Date |
Text |
2006-11-28 09:09:37 | UNSAT |
| REFERENCE: FBC-2004 FUEL GAS |
| |
| THE FOLLOWING CORRECTIONS ARE REQUIRED FOR GAS PLAN |
| REVIEW TO MEET CODE COMPLIANCE: |
| |
| 1. A GAS PERMIT CAN NOT BE ISSUED UNTIL |
| A GEN/RES PERMIT APPLICATION HAS BEEN |
| APPROVED BY ZONING FOR |
| THE GENERATOR LOCATION. |
| NOTE: PLEASE BE AWARE THAT IF GENERATOR LOCATION |
| CHANGES BECAUSE OF ZONING ISSUES THE GAS DRAWING MUST |
| CORRELATE WITH THESE CHANGES. |
| |
| 2. PLEASE PROVIDE MANUFACTURER INSTALLATION |
| INSTRUCTIONS OF GENERATOR REGAURDING CLEARENCES TO |
| STRUCTURES. |
| |
| 3. PLEASE PROVIDE A CURRENT SURVEY (2 COPIES) WITH |
| DIMENSIONS OF PROPOSED GENERATOR TO STRUCTURES AND |
| PROPERTY LINES. |
| |
| 4. PLEASE INDICATE THE TYPE OF GAS, (LP OR NATURAL) ON |
| THE GAS ISOMETRIC DRAWINGS. |
| |
| 5. PLEASE BE AWARE THAT IF THE GAS SYSTEM IS NATURAL |
| GAS FOR THE PROPOSED GENERATOR THAT THE BTU LOAD |
| INDICATED ON THE GAS ISOMETRIC DRAWING IS WRONG, IT |
| SHOULD BE 723,000 NOT 698,000 PER THE SUBMITTED |
| MANUFACTURER SPECIFICATIONS. PLEASE CORRECT FOR THE |
| RESUBMITTAL. |
| |
| 6. NOTE: PLEASE BE AWARE THAT A GAS PERMIT IS REQUIRED |
| FOR THE PROPOSED GENERATOR AND THAT THERE WAS NOT A GAS |
| CONTRACTOR SIGNED ON THE GEN/RES PERMIT APPLICATION |
| EVEN THOUGH THERE WAS A GAS ISOMETRIC DRAWING |
| SUBMITTED. PLEASE CLARIFY THIS ON THE RESUBMITTAL. |
| |
| |
| END OF COMMENTS: |
| |
| REVIEW BY MIKE PERSON |
| (561) 805-6730 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |
| UNDER SUPERVISION OF K.STEVENS |
| (561) 805-6721 |
| |
| |
| |
| |
| |