Plan Review Notes For Permit 06100891 |
Permit Number |
06100891 |
|
Review Stop |
M |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2007-03-01 14:47:53 | -----------------2ND REVIEW-------------- | | | | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH | | PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER | | RESPONSES: | | | | COMMENT #1: THE REQUIREMENTS OF FBC,M 307.2.1 AND | | 307.2.2 HAVE BEEN SATISFIED. HOWEVER, THE ISSUE OF | | AUXILIARY AND SECONDARY DRAIN SYSTEMS (FBC,M 307.2.3) | | HAS NOT BEEN ADEQUATELY ADDRESSED. THERE ARE NO | | PROVISIONS FOR THE RTU'S, WHICH HAVE THE POTENTIAL TO | | OVERFLOW INTO THE BUILDING SHOULD THE PRIMARY DRAIN | | CEASE TO FUNCTION. THERE IS ALSO NO INDICATION THAT THE | | FLOOR IN STORAGE ROOMS 117 AND 129 ARE DESIGNED IN SUCH | | A WAY AS TO ENSURE THAT CONDENSATE OVERFLOW WILL BE | | DIRECTED ONLY IN THE DIRECTION OF THE FLOOR DRAIN, THUS | | PREVENTING CONDENSATE OVERFLOW FROM DAMAGING ANY | | BUILDING COMPONENTS. THE INSTALLATION OF A WATER LEVEL | | DETECTION DEVICE IN THE PRIMARY PAN OF THE AHUS AND THE | | RTUS WOULD BE IN COMPLIANCE WITH FBC,M 307.2.3(2). | | | | COMMENT #2: PLEASE INDICATE ON PLANS THAT THE RTU AND | | ACCU ROOF ATTACHMENTS HAVE BEEN DESIGNED TO MEET THE | | 140MPH WIND LOAD REQUIREMENTS OF FBC CHAPTER 16. | | | | COMMENT #3: OK | | | | COMMENT #4: ADDRESSED IN COMMENT #2. | | | | COMMENT #5: OK |
|