2006-11-28 12:03:35BUILDING PLAN REVIEW
 PERMIT: 06110087
 ADD: 3199 CUMBERLAND DR
 CONT: DCS ELECTRIC
 TEL: (561)7224690
 FL BLD CODE= 2004 FLORIDA BUILDING CODE
 * WEST PALM BEACH AMENDMENTS
  
 1STREVIEW
 ACTION: DENIED
  
 1)--- VERY IMPORTANT STATEMENT ---
 PLEASE DO NOT IGNORE!
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
  
 2 ) FL S S 713.13
 NOTICE OF COMMENCEMENT, TO BE FILED
 WITH THE CLERK OF THE COURT BEFORE A
 PERMIT WILL BE ISSUED. NOTE: 713.13(2)
 IF THE WORK DESCRIBED IN THE NOTICE OF
 COMMENCEMENT IS NOT ACTUALLY COMMENCED
 WITHIN 90 DAYS AFTER THE RECORDING
 THEREOF, SUCH NOTICE IS NULL & VOID.
  
 3) DCS ELECTRIC HAAS A EC STATE LICENSE, WHEN THE
 MAJORITY OF THE WORK IS NOT ELECTRIC, THE "PRIME PERMIT
 " HAS TO BE SIGNED BY EITHER A POLLUTANT STORAGE
 SYSTEMS CONTRACTOR OR IF GASOLINE A MECHANICAL
 CONTRACTOR.
 489.105
 I)"MECHANICAL CONTRACTOR" MEANS A CONTRACTOR WHOSE
 SERVICES ARE UNLIMITED IN THE EXECUTION OF CONTRACTS
 REQUIRING THE EXPERIENCE, KNOWLEDGE, AND SKILL TO
 INSTALL, MAINTAIN, REPAIR, FABRICATE, ALTER, EXTEND, OR
 DESIGN, WHEN NOT PROHIBITED BY LAW, CENTRAL
 AIR-CONDITIONING, REFRIGERATION, HEATING, AND
 VENTILATING SYSTEMS, INCLUDING DUCT WORK IN CONNECTION
 WITH A COMPLETE SYSTEM ONLY TO THE EXTENT SUCH DUCT
 WORK IS PERFORMED BY THE CONTRACTOR AS IS NECESSARY TO
 MAKE COMPLETE AN AIR-DISTRIBUTION SYSTEM, BOILER AND
 UNFIRED PRESSURE VESSEL SYSTEMS, LIFT STATION EQUIPMENT
 AND PIPING, AND ALL APPURTENANCES, APPARATUS, OR
 EQUIPMENT USED IN CONNECTION THEREWITH, AND ANY DUCT
 CLEANING AND EQUIPMENT SANITIZING WHICH REQUIRES AT
 LEAST A PARTIAL DISASSEMBLING OF THE SYSTEM; TO
 INSTALL, MAINTAIN, REPAIR, FABRICATE, ALTER, EXTEND, OR
 DESIGN, WHEN NOT PROHIBITED BY LAW, PIPING, INSULATION
 OF PIPES, VESSELS AND DUCTS, PRESSURE AND PROCESS
 PIPING, PNEUMATIC CONTROL PIPING, GASOLINE TANKS AND
 PUMP INSTALLATIONS AND PIPING FOR SAME, STANDPIPES, AIR
 PIPING, VACUUM LINE PIPING, OXYGEN LINES, NITROUS OXIDE
 PIPING, INK AND CHEMICAL LINES, FUEL TRANSMISSION
 LINES, LIQUEFIED PETROLEUM GAS LINES WITHIN BUILDINGS,
 AND NATURAL GAS FUEL LINES WITHIN BUILDINGS; TO
 REPLACE, DISCONNECT, OR RECONNECT POWER WIRING ON THE
 LOAD SIDE OF THE DEDICATED EXISTING ELECTRICAL
 DISCONNECT SWITCH; TO INSTALL, DISCONNECT, AND
 RECONNECT LOW VOLTAGE HEATING, VENTILATING, AND
 AIR-CONDITIONING CONTROL WIRING; AND TO INSTALL A
 CONDENSATE DRAIN FROM AN AIR-CONDITIONING UNIT TO AN
 EXISTING SAFE WASTE OR OTHER APPROVED DISPOSAL OTHER
 THAN A DIRECT CONNECTION TO A SANITARY SYSTEM. THE
 SCOPE OF WORK FOR SUCH CONTRACTOR SHALL ALSO INCLUDE
 ANY EXCAVATION WORK INCIDENTAL THERETO, BUT SHALL NOT
 INCLUDE ANY WORK SUCH AS POTABLE WATER LINES OR
 CONNECTIONS THERETO, SANITARY SEWER LINES, SWIMMING
 POOL PIPING AND FILTERS, OR ELECTRICAL POWER WIRING.
  
 P)"POLLUTANT STORAGE SYSTEMS CONTRACTOR" MEANS A
 CONTRACTOR WHOSE SERVICES ARE LIMITED TO, AND WHO HAS
 THE EXPERIENCE, KNOWLEDGE, AND SKILL TO INSTALL,
 MAINTAIN, REPAIR, ALTER, EXTEND, OR DESIGN, WHEN NOT
 PROHIBITED BY LAW, AND USE MATERIALS AND ITEMS USED IN
 THE INSTALLATION, MAINTENANCE, EXTENSION, AND
 ALTERATION OF, POLLUTANT STORAGE TANKS. ANY PERSON
 INSTALLING A POLLUTANT STORAGE TANK SHALL PERFORM SUCH
 INSTALLATION IN ACCORDANCE WITH THE STANDARDS ADOPTED
 PURSUANT TO S. 376.303.
  
 4) PLEASE PROVIDE THE LOCATION OF THIS UNIT WITH THE
 LOCATION OF THE STRUCTURE, LOCATE ALL WINDOWS, DOORS ,
 AND SOFFIT VENTS, PROVIDE THE DISTANCE AWAY FROM THE
 FUEL TANK TO THE STRUCTURE.ALSO INDICATE WHAT THIS IS A
 FUEL TANK TOO?
  
 5) PROVIDE HOW THE FUEL TANK WILL BE BOLTED DOWN TO
 RESIST THE MOMENT OF OVERTURNING.
 1609.1.3 ANCHORAGE AGAINST OVERTURNING , UPLIFT AND
 SLIDING.
 STRUCTURAL MEMBERS AND SYSTEMS AND COMPONENTS AND
 CLADDING IN A BUILDING OR STRUCTURE SHALL BE ANCHORED
 TO RESIST WIND-INDUCED OVERTURNING , UPLIFT AND SLIDING
 AND TO PROVIDE CONTINUOUS LOAD PATHS FOR THESE FORCES
 TO THE FOUNDATION. WHERE A PORTION OF THE RESISTANCE TO
 THESE FORCES IS PROVIDED BY DEAD LOAD, THE DEAD LOAD,
 INCLUDING THE WEIGHT OF SOILS AND FOUNDATIONS, SHALL BE
 TAKEN AS THE MINIMUM DEAD LOAD LIKELY TO BE IN PLACE
 DURING A DESIGN WIND EVENT. WHERE THE ALTERNATE BASIC
 LOAD COMBINATIONS OF SECTION 1605.3.2 ARE USED, ONLY
 TWO-THIRDS OF THE MINIMUM DEAD LOAD LIKELY TO BE IN
 PLACE DURING A DESIGN WIND EVENT SHALL BE USED.
  
 6)NOTE, PROVISO: THE TANK IS ALSO LOCATED IN A A-8
 FLOOD ZONE,
 THE FINISHED FLOOR LEVEL SHALL BE
 VERIFIED BY A SIGNED AND SEALED
 ELEVATION CERTIFICATE.
  
 BUILDING PLAN REVIEW
 JIM WITMER
 TEL: (561)805-6715
 FAX: (561)659-8026
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved