2007-11-06 15:30:42 | REVIEW #: 8TH |
| ACTION: PASSED/DENIED |
| |
| FBC 2004 CODE FAMILY W/ 2005 SUPPLEMENTS |
| FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| |
| THE FOLLOWING PAGES WERE REVIEWED FOR COMPLIANCE, |
| STAMPED AND INCORPORATED INTO THE PERMIT SET OF PLANS |
| AS REV 12A: |
| |
| M1-1.0, M1-2.0, M1-2.2, M1-3.0, M1-3.1, M1-4.0, M1-4.1, |
| M1-4.2, M1-5.0, M1-5.1, M1-5.2, M1-6.0, M2-3.0, M3-1.0 |
| |
| THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN |
| RESPONSES FOR THE PURPOSE OF CONTINUITY. |
| |
| REV. 11 COMMENTS: |
| |
| 1. REVISION 12A WILL BE REVIEWED FOR CODE COMPLIANCE AS |
| WELL AS RESPONSES TO PREVIOUS REVIEW COMMENTS FROM |
| REVISIONS 10 AND 11. |
| |
| 2. M1-1.1: AT THE FIRE COMMAND CENTER, A 6X6 TRANSFER |
| DUCT HAS BEEN RELOCATED. IF THIS ROOM IS STILL ENCLOSED |
| BY FIRE-RESISTANCE RATED CONSTRUCTION, THIS OPENING IS |
| REQUIRED TO BE PROTECTED BY A FIRE DAMPER IN ACCORDANCE |
| WITH FBC,M 607.5. ALSO, THE 50X26 SUPPLY DUCT FROM |
| CAHU-1 SHOWS A TEE FITTING OVER ALCOVE A1.104. AT THIS |
| LOCATION THERE ARE TWO DUCTS PENETRATING THE RATED WALL |
| BUT ONLY ONE DUCT SHOWS OPENING PROTECTIVE FSD |
| |
| 3. OK |
| |
| 4. OK |
| |
| 5. OK |
| |
| 5A. M1-1.2: EF-3 DUCT PENETRATING FLOOR/CEILING |
| ASSEMBLY ABOVE ROOM D1.107, IS THIS DUCT ENTERING A |
| SHAFT? IF SO, PROVIDE FIRE AND SMOKE DAMPER AS REQUIRED |
| BY FBC,M 607.5.5.1. |
| |
| 6. OK, EXCEPT: KEY NOTE #6 INDICATES ONLY THE TWO |
| FIRE/SMOKE DAMPERS ON THE SMOKE EXHAUST DUCT AT THE |
| ?ATRIUM? ARE TO BE CONTROLLED BY THE SMOKE CONTROL |
| SYSTEM. HAS THERE BEEN A RATIONAL ANALYSIS DONE TO |
| DETERMINE WHICH DAMPERS SHOULD BE OPENED AND CLOSED |
| DURING SMOKE CONTROL MODE? OPENINGS IN SMOKE BARRIERS |
| SHALL BE PROTECTED BY AUTOMATIC-CLOSING DEVICES |
| ACTUATED BY THE REQUIRED CONTROLS FOR THE MECHANICAL |
| SMOKE CONTROL SYSTEM IN ACCORDANCE WITH FBC,M 513.5.2. |
| THIS MAY ALSO APPLY TO THE FIRE/SMOKE DAMPERS IN THE |
| SMOKE EXHAUST DUCT PENETRATIONS OF THE SHAFT |
| ENCLOSURES. |
| |
| 7. OK |
| |
| 8. OK |
| |
| 9. OK |
| |
| 10. OK |
| |
| 11. M1-2.3 WILL BE REVIEWED IN RESPONSE TOPART OF REV |
| 10 COMMENTS. |
| |
| 12. OK |
| |
| 13. M1-3.2: HOW WILL THE FIRE/SMOKE DAMPERS BE ACCESSED |
| FOR SERVICE, MAINTENANCE AND TESTING ABOVE THIS STAIR |
| CAP? EVEN WITH 4?9? BETWEEN THE CAP AND THE DECK ABOVE, |
| AT LEAST 2 OF THE DAMPERS MAY BE RENDERED INACCESSIBLE |
| BY THE ROUTING OF THE DUCTS. ALSO, IF THE STAIR CAP IS |
| TO BE USED AS A SERVICE PLATFORM, IT SHALL BE REQUIRED |
| TO MEET THE REQUIREMENTS FOR A SERVICE PLATFORM IN |
| ACCORDANCE WITH THE FBC. |
| |
| 14. M1-3.2: THERE IS ONE DUCT SHOWN PENETRATING |
| PROGRAM/MEETING ROOM C3.306 TO FEED TWO VAV BOXES. |
| WHILE THE SIZE OF THE DUCTS FEEDING THE VAV?S IS |
| DETEMINED BY THE INLET SIZE ON THE VAV, A SIZE NEEDS TO |
| BE PROVIDED FOR THE DUCT PENETRATING THE WALL BEFORE IT |
| BRANCHES TO FEED THE TWO VAV?S. PLEASE CLARIFY. FBC,M |
| 603.1 |
| |
| 15. OK |
| |
| 16. OK |
| |
| 17. OK |
| |
| 18. OK |
| |
| REV. 10 COMMENTS: |
| |
| 1. OK |
| |
| 2. OK |
| |
| 3. M1-1.3 THROUGH M1-5.3: ACCORDING TO MANUFACTURER?S |
| INSTALLATION INSTRUCTIONS, THE CO SENSORS ARE GOOD FOR |
| APPROXIMATELY 5000 SQ FT OR A 40 FT RADIUS. BASED ON |
| THE LAYOUT SHOWN ON PLANS, THERE ARE AREAS NOT |
| ADEQUATELY COVERED BY THE SENSORS. SHOW DETECTORS |
| LOCATED TO PROVIDE FULL COVERAGE OF THE PARKING GARAGE. |
| FBC,M 304.1 |
| |
| 4. OK |
| |
| 5. OK PENDING VERIFICATION OF INTAKE LOCATION. |
| |
| 6. OK |
| |
| 7. OK |
| |
| 8. OK |
| |
| 9. OK |
| |
| 10. OK |
| |
| NEW COMMENTS RELATED TO REV. 12A: |
| |
| 1. M4-4.0: SEQUENCE OF OPERATION NOTE #1, ACTIVATION OF |
| THE SMOKE CONTROL SYSTEM SHALL BE IN COMPLIANCE WITH |
| FBC 909.12.3. |
| |
| 2. M4-4.0: SEQUENCE OF OPERATION NOTE #2, THIS NOTE IS |
| IN CONFLICT WITH THE NOTE ON FLOOR PLANS WHICH |
| INDICATES SMOKE DAMPERS ARE TO BE CONTROLLED BY DUCT |
| SMOKE DETECTORS. ALSO, ALL SMOKE DAMPERS WHICH ARE |
| RELATED TO THE SMOKE CONTROL SYSTEM AND REQUIRED BY THE |
| SMOKE CONTROL SYSTEM FOR THE ATRIUM AREA SHALL BE |
| CONTROLLED BY THE SMOKE CONTROL SYSTEM. FBC,M 513.5.2 |
| |
| 3. M4-4.0: SEQUENCE OF OPERATION NOTES 2 THROUGH 7: A |
| RATIONAL ANALYSIS FOR THE DESIGN OF THE SMOKE CONTROL |
| SYSTEM SHALL BE PROVIDED TO DETERMINE THE ACTUAL |
| REQUIRED SEQUENCE OF OPERATIONS, INCLUDING SMOKE DAMPER |
| ACTUATION, RELATED TO THE PROPER OPERATION OF THE SMOKE |
| CONTROL SYSTEM IN ACCORDANCE WITH FBC,M 513.4. |
| |