2007-01-21 12:50:23 | ** UNSAT 3RD REVIEW ** |
| |
| |
| ** PLEASE SEE SOME COMMENTS FROM THE PREVIOUS REVIEW |
| ARE STILL IN NEED OF ADDRESSING ALONG WITH NEW COMMENTS |
| BASED ON A COMPLETELY NEW ELECTRICAL RISER DIAGRAM |
| BEING SUBMITTED. |
| |
| |
| 1) NOTE: PLEASE SEE THE PLANS NOW HAVE THE SITE |
| LIGHTING FIXTURES AND CIRCUITS REMOVED WHEN BOTH THE |
| PREVIOUS REVIEWS INDICATED THESE. PLEASE SEE ENERGY |
| CALCULATIONS ARE STILL INDICATING THESE TO BE |
| INSTALLED. |
| PLEASE SEE THAT PLANS MUST SHOW THESE, POLE DETAIL, |
| CIRCUITS, AND APPROPRIATE WIND LOADS. |
| PLEASE KNOW ANY SHOP PLANS FOR THE POLES MAY BE |
| SUBMITTED AT A LATER DATE AS A *PROVISO*; HOWEVER THE |
| BASE INFORMATION ABOVE MUST BE SHOWN. (IF THESE ARE |
| GOING TO BE DONE)?? |
| FBC 106.1.2, 106.3.5.1.2 |
| 408.4, 310.16, 240.4 ETC. |
| THIS WAS A COMMENT ON PREVIOUS REVIEW. |
| |
| 2) NOTE: PLEASE SEE PREVIOUS NOTE MENTIONED THAT THE |
| ENERGY CALCULATIONS DID NOT CORRELATE WITH THE |
| ELECTRICAL FIXTURES AND LIGHTING AS SHOWN ON PLANS. |
| THIS IS STILL THE CASE. PLEASE SEE THE AMOUNT AND TYPE |
| OF FIXTURES AS SHOWN ON PLANS FAR EXCEED THAT OF ENERGY |
| CALCULATIONS. |
| PLEASE SEE 13-415.1.AB.1.1. |
| PLEASE SEE CHAPTER 13, ALL, AS COMPLIANCE MUST BE MET |
| FOR ALL AREAS. 106.1.2, 106.3.5.1.2 |
| THIS WAS THE SAME COMMENT ON PREVIOUS REVIEW. |
| ** PLEASE KNOW AS THE COMMENT IS BEING REPEATED AND |
| COMPLIANCE IS NOT BEING MET, PLEASE SUBMIT A COMPLETE |
| FIXTURE LEGEND AND CORRELATE WITH ALL FIXTURE |
| DESIGNATIONS ON PLANS. |
| 106.1.2, 106.3.5.1.2 |
| |
| 3) NOTE: PLEASE SEE 220.12, 220 AS STATED ON THE |
| PREVIOUS REVIEW FOR TRACK LIGHTING LOADS AND HOW AND |
| WHERE THESE ARE BEING FIGURED INTO CALCULATIONS. |
| |
| 4) NOTE: PLEASE SEE RISER HAS BEEN COMPLETELY REVISED. |
| PLEASE INCLUDE MISSING CONDUCTOR FROM METER TO GUTTER |
| AND FROM GUTTER TO EACH OF THE NEW MAIN DISCONNECTS AS |
| NOW SHOWN. |
| 240.4, 310.16, ETC. |
| FBC 106.1.2 AND 106.3.5.1.2 ADMIN SECTIONS. |
| |
| 5) NOTE: PLEASE SEE MISSING EQUIPMENT GROUNDING |
| CONDUCTORS FROM NEW MAINS TO PANELS. PLEASE KNOW EVEN |
| AS THE USE OF EMT IS BEING SHOWN, UNLESS THE NEW LISTED |
| CONNECTORS RATED FOR *EQUIPMENT GROUNDING * IS BEING |
| USED AND EQUIPMENT GROUNDING CONDUCTOR SIZED PER |
| 250.122 SHALL BE INSTALLED. |
| *THIS WOULD HAVE BEEN REDLINED IF THIS WERE THE ONLY |
| COMMENT. |
| |
| 6) NOTE: PLEASE SEE AS THE RISER IS NOW SHOWING A NEW |
| PANEL *B*, THE PLANS DO NOT INCLUDE THIS? PLEASE SHOW |
| THE LOCATION OF THE NEW PANEL WHICH IS NOW ADDED. |
| |
| ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| |
| |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |