2007-08-01 15:03:54REVISION 10 - 1 PAGE PASSED.
  
 PG M3-1.0 REVIEWED AND STAMPED. ALL OTHER SUBMITTED
 MECHANICAL PAGES:
 ---------------DENIED-----------------
  
 FBC 2004 CODE FAMILY W/ 2005 REVISIONS
 FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH
  
 1. WHAT IS THE HEIGHT OF FCU 1-6? SHOW COMPLIANCE WITH
 FBC,M 304.5.
  
 2. M1-1.3 THROUGH M1-5.3: GARAGE EXHAUST FANS ARE TO
 RUN INTERMITTANTLY, CONTROLLED BY C.O SENSORS. HOWEVER,
 AUTOMATIC OPERATION OF THE SYSTEM SHALL NOT REDUCE THE
 VENTILATION RATE BELOW0.05 CFM PER SQUARE FOOT OF THE
 FLOOR AREA AND THE SYSTEM SHALL BE CAPABLE OF PRODUCING
 A VENTILATION RATE OF 1.5 CFM PER SQUARE FOOT OF FLOOR
 AREA. FBC,M 404.2. THE 0.05 CFM/SQ.FT IS TO BE
 CONTINUOUS.
  
 3. M1-1.3 THROUGH M1-5.3: IN PREVIOUS REVIEW COMMENT #3
 (DATED 4/5/07), THE SPECS AND INSTALL INSTRUCTIONS FOR
 THE C.O. DETECTION SYSTEM WERE REQUESTED. THAT
 INFORMATION WAS NOT PROVIDED WITH THE SUBMITTED PLANS.
 A COMPLETE REVIEW OF THE GARAGE VENTILATION SYSTEM CAN
 NOT BE DONE AT THIS TIME.
  
 4. M1-1.3: PLEASE IDENTIFY THE LARGE PIPES RUNNING FROM
 THE MECHANICAL ROOM TO THE FIRE PUMP ROOM. PIPES ON
 RISER ARE SHOWN GOING UP BUT THEY DO NOT APPEAR ON
 UPPER FLOORS. PLEASE CORRECT. FBC 106.1.1
  
 5. M1-1.3: PLEASE SHOW HOW VENTILATION (OUTDOOR AIR) IS
 TO BE PROVIDED IN OFFICE B1-104 AND TICKET BOOTH
 B1-109.
 NOTE: TICKET BOOTHS AND SIMILAR USES THAT ARE ACCESSORY
 TO A PUBLIC GARAGE SHALL BE MAINTAINED AT A POSITIVE
 PRESSURE AND SHALL BE PROVIDED WITH VENTILATION IN
 ACCORDANCE WITH SECTION 403.3 PER FBC,M 404.3.
  
 6. M1-1.3: WHAT IS THE SOURCE OF MAKE-UP AIR FOR THE
 960 CFM OF EXHAUST IN FIRE PUMP ROOM B1-106 AND THE 875
 CFM OF EXHAUST IN FUEL TANK STORAGE B1-107? SEE FBC,M
 403.1.
  
 7. M1-1.3: ACCORDING TO PG LS1-1.0, FUEL TANK ROOM
 B1-107 IS 3-HOUR RATED. PLEASE SPECIFY A 3-HOUR
 FIRE/SMOKE DAMPER BETWEEN FUEL TANK ROOM AND FIRE PUMP
 ROOM. ALSO, A 3-HOUR FIRE DAMPER IS REQUIRED AT THE
 22X14 EXHAUST DUCT PENETRATION OF THE FLOOR/CEILING
 ASSEMBLY ABOVE THE FUEL TANK ROOM TO MAINTAIN THE
 3-HOUR RATING OF THE ROOM. FBC,M TABLE 607.3.1
  
 8. M1-2.3: PLEASE SHOW CU 1-3, 1-6, 1-7 AND ANY OTHER
 POTENTIALLY EXPOSED MECHANICAL EQUIPMENT TO BE
 PROTECTED FROM VEHICLE DAMAGE PER FBC,M 304.5.
  
 9. M1-2.3 THROUGH M1-5.3: THE 22X14 EXHAUST DUCT RISER
 SHALL BE PROTECTED FROM MECHANICAL DAMAGE BY APPROVED
 BARRIERS. FBC,M 603.13
  
 10. M3-2.0: GARAGE FAN SCHEDULE, WHAT TYPE OF WALL
 TERMINATION WILL BE USED AT EF20-23? THE SCHEDULE DOES
 NOT CALL FOR LOUVERS. SCREENS ALONE WILL NOT PROTECT
 AGAINST WEATHER CONDITIONS. FBC,M 401.6
  
 11. M4-3.0: UNABLE TO REVIEW GARAGE VENTILATION SYSTEM
 AT THIS TIME. SEE CURRENT AND PREVIOUS COMMENT #3.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved