Date |
Text |
2006-11-18 10:22:18 | WE DID NOT RECEIVED CIVIL PLANS FOR REVIEW. SO MAKE |
| SURE YOU HAVE INCLUDED THE FOLLOWING INFO IN YOUR |
| SUBMITTAL TO EXPEDITE THE PERMITTING PROCESS. |
| 1. PLEASE PROVIDE DRAINAGE/STORM WATERPLANS. LIKE |
| SHEET C-1, C-2, ETC, JUST A SUGESTION |
| 2. PLEASE SHOW ALL STANDARDS NOTES OF CITY OF WPB ON |
| DRAWINGSFOR SIDEWALK WIDTH , ITS SLOPE, DRIVEWAY, |
| PARKING, HANDICAP PARKING, PAINTPER CITY CODES ETC.,, |
| MUST MEET PER ADA,,ETC., |
| 3. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| 4. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| SIDEWALK ELEVATION MUST MEET FL BLDG CODE,PLEASE SHOW |
| ON THE DRAWINGS THAT YOU MEET FL BLDG CODES. |
| 5. PLEASE PROVIDE A COPY OF SFWMD PERMIT, & GEOTECH |
| REPORT |
| 6.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| OR2.5"CRITERIA, ?PERVIOUS AREA, LIKE GREEN, |
| LAKES, ETC,IMPERVIOUS AREA CAL., |
| 7. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| PROJECT ONLY ? SO, WE CAN CHECK PERVIOUS, IMPERVIOUS |
| CAL. |
| 8. HOW DIDYOU CONNECT TO THE STORM WATER PIPES IN |
| YOUR SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER |
| PIPES AROUND YOUR SITE SO, WE CANSEE THE BEST STORM |
| WATER PIPE TO CONNECT WITH THE STORM WATERFROM ALL |
| OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| CONTROL STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| 9. POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| ETC., PLANS SHOWING SILT FENCE AROUND THE SITE |
| 10. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVE |
| 11. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| YOUR SITE FOR STORM WATER DRAIN. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI805-6723 |