2006-11-08 15:51:59BUILDING REVIEW CHECKLIST:
  
 1- NEED RECORDED NOTICE OF COMMENCEMENT AS REQUIRED BY
 SEC. 713.13 FLORIDA STATUTES.
  
 2- PROVIDE COMPLETE ENGINEERING PLANS SHOWING ALL
 PROPOSED WORK. FOLLOW FBC 2004 AND FLORIDA RESIDENTIAL
 CODE 2004 RESPECTIVELY. LETTER FROM FLAHERTY ASSOCIATES
 INC., ENGINEERING FIRM, ONLY STATES THAT THEY WERE
 RETAINED TO DO THE DRAWINGS.PLAN REVIEW CAN'T BE
 PERFORMED IF DRAWINGS ARE NOT SUBMITTED FOR REVIEW.
  
 3- PROVIDE KEY PLAN SHOWING SIZE OF WINDOWS TO VERIFY
 BEDROOM'S EGRESS REQUIREMENTS. SEC. R310.1 2004 FLORIDA
 RESIDENTIAL CODE AND SEC. 505.1 OF 2004 EXISTING
 BUILDING.
  
 4- STORM SHUTTERS:PROVIDE KEY PLAN AND COMPLETE
 INSTALLATION SCHEDULE. SEC. 106.1.2 CITY AMENDMENTS TO
 FBC 2004. SEE ATTACHED INSTALLATION SCHEDULE CITY
 SAMPLE AND PROVIDE ALL REQUIRED INFORMATION.
  
 5- PROVIDE 2 COPIES OF PRODUCT APPROVAL AS REQUIRED BY
 RULE 9B-72 FOR:
 A) STORM SHUTTERS. ONLY ONE COPY SUBMITTED.
 B) SINGLE HUNG WINDOWS. ONLY ONE COPY SUBMITTED.
 ***NOTE: DRAWING FROM AMERICAN CRAFTSMAN WINDOWS IS NOT
 A PRODUCT APPROVAL. NEED TO PROVIDE COMPLETE PRODUCT
 APPROVAL IF USING THIS TYPE OF WINDOW.
 C) DOORS. NONE SUBMITTED.
 D) ALL SIMPSON OR USP STRUCTURAL CONNECTORS
 SPECIFIED ON THE ENGINEER'SPLANS.
  
 6- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING
 ALL PRODUCT APPROVALS AS REQUIRED BY SEC. 106.3.3 CITY
 AMENDMENTS TO FBC 2004.
 ***NOTE; REQUIREMENT IS TO REVIEW AND APPROVE IN
 WRITING NOT SIGN AND SEAL THEM.
  
 7- THERE WAS SOME CONSTRUCTION GOING ON WITHOUT PERMIT.
 CONTRACTOR WAS RED TAGGED ON 10/30/06 BY INSPECTOR FOR
 4X PERMIT FEES.SEE ATTACHED COPY. OWES $1733.46. THIS
 INCLUDES 4X PERMIT FEES PLUS UPDATED VALUATION.
 CONTRACTOR LETTER STATES WORK TO BE PERFORMED FOR
 $27,300 NOT 23,000.
 ***NOTE:APPLY FOR PLUMBING , ELECTRICAL, MECHANICAL
 AND ROOFING PERMITS IF SUCH WORK IS GOING TO BE
 PERFORMED.
  
 8- ACCORDING TO CONTRACTOR'S SCOPE OF WORK LETTER THERE
 WILL BE 2 COATS OF STUCCO APPLIED.NEED TO PROVIDE 3
 COATS AS REQUIRED BY SEC. 7.1.6 AND TABLE 1 OF ASTM
 C-926.SEE TABLE 1 ON ASTM C-926 FOR TOTAL THICKNESS
 REQUIRED.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712