 NOTE (B).
  
 G. M2.2.1: PLAN SHOWS A FIRE DAMPER ON TWO 1 1/4" WATER
 LINES AT VESTIBULE 201. PLEASE CLARIFY.
  
 H. AHU 2-4: PLAN SHOWS 800 CFM SUPPLY WITH 500 CFM R/A
 AND 80 CFM O.A.HOW IS THIS SYSTEM TO BE BALANCED?
  
 I. M2.2.2: R/A FROM ROOMS 229/230 DO NOT MEET THE
 EXCEPTIONS FOR BALANCED RETURN UNDER FBC,M 601.4.
 UNLESS THE TRANSFER DUCT IS DESIGNED TO 1 1/2 TIMES THE
 SQUARE INCHES OF SUPPLY, A FIELD TEST IS REQUIRED TO
 SHOW THE PRESSURE DIFFERENTIAL TO BE 0.01" WC OR LESS
 PER FBC,M 601.4. THIS APPLIES TO ANY AREAS UTILIZING
 TRANSFER DUCTS/GRILLS FOR BALANCED RETURN.
  
 J. M2.2.2 AHU 2-9: PLEASE SHOW SIZES OF BRANCH DUCTS AT
 TEE ON SUPPLY DUCT SYSTEM. FBC 106.1.1
  
 K. AHU SYSTEMS: MOST SYSTEMS APPEAR TO BE DESIGNED WITH
 EQUAL AMOUNTS OF SUPPLY AND RETURN AIR. EXAMPLE: AHU
 2-6 SHOWS 1600 CFM SUPPLY, 1600 CFM RETURN AMD 330 CFM
 O.A. HOW WILL O/A BE INTRODUCED OF 100% OF SUPPLY IS
 BEING RETURNED? PLEASE CHECK ALL A/C SYSTEMS FOR PROPER
 BALANCE IN ACCORDANCE WITH FBC,M 403.1.
  
 L. ALL EXIT ENCLOSURES: EQUIPMENT AND DUCTWORK FOR EXIT
 ENCLOSURE VENTILATION SHALL COMPLY WITH THE
 REQUIREMENTS FBC,M 401.4. SOME ASPECTS OF THE A/C
 SYSTEMS MAY NEED TO BE MODIFIED TO MEET THIS
 REQUIREMENT. A REVIEW OF CHANGES WITH POSSIBLE NEW
 COMMENTS WILL BE DONE AT TIME OF RESUBMITTAL.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
  
 RONALD J REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved