Plan Review Notes
Plan Review Notes For Permit 06100574
Permit Number 06100574
Review Stop P
Sequence Number 3
Notes
Date Text
2007-01-30 17:59:39DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 BUILDING
 FBC-2004 FUEL GAS
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 FROM PREVIOUS REVIEW:
 FROM PREVIOUS REVIEW:
  
 1. OK
 2. OK
  
 3. SHT P1-1.1 PUMP ROOM A1-112. RPZV BACKFLOW SHALL BE
 INSTALLED A MAXIMUM OF 4' ABOVE THE FLOOR FOR
 CERTIFICATION AND SERVICE.
 ****RESPONSE NOTED, HEIGHT TO BE INDICATED FOR THE
 BACKFLOWS TO BE A MAXIMUM OF 4' ABOVE THE FLOOR.
 ****RESPONSE NOTED, BUT PLANS INDICATE MINIMUM 4' ABOVE
 THE FLOOR. THE REQUIREMENT IS FOR MAXIMUM 4' ABOVE THE
 FLOOR.
 ******RESPONSE NOTED, BUT THE MINIMUM IS STILL
 INDICATED.
  
 4. OK
 5. OK
 6.OK
 7.OK
 8.OK
 9.OK
 10. OK
 11. OK
 12. OK
 13. OK
 14. OK
 15. OK
 16. OK (SHOWN ON SHT P2-1.0U)
 17. OK
 18. OK
 19. OK
 20. OK
 21. OK
 22. OK
 23. OK
 24. OK
 25. OK
 26. OK
 27. OK
 28. OK
 29. OK
 30. OK
 31. OK
 32. OK
 33. OK
 34. OK
 35. OK
  
 36. SUBMIT A SANITARY HORIZONTAL RISER ISOMETRIC AND
 VERTICAL RISER DIAGRAMS. SHOW ALL PIPE SIZES, TRAPS,
 VENTS, CLEANOUTS, OFFSETS, RISER NUMBERS AND DFU'S AS
 THEY ACCUMULATE IN THE SYSTEM. SECTION 106.3.5.1.3.
 ****RESPONSE NOTED, BUT ALL PIPE SIZES ARE NOT SHOWN,
 ALL REQUIRED CLEANOUTS ARE NOT SHOWN, AND DFU'S ARE NOT
 SHOWN AS THEY ACCUMULATE IN THE SYSTEM. ALSO INDICATE
 ON THE FIRST FLOOR WHERE ALL RISERS BEGIN IN THE
 SYSTEM.
 ****RESPONSE NOTED, BUT SHT P3-1.0 RISER 1, LAVS DO NOT
 REFLECT THE FLOOR PLAN 2ND FLOOR C2-1.03. - DOES NOT
 REFLECT THE FLOOR PLAN C4.103/C4.104 DRINKING FOUNTAINS
 SHOW 3, FLOOR PLAN SHOWS 2. - CLEANOUT NOT SHOWN AT THE
 BASE OF P/1. - NOT ALL PIPE SIZES SHOWN.-SHT P3-2.0
 RISER P/2 CLEANOUT DOWNSTREAM OF JANITOR SINK IN ROOM
 C4.101 NOT INSTALLED PER SECTION 706.3. SECOND CLEANOUT
 AT THE BASE OF P/2 NOT REQUIRED AS IT DOES NOT CLEANOUT
 THE BASE OF THE STACK, NOR DOES IT REFLECT THE FLOOR
 PLAN. - FLOOR DRAIN PIPING IN ROOM D1.101 AS INDICATED
 IS BEING INSTALLED ABOVE THE FLOOR. - EACH DRINKING
 FOUNTAIN SHALL HAVE ITS OWN TRAP. SAFE WASTE FOR THE
 FIXTURES IS NOT APPROVED.(SEE ROOMS D1.101, D1.108,
 AND A3.111). -CLEANOUTS ARE REQUIRED AT THE BASE OF
 STACKS P/4 & P/10. - CLEANOUT FOR P/7 NOT INSTALLED AT
 THE BASE OF P/7. -THE NEW SANT. PIPING TO TOILET ROOM
 D2.105 NOT SHOWN ON THE FLOOR PLAN. -SHOW ALL TOILET
 ROOM NUMBERS ON THE RISER DIAGRAM. - SHOW ALL PIPE
 SIZES. THE PIPE SIZES ARE NOT SHOWN ON MANY PIPES.-
 SHT P3-3.0A TWO WAY CLEANOUT IS REQUIRED NEAR THE
 JUNCTION OF THE BUILDING DRAIN AND THE BUILDING SEWER.
 (DETAIL 1).-THE RISER DIAGRAM DOES NOT REFLECT THE
 FLOOR PLAN FOR A1.05 & A1.106. AN EXTRA FLOOR DRAIN IS
 INDICATED THAT IS NOT SHOWN ON THE FLOOR PLAN.-
 A3.102 & A3.103 ONLY SHOWS 2 LAVS ON THE RISER AND THE
 FLOOR PLAN SHOWS 4.-A4.103 & A4.104TWO W/C'S ARE
 MISSING FROM THE RISER THAT ARE SHOWN ON THE FLOOR
 PLAN.-A4.105NO FLOOR DRAIN AND A SECOND SINK ARE
 SHOWN ON THE FLOOR PLAN THAT ARE NOT SHOWN ON THE RISER
 DIAGRAM. (JANITOR ROOM).-A5.105 SHOWS THE BRANCH
 LINE CONNECTING NEAR THE DRINKING FOUNTAINS ON THE
 FLOOR PLAN, BUT CONNECTING DOWNSTREAM OF THE NEXT
 FIXTURES ON THE RISER DIAGRAM.-A CLEANOUT IS
 REQUIRED AT THE BASE OF RISER P/8-ALL RISER
 DIAGRAMS,CHECK ALL PIPE SIZES, MAKE SURE THE RISER
 DIAGRAMS REFLECT THE FLOOR PLAN FOR BOTH THE SANITARY
 AND THE VENTING.SECTIONS106.1.1, 106..1.2, 706.3,
 708.3.4, 708.3.5, 100.2.1.
 ******RESPONSE NOTED, BUT NOW THE FLOOR PLAN SHOWS 3
 DRINKING FOUNTAINS & THE SANT. RISER SHOW 2. PLEASE
 CORRELATE.--D1.108 STILL SHOWS A SAFE WASTE AT THE
 CENTER DRINKING FOUNTAIN.
  
 37. OK
 38. OK
 39. OK
  
 40. ALL PME & FIRE PROTECTION SHEETS. PLANS SHALL BE
 SIGNED, SEALED, AND DATED. SECTION 106.1. ALL TITLE
 BLOCK INFORMATION REQUIRED BY FAC 61G1-23.002 AND FS
 471.025 SHALL BE SUBMITTED ON EACH SHEET. ****RESPONSE
 NOTED, BUT THE SEAL USED IS NOT APPROVED. NEW SEALS
 SHALL INDICATE THE WORD "LICENSE" IN THE SEAL. (SEE
 ATTACHED SHEET FROM THE FLORIDA BOARD OF PROFESSIONAL
 ENGINEERS).
 ****RESPONSE NOTED, BUT THE SEALS OF SOME MECH. AND
 PLUMBING SHEETS ARE STILL THE OLD SEAL. - ALSO THERE
 SEEMS TO BE TWO SETS OF SIGNATURES FOR THE ENGINEER OF
 RECORD. PLEASE SUBMIT A SIGNED, SEALED, DATED,
 NOTORIZED LETTER INDICATING THE LEGAL SIGNATURE OF THE
 ENGINEER OF RECORD FOR OUR FILES. ONE SET OF PLANS
 SHALL BE RETAINED FOR POSSIBLE REVIEW BY THE FLORIDA
 BOARD OF PROFESSIONAL ENGINEERS.
 ******RESPONSE NOTED, BUT THERE ARE STILL SOME SEALS
 WITH "CERTIFICATE" ON THE MECHANICAL SHEETS.
  
 **************NEW COMMENTS**************
  
 1B. SHTS P1-1.0U, P1-1.1U, P1-1.1 & P1-2.1. RWL-4 DOES
 NOT REFLECT THE SQUARE FOOTAGE SHOWN ON RISER DIAGRAM
 OR ROOF PLAN. PLEASE CORRELATE RISER, FLOOR PLAN, &
 ROOF PLAN. SECTION 106.1.1.
 ****RESPONSE NOTED. WILL RECHECK AFTER THE CALCULATIONS
 FOR THE ROOF DRAINS HAS BEEN RESUBMITTED WITH
 CORRECTIONS.
 ******RESPONSE NOTED, BUT SOME SHEETS SHOW A DIFFERENT
 SQUARE FOOTAGE THAN SHOWN ON THE ROOF PLAN & RISER.
 PLEASE CORRELATE ALL SHEETS.
  
 2B. OK
 3B. OK
 4B. OK
 5B. OK
  
 6B. SHTS P1-1.2U, ASSOCIATED RISER DIAGRAMS, AND
 ENLARGED FLOOR PLANS. INDICATE HOW THE STACKS P/1 &
 P/10 CAN DRAIN INTO THE TOILET GROUP FIXTURE BRANCH.
 SUBMIT A DETAIL SHOWING THE 4" CLEANOUT TEE, THE 4"
 CROSS FOR THE FIXTURE BRANCH, AND THE 4" DOUBLE
 Y/EIGHTH BEND FITTINGS STACKED ON TOP OF EACH OTHER.
 WILL THEY BE AT THE RIGHT HEIGHT FOR THE W/C'S?SEE
 SECTION 908.3 ALSO. SECTION 106.1.1. (STACKS SHOULD
 CONNECT TO THE BUILDING DRAIN AND FIXTURE GROUPS SHOULD
 CONNECT TO THE STACK SO THAT THE STACK DOES NOT RUN
 THRU THE MIDDLE OF THE FIXTURE GROUP). ****RESPONSE
 NOTED, BUT C/O'S ARE REQUIRED AT THE BASE OF EACH
 STACK. COMMENT HAS NOT BEEN ADDRESSED. ******RESPONSE
 NOTED, BUT NOW THE VENTING TO THE W/C'S IS NOT SHOWN ON
 THE 1ST FLOOR STACK P-10.
  
 7B. SHTS P1-1.3U, P1-2.0, P1-2.3, P1-3.3, & P1-4.3
 RWL-6 DOES NOT REFLECT THE SQUARE FOOTAGE SHOWN ON THE
 RISER DIAGRAM, NOR ON THE ROOF PLAN. PLEASE CORRELATE
 INFORMATION. SECTION 106.1.1 & TABLE 1106.3.
 ****RESPONSE NOTED, BUT THE COMMENT WAS NOT ADDRESSED
 ON SHTS P1-3.3, & P1-4.3.
 ******RESPONSE NOTED, BUT THE SQUARE FOOTAGE ON SHTS
 P1-2.0 & P1-2.3 IS INDICATED AS 5,584SF. PLEASE
 CORRELATE ALL SHEETS.
  
 8B. OK
 9B. OK
 10B. OK
 11B. OK
 12B. OK
 13B. OK
 14B. OK
  
 15B. SHT P1-6.0 SHOW THE LOCATIONS FOR ALL VTR'S. -
 INDICATE THE RWL EACH ROOF DRAIN IS CONNECTED TO.
 SECTION 106.1.1.
 ****RESPONSE NOTED, BUT VTR'S 1, 3, 9 & 10 ARE NOT
 SHOWN.
 ******RESPONSE NOTED, BUT THE VTR FOR THE TOILET ROOM
 IN THE GARAGE IS NOT INDICATED PAST THE 1ST FLOOR.
 PLEASE SHOW THE VENT ON THE 2ND, 3RD, 4TH, 5TH & AT THE
 ROOF LEVEL OF THE GARAGE.
  
 16B. OK
 17B. OK
 18B. OK
 19B. OK
 20B. OK
 21B. OK
 22B. OK
 23B. OK
 24B. OK
 25B. OK.
 26B. OK
 27B. OK
 28B. OK
 29B. OK
 30B. OK
 31B. OK
 32B. OK
 33B. OK
  
 34B. SHT P3.1.0 SANT RISER DIAGRAM, TRAPS ARE REQUIRED
 ON ALL DRINKING FOUNTAINS. SECTION 1002.1. - 1ST FLOOR
 LAVS PIPING DOES NOT REFLECT THE FLOOR PLAN. - FLOOR
 DRAINS DOWNSTREAM OF RISER P/1 ARE NOT VENTED. SECTION
 901.2.1. - A C/O IS REQUIRED AT THE BASE OF STACK P/1
 SECTION 708.3.4 - SHOW THE CONNECTION DETAIL AT THE
 BASE OF STACK P/1 WITH A 4" CLEANOUT, A 4" CROSS, AND
 4" WYE FITTINGS INDICATING THE HEIGHT OF THE W/C
 STUBOUT. - W/C-1 AT THE BASE OF STACK IS NOT VENTED.
 SECTION 901.2.1. -W/C ON 2ND FLOOR IS NOT VENTED.
 SECTION 901.2.1. - LAV ON 3RD FLOOR NOT VENTED. SECTION
 901.2.1. - INDICATE HOW/WHERE PIPING FOR LAVS & FLOOR
 DRAINS CONNECT TO THE RISER/BRANCH ON THE 2ND, 3RD, &
 4TH FLOORS. THE FITTINGS INDICATE THAT THE PIPING IS
 SLOPED TO THE LAVS. PLEASE CLARIFY. - MEN C4.104 DOES
 NOT REFLECT ROOM NUMBER ON THE FLOOR PLAN. - PIPING FOR
 FLOOR DRAINS & LAVS 4TH FLOOR DOES NOT REFLECT THE
 FLOOR PLAN. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT 1ST FLOOR LAVS PIPING DOES NOT
 REFLECT THE FLOOR PLAN. -A C/O IS REQUIRED AT THE
 BASE OF STACK P/1 SECTION 708.3.4 - SHOW THE CONNECTION
 DETAIL AT THE BASE OF STACK P/1 WITH A 4" CLEANOUT, A
 4" CROSS, AND 4" WYE FITTINGS INDICATING THE HEIGHT OF
 THE W/C HOW THE CONNECTION DETAIL AT THE BASE OF STACK
 P/1 WITH A 4" CLEANOUT, A 4" CROSS, AND 4" WYE FITTINGS
 INDICATING THE HEIGHT OF THE W/C STUBOUT. - MEN C4.104
 DOES NOT REFLECT ROOM NUMBER ON THE FLOOR PLAN. -
 PIPING FOR FLOOR DRAINS & LAVS 4TH FLOOR DOES NOT
 REFLECT THE FLOOR PLAN. SECTION 106.1.1. THESE ITEMS
 HAVE NOT BEEN ADDRESSED.
 ******RESPONSE NOTED, BUT MEN'S C4.104 STILL DOES NOT
 REFLECT THE ROOM NUMBER ON THE FLOOR PLAN.--NOW NO
 SANITARY PIPING OR HOT WATER PIPING IS SHOWN ON THE
 FLOOR PLAN OF THE ENLARGED FLOOR PLAN. PLEASE CLARIFY.
  
 35B. ALL RISER DIAGRAMS, ALL FLOOR PLANS FOR ALL
 SYSTEMS. INDICATE THE PIPE SIZE. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT MANY PIPE SIZES ARE NOT SHOWN
 ON THE RISER DIAGRAMS.
 ******RESPONSE NOTED, BUT THERE ARE MANY SECTIONS OF
 SANITARY PIPING THAT HAVE NO PIPE SIZES. TABLES
 710.1(1) & 710.1(2).
  
 36B. SHT P3-2.0 JANITOR ROOM PIPING DOES NOT REFLECT
 THE FLOOR PLAN. - TRAPS REQUIRED ON ALL DRINKING
 FOUNTAINS. SECTION 1002.1. - CLEANOUTS REQUIRED AT THE
 BASE OF ALL STACKS. 708.3.4. - PIPING TO FLOOR DRAIN
 SHOWN ABOVE THE FLOOR IN ROOM D1.101. PLEASE CLARIFY. -
 PIPING AT THE BASE OF RISER P/2 DOES NOT REFLECT THE
 FLOOR PLAN. - PIPING TO FD-2 AT THE LOADING D1.106 DOES
 NOT REFLECT THE FLOOR PLAN. - PIPING FOR A1.108/A1.109
 DOES NOT REFLECT THE FLOOR PLAN. - ROOM D2.103 IS
 INDICATED AS D2.104 ON THE FLOOR PLAN. CORRELATE
 INFORMATION. - ALL VENTING AT RISER P/10 STOPS AT LEVEL
 2. SECTION 903.3 VTR REQUIRED. - TOILET ROOM A2.708 IS
 INDICATED AS A2.706 ON THE FLOOR PLAN. CORRELATE
 INFORMATION. - BATHROOM RISER DOES NOT REFLECT THE
 FLOOR PLAN. (NO FD). - PIPING TO ROOM A4.414 DOES NOT
 REFLECT THE FLOOR PLAN. - CLEANOUT PIPING DOWNSTREAM OF
 C4.101 IS NOT APPROVED AS PIPED. SECTION 706.3. -
 PIPING ON RISER DOES NOT REFLECT THE FLOOR PLAN
 UPSTREAM OF C3.105. - JANITOR SINK C3.105 IS NOT
 VENTED. SECTION 901.2.1. - FLOOR DRAIN CONNECTION AT
 BRANCH LINE 4TH FLOOR DOES NOT REFLECT THE FLOOR PLAN.
 - PIPING AT A2.107 DOES NOT REFLECT THE FLOOR PLAN. (NO
 F.D. PIPING). - PIPING AT ROOM A3.111 DOES NOT REFLECT
 THE FLOOR PLAN AT THE LAVS. - ROOM A3.111 SUBMIT A
 DETAIL FOR FITTING TO W/C & LAVS. - ROOM D2.105 SHOWN
 AS D2.106/D2.107 ON FLOOR PLANS. CORRELATE INFORMATION.
 - ROOM C3.410/C3.412 FLOOR DRAIN FITTING ARE SHOWN TO
 BE INSTALLED AGAINST THE FLOW. SECTION 706.3. - SECTION
 106.1.1.
 ****RESPONSE NOTED, BUT SOME COMMENTS WERE NOT
 ADDRESSED. SEE THE FOLLOWING: JANITOR ROOM PIPING DOES
 NOT REFLECT THE FLOOR PLAN. - TRAPS REQUIRED ON ALL
 DRINKING FOUNTAINS. SECTION 1002.1. - CLEANOUTS
 REQUIRED AT THE BASE OF ALL STACKS. 708.3.4. - PIPING
 TO FLOOR DRAIN SHOWN ABOVE THE FLOOR IN ROOM D1.101.
 PLEASE CLARIFY.- PIPING AT THE BASE OF RISER P/2 DOES
 NOT REFLECT THE FLOOR PLAN. - PIPING FOR A1.108/A1.109
 DOES NOT REFLECT THE FLOOR PLAN. - ROOM D2.103 IS
 INDICATED AS D2.104 ON THE FLOOR PLAN. CORRELATE
 INFORMATION.- TOILET ROOM A2.708 IS INDICATED AS
 A2.706 ON THE FLOOR PLAN. CORRELATE INFORMATION. -
 PIPING TO ROOM A4.414 DOES NOT REFLECT THE FLOOR PLAN.
 - CLEANOUT PIPING DOWNSTREAM OF C4.101 IS NOT APPROVED
 AS PIPED. SECTION 706.3. - PIPING AT ROOM A3.111 DOES
 NOT REFLECT THE FLOOR PLAN AT THE LAVS. - ROOM A3.111
 SUBMIT A DETAIL FOR FITTING TO W/C & LAVS. - ROOM
 D2.105 SHOWN AS D2.106/D2.107 ON FLOOR PLANS. CORRELATE
 INFORMATION.
 ******RESPONSE NOTED, BUT THE JANITOR ROOM PIPING DOES
 NOT REFLECT THE FLOOR PLAN.--TOILET ROOM A2.708 IS
 STILL INDICATED AS A2.706 ON THE FLOOR PLAN. CORRELATE
 ROOM NUMBERS.--PIPING TO ROOM A4.414 DOES NOT
 REFLECT THE FLOOR PLAN. RISER IS SHOWN AS A TRAVELING
 OFFSET. FLOOR PLAN SHOWS THIS AS A STRAIGHT RISER.
 PLEASE CLARIFY.
  
 37B. SHT P3-3.0 PIPING TO A3.304 & DOWNSTREAM DOES NOT
 REFLECT THE FLOOR PLAN. - VENT PIPING FROM S-1 SINK
 DOES NOT REFLECT THE FLOOR PLAN. OFFSET NOT SHOWN. -
 TRAPS REQUIRED ON ALL DRINKING FOUNTAINS. SECTION
 1002.1. - S-1 SINK SHALL NOT DRAIN THRU THE WET VENT OF
 THE TOILET ROOM A1.303. SINK SHALL DISCHARGE DOWNSTREAM
 OF THE W/C & LAV. SECTION 909.1. - INDICATE P/8 WITH
 P/6 AT THE BASE OF THE STACK WHERE IT BEGINS. - PIPING
 TO ROOMS A1.105/A1.106 DOES NOT REFLECT THE FLOOR PLAN.
 FLOOR DRAIN PIPING IS SHOWN AS ABOVE THE FLOOR. - P/5 &
 P/9 BEGIN AT THE BASE OF THE STACK. PLEASE INDICATE ON
 RISER DIAGRAM. - PIPING FOR A3.102/A3.103 DOES NOT
 REFLECT THE FLOOR PLAN. - CLEANOUT REQUIRED AT THE BASE
 OF P/9 STACK. - PIPING TO FLOOR DRAINS IN ROOMS
 A3.102/A3.103 ARE ABOVE THE FLOOR. -W/C AT THE BASE
 OF STACK NOT VENTED. SECTION 901.2.1. - INDICATE WHERE
 LINES TO FLOOR DRAINS IN ROOMS A4.103/A4.104 &
 A5.103/A5.104 ARE CONNECTING TO THE BRANCH/STACK. -
 PIPING FOR A4.103/A4.104 DOES NOT REFLECT THE FLOOR
 PLAN. - W/C AT RISER STACK A4.103 IS NOT VENTED.
 SECTION 901.2.1. - PIPING FOR A4.105 DOES NOT REFLECT
 THE FLOOR PLAN. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT THE FOLLOWING COMMENTS WERE NOT
 ADDRESSED:-PIPING TO A3.304 & DOWNSTREAM DOES NOT
 REFLECT THE FLOOR PLAN. - VENT PIPING FROM S-1 SINK
 DOES NOT REFLECT THE FLOOR PLAN. OFFSET NOT SHOWN. -
 PIPING TO ROOMS A1.105/A1.106 DOES NOT REFLECT THE
 FLOOR PLAN. FLOOR DRAIN PIPING IS SHOWN AS ABOVE THE
 FLOOR. -PIPING FOR A4.103/A4.104 DOES NOT REFLECT THE
 FLOOR PLAN. - W/C AT RISER STACK A4.103 IS NOT VENTED.
 SECTION 901.2.1. - PIPING FOR A4.105 DOES NOT REFLECT
 THE FLOOR PLAN. SECTION 106.1.1.
 ******RESPONSE NOTED, BUT THE PIPING TO A3.304 &
 DOWNSTREAM DOES NOT REFLECT THE FLOOR PLAN. CORRELATE
 RISER & FLOOR PLAN.--VENT PIPING FROM S-1 SINK
 STILL DOES NOT REFLECT THE FLOOR PLAN. CORRELATE RISER
 AND FLOOR PLAN.
  
 38B. OK
  
 39B. SEPARATE GAS PERMIT REQUIRED. THE FOLLOWING
 INFORMATION IS REQUIRED FOR THE GAS PERMIT:
  
 A. OK
 B. OK
 C. OK
 D. OK
  
 E. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
 ****RESPONSE NOTED, BUT NOT ADDRESSED. ******RESPONSE
 NOTED, BUT THE SIZING OF THE PIPE SHALL BE TO THE MOST
 REMOTE APPLIANCE/GENERATOR. PLEASE INDICATE THE TOTAL
 DEVELOPED LENGTH TO THE MOST REMOTE FUTURE GENERATOR.
  
 F. OK
  
 G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 ****RESPONSE NOTED, BUT NO MANUF. SHEETS FOR THE
 GENERATOR HAS BEEN SUBMITTED. - ALSO SUBMIT THE MANUF.
 SPECIFICATION SHEETS FOR THE GAS REGULATORS. INDICATE
 MODEL NUMBER. LISTING INFORMATION REQUIRED.
 ******RESPONSE NOTED, BUT THE BTU LOAD FOR THE NATURAL
 GAS @ 100% LOAD IS NOT INDICATED ON THE MANUF.
 SPECIFICATION SHEETS. THIS SHALL BE SHOWN TO VERIFY
 PIPE SIZING.
  
 H. NA
 I. NA
  
 40B. SHT P3-5.0 NO HOT WATER LINE SHOWN IN 1ST THRU 4TH
 FLOOR TOILET ROOMS OFF WATER RISER W/1. - WATER RISER
 DOES NOT REFLECT THE FLOOR PLAN AT THE LAVS. - FULL
 OPEN VALVES ARE REQUIRED ON ALL WATER DOWN-FEED LINES.
 SECTION 606.1(4). - RISER DOES NOT REFLECT THE FLOOR
 PLAN AT ROOMS C2.102/C2.103. (2 LAVS SHOWN EACH TOILET
 ROOM). - PIPE SIZE SUPPLYING ROOMS D1.101/D1.102,
 JANITOR ROOM D1.110, TOILET ROOMS A1.108/A1.109. -
 INDICATE THAT RISERS W/4, W/5, & W/8 RISERS START WITH
 RISER W/2 ON THE 1ST FLOOR. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT THE FOLLOWING COMMENTS WERE NOT
 ADDRESSED: - WATER RISER DOES NOT REFLECT THE FLOOR
 PLAN AT THE LAVS. - FULL OPEN VALVES ARE REQUIRED ON
 ALL WATER DOWN-FEED LINES. SECTION 606.1(4). (MANY
 LAVS, TOILET ROOMS, SINKS ETC MISSING VALVES).- RISER
 DOES NOT REFLECT THE FLOOR PLAN AT ROOMS C2.102/C2.103.
 (2 LAVS SHOWN EACH TOILET ROOM). - PIPE SIZE SUPPLYING
 ROOMS D1.101/D1.102, JANITOR ROOM D1.110, TOILET ROOMS
 A1.108/A1.109. (2" SHOWN ON FLOOR PLAN, 1-1/2" ON
 RISER. 3/4" ON FLOOR PLAN, 1/2" ON RISER.SOME LAVS
 SHOW SEPARATE DROPS TO EACH LAV ON THE FLOOR PLAN, BUT
 SINGLE DROPS ON THE RISER). - INDICATE THAT RISERW/8
 STARTS WITH RISER W/2 ON THE 1ST FLOOR. SECTION
 106.1.1.
 ******RESPONSE NOTED, BUT THE SIZE OF THE SUPPLY PIPING
 TO THE JANITOR ROOM D1.110 DOES NOT REFLECT THE FLOOR
 PLAN, AS WELL AS THE PIPE SIZE SUPPLYING TOILET ROOMS
 A1.108/A1.109. PLEASE CORRELATE THE RISER AND FLOOR
 PLAN.
  
 41B. SHT P3-6.0 RISERS 4, 5 & 8 ARE NOT INDICATED ON
 THE 1ST FLOOR. - RISER DOES NOT REFLECT THE FLOOR PLAN
 ROOMS C3.107/C3.108 AT JAN. SINK, ROOMS C3.410/C3.412,
 AE.111, A4.103/A4.104, A4.105 AND THE TOP OF RISER W/4
 TO ROOM A5.105, PIPE SIZE AT ROOM A2.209 & SUPPLY TO
 TOILET ROOM ADJACENT, PIPE SIZE SUPPLYING RISER W/8 &
 RISER, SUPPLY LINE TO ROOMS D2.102/D2.103. - W/2 NOT
 FOUND ON 4TH FLOOR AS INDICATED ON RISER. SECTION
 106.1.1.
 ****RESPONSE NOTED, BUT THE FOLLOWING COMMENTS WERE NOT
 ADDRESSSED: RISER 8 STILL NOT INDICATED ON THE 1ST
 FLOOR. - RISER DOES NOT REFLECT THE FLOOR PLAN ROOMS
 C3.410/C3.412,A4.103/A4.104, (FLOOR PLAN INDICATES
 OVER-HEAD SUPPLY WITH DROPS, BUT RISER INDICATES SUPPLY
 RUN IN THE WALL OFF WATER RISER. TWO W/C'S MISSING ON
 RISER).-PIPE SIZE AT ROOM A2.209, (SHOWS 1" ON THE
 FLOOR PLAN), - PIPE SIZE SUPPLYING RISER W/8 & RISER, (
 1" ON FLOOR PLAN, 2" ON RISER - 1-1/2" ON THE FLOOR
 PLAN, BUT 2" ON THE RISER). -W/2 NOT FOUND ON 4TH OR
 5TH FLOORS AS INDICATED ON RISER. SECTION 106.1.1.
 PLEASE CORRELATE RISER AND FLOOR PLANS. ******RESPONSE
 NOTED, BUT THE RISER STILL DOES NOT REFLECT THE FLOOR
 PLAN, NOR DOES IT REFLECT THE PIPE SIZING FOR THE HOT
 SUPPLY TO TOILET ROOMS C3.410/C3.412.--TOILET ROOMS
 A4.103/A4.104 WATER PIPING STILL DOES NOT REFLECT THE
 FLOOR PLAN.--PIPE SIZE SUPPLYING RISER W/8 STILL
 DOES NOT REFLECT THE FLOOR PLAN. CHECK PIPING
 DOWNSTREAM OF RISER W/8 AND CORRELATE PIPING BETWEEN
 THE RISER AND THE FLOOR PLAN.
  
 42B. SHT P3-7.0 SIZE ALL PIPE PER SECTION 1106.3, AND
 SHOW ALL PIPE SIZES ON THE RISER. - RISER DOES NOT
 REFLECT THE FLOOR PLAN TOP FLOORS RWL/6 & RWL/7. -
 RISERS INDICATE A 5TH FLOOR, BUT FLOOR PLAN DOES NOT
 SHOW A 5TH FLOOR. - RISER SHOWS TRENCH DRAINS ON TWO
 FLOORS, BUT ONLY SHOW TRENCH DRAINS ON 1 FLOOR, (ROOF
 LEVEL), ON THE FLOOR PLAN. -RWL'S 9 THRU 14 SHOW OFFSET
 PIPING FOR ROOF DRAINS IN THE 4TH FLOOR CEILING, BUT
 INDICATE THE ROOF DRAINS TO BE ON THE 4TH LEVEL. PLEASE
 CLARIFY. - PIPE SIZING IS INCORRECT AT 8"/11,715SF,
 6"/5077SF, 6"/6657SF. TABLE 1106.3. - RWL/9 INDICATES
 PIPING IN 3RD FLOOR CEILING, BUT ROOF DRAINS ARE TO BE
 ON THE 3RD LEVEL. PLEASE CLARIFY. - RWL/15 DOES NOT
 REFLECT THE FLOOR PLAN TO 4" ROOF DRAINS. - PIPING AT
 THE 1ST FLOOR CEILING CONNECTING TO ROOF DRAINS ON THE
 1ST LEVEL. PLEASE CLARIFY. SECTION 106.1.1.
 ****RESPONSE NOTED, BUT SOME COMMENTS THE FOLLOWING
 COMMENTS WERE NOT ADDRESSED:- RISER DOES NOT REFLECT
 THE FLOOR PLAN TOP FLOORS RWL/6 & RWL/7. - RISERS
 INDICATE A 5TH FLOOR, BUT FLOOR PLAN DOES NOT SHOW A
 5TH FLOOR. - RISER SHOWS TRENCH DRAINS ON TWO FLOORS,
 BUT ONLY SHOW TRENCH DRAINS ON 1 FLOOR, (ROOF LEVEL),
 ON THE FLOOR PLAN. - PIPE SIZING IS INCORRECT AT
 8"/11,715SF, 6"/5077SF, 6"/6657SF. TABLE 1106.3.
 ******RESPONSE NOTED, BUT I STILL HAVE QUESTIONS AS TO
 THE TRENCH DRAINS. IT SEEMS ON THE RISER DIAGRAM THAT
 THE UPPER TRENCH DRAINS ARE SHOWN AT THE WRONG
 ELEVATIONS. THERE IS NO LEVEL ABOVE THE 5TH LEVEL FOR
 RWL 7 & THE AREA DRAINS FOR THE ROOF ON RWL 6COLLECT
 THE ROOF AREA. SHOULDN'T THE TRENCH DRAINS BE AT THE
 BOTTOM OF THE RAMPS BELOW THE ROOF AREAS. PLEASE
 CLARIFY.
  
 43B. SHTS 1,2,3 OF 3 ARE NOT SIGNED, SEALED, & DATED AS
 REQUIRED PER FS 472.025(1). ALSO SEE SHT 1 WHICH STATES
 "NOT VALID UNLESS SEALED WITH SURVEYOR'S EMBOSSED SEAL
 AND SIGNATURE"
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT SHTS 2 & 3 ARE NOT SIGNED,
 SEALED, DATED. IF THE DESIGN PROFESSIONAL IS AN
 ARCHITECT OR ENGINEER LEGALLY RESISTERED UNDER THE LAWS
 OF THIS STATE REGULATING THE PRACTICE OF ARCHITECTURE
 AS PROVIDED FOR IN CHAPTER 481, FLORIDA STATUTES, PART
 I,OR ENGINEERING AS PROVIDED FOR IN CHAPTER 471,
 FLORIDA STATUTES, THEN HE OR SHE SHALL AFFIX HIS OR HER
 OFFICIAL SEAL, SIGNATURE AND DATE TO SAID DRAWINGS,
 SPECIFICATIONS AND ACCOMPANYING DATA AS REQUIRED BY
 FLORIDA STATUTES. SECTION 106.1.
  
 44B. SHTS C1, C5 THRU C22 ENGINEERING CERTIFICATE OF
 AUTHORIZTION IS REQUIRED IN THE TITLE BLOCK.
 61G15-23.002(2) & FS 471.025. - AN EMBOSSED SEAL IS
 REQUIRED TO IMPRESS REQUIRED INFORMATION ON EACH SHEET.
 UNABLE TO GLEAN ALL INFORMATION REQUIRED FROM SEAL.
 PLEASE RESEAL PLANS.
 ****NO RESPONSE, NOT ADDRESSED.
 ******NO RESPONSE, NOT ADDRESSED.
  
 45B. OK
 46B. OK
 47B. OK
 48B. OK
  
 49B. SHT LSO.0 PLUMBING FIXTURE COUNT. CITY HALL 3RD
 FLOOR DRINKING FOUNTAINS SHOW ONLY 3 ARE REQUIRED. PER
 TABLE 403.1, 4 DRINKING FOUNTAINS ARE REQUIRED. PLEASE
 UPDATE FIXTURE COUNT.
 ****NO RESPONSE, NOT ADDRESSED.
 *****RESPONSE NOTED, NO CHANGE NOTED, NOT ADDRESSED
  
 50B. OK
  
 51B. SHT LSO.0 PLUMBING FIXTURE COUNT. LIBRARY 1ST
 FLOOR DRINKING FOUNTAINS 2 REQUIRED PER TABLE 403.1,
 BUT READS 1 REQUIRED. PLEASE CORRECT FIXTURE COUNT
 REQUIRED.
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, NO CHANGE, NOT ADDRESSED.
  
 52B. SHT LSO.0 PLUMBING FIXTURE COUNT. LIBRARY 3RD
 FLOOR DRINKING FOUNTAINS 4 REQUIRED PER TABLE 403.1,
 BUT READS 2 REQUIRED. PLEASE CORRECT FIXTURE COUNT
 REQUIRED. - SHOWS 2 PROVIDED, BUT 4 ARE REQUIRED.
 PLEASE CORRECT INFORMATION.
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, NOW SHOWS 3 REQUIRED, 4 DRINKING
 FOUNTAINS ARE REQUIRED. NOT ADDRESSED.
  
 53B. SHT LSO.0 PLUMBING FIXTURE COUNT. LIBRARY 4TH
 FLOOR LAVS REQUIRED 2, INDICATED AS 1. PLEASE CORRECT
 THE FIXTURE COUNT. TABLE 403.1.
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, NO CHANGE, NOT ADDRESSED.
  
 54B. OK
  
 55B. SHT LSO.0 INDICATES ASSEMBLY OCCUPANCY FOR THE
 CITY HALL AND LIBRARY/MUSEUM. POTTY PARITY IS REQUIRED
 PER SECTION 403.1.1 AND HAS BEEN INDICATED IN THE 50%
 REVIEW BY PAUL SCHMITZ. THIS HAS NOT BEEN ADDRESSED.
 PLEASE SHOW COMPLIANCE WITH THIS REQUIREMENT. ****NO
 RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT POTTY PARITY HAS NOT BEEN
 ADDRESSED, THERE IS NO 3:2 RATIO AS REQUIRED. THERE IS
 A 1:1 RATIO. THE SECTION OF THE CODE REFERENCED DOES
 NOT SAY THAT IF THERE IS A DIFFERENCE OF 2 OR MORE
 WATER CLOSETS FOR WOMEN PARITY IS AUTOMATICALLY
 ACHIEVED.IT STATES "UNLESS THERE ARE 2 OR FEWER
 FIXTURES FOR MEN". THIS MEANS THAT IF THE OCCUPANCY IS
 SMALL ENOUGH TO ONLY REQUIRE 2 FIXTURES FOR THE MEN,
 THEN POTTY PARITY IS NOT REQUIRED. NO MENTION OF POTTY
 PARITY FOR CITY HALL ASSEMBLY HAS BEEN MENTIONED IN THE
 RESPONSE. PLEASE INDICATE HOW POTTY PARITY WILL BE
 COMPLIED WITH.
  
 56B. OK
 57B. OK
 58B. OK
 59B. OK
 60B. OK
 61B. OK
 62B. OK
  
 63B. SHT A6-1.1 DETAIL 7, ACCESSIBLE W/C SHALL BE 1'6"
 OFF THE WALL TO THE CENTERLINE OF THE FIXTURE. FIG.
 11-28. (SHOWS 2'2").
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, NO CHANGE, NOT ADDRESSED
  
 64B. OK
 65B. OK
 66B. OK
 67B. OK
 68B. OK
 69B. OK
  
 70B. SHTS A9-0.1 & A9-0.2 FINISH SCHEDULES: ROOMS
 C1.105, C1.106, A2.705, A2.706, A2.210, A2.211, A3.111,
 A3.114, C3.410, AND C3.412 ALL INDICATE THE WALLS TO BE
 PAINTED. PLEASE INDICATE HOW THIS COMPLIES WITH THE
 REQUIREMENT FOR "SMOOTH, HARD, NONABSORBENT WALLS AS
 REQUIRED IN SECTION 1210.2.
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT EPOXY DOES NOT COMPLY WITH
 THE REQUIREMENT FOR THE SURFACE TO BE HARD.--PLEASE
 INDICATE WHAT PNT-5, CT 2-5 MEANS. THE FLOOR AND BASE
 HAVE BEEN INDICATE AS CT. DOES THE CT 2-5 MEAN THAT THE
 CERAMIC TILE WILL START AT 2' AND EXTEND UP TO 5'? IF
 SO, WILL THE BASE BE 2' WIDE? PLEASE CLARIFY AS THERE
 IS NO FINISH LEGNED WITH THE NUMBER DESIGNATIONS AFTER
 THE MATERIAL. (PNT-5 OR CT 2-5).
  
 71B. OK
  
 72B. SHT A9-4.1 INDICATE THE ROOM NUMBERS THAT THE
 DETAIL IS REFERENCING. SHOW COMPLIANCE WITH THE
 FOLLOWING:
 A. 11-4.18.4 FLUSH CONTROLS
 B. 11-4.19.2 CLEARANCES
 C. 11-4.19.4 EXPOSED PIPES & CLEARANCES
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT THE CONTROL HEIGHT FOR THE
 URINAL IS NOT INDICATED.
  
 73B. SHT A9-4.2 INDICATE THE ROOM NUMBERS THAT THE
 DETAIL IS REFERENCING. SHOW COMPLIANCE WITH THE
 FOLLOWING:
 DETAIL #1
 A. 11-4.18.4 FLUSH CONTROLS
 B. 11-4.19.2 CLEARANCES
 C. 11-4.19.4 EXPOSED PIPES & CLEARANCES
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT THE CONTROL HEIGHT FOR THE
 URINAL IS NOT INDICATED.
  
 DETAIL #2
 A. 11-4.18.4 FLUSH CONTROLS
 B. 11-4.19.2 CLEARANCES
 C. 11-4.19.4 EXPOSED PIPES & CLEARANCES
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT THE CONTROL HEIGHT FOR THE
 URINAL IS NOT INDICATED.
  
 74B. OK
  
 75B. SHT A9-4.5 DETAILS (1) & (2), SHOW THE FOLLOWING
 FOR COMPLIANCE:A. 11-4.19.2 CLEARANCES
 B. 11-4.19.4 EXPOSED PIPES & SURFACES
 C. 11-4.19.5 FAUCETS
 D. 11-4.21.5 CONTROLS
 E. 11-4.21.7 CURBS
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT THE HEIGHT FOR THE CONTROLS
 IN THE SHOWER ARE NOT INDICATED.
  
 76B. SHTS A1.307, A1.709, A2.209, A2.315, A2.407,
 A3.109, C3.409, C3.310, A5.504 - SHOW COMPLIANCE WITH
 THE FOLLOWING
 A. 11-4.24.4 SINK DEPTH
 B. 11-4.24.5 CLEAR FLOOR SPACE (FORWARD APPROACH
 REQUIRED)
 C. 11-4.24.6 EXPOSED PIPES & SURFACES
 D. 11-4.24.7 FAUCETS
 ****NO RESPONSE, NOT ADDRESSED.
 ******RESPONSE NOTED, BUT THE FAUCETS WERE NOT
 ADDRESSED.
  
 *************NEW COMMENTS*************
  
 1C. SHTA9-4.6 DETAILS 1 & 2 SHOW COMPLIANCE WITH THE
 FOLLOWING:
 A. 11-4.18.4 FLUSH CONTROLS
 B. 11-4.19.2 CLEARANCES
 C. 11-4.19.4 EXPOSED PIPES & SURFACES ******RESPONSE
 NOTED, BUT THE SHEET NUMBER WAS A TYPO. THIS IS
 REQUIRED ON SHT A9-4.6.
  
 2C. SHT A9-4.7 DETAILS 1, 2, & 3 SHOW COMPLIANCE WITH
 THE FOLLOWING:
 A. 11-4.18.4 FLUSH CONTROLS
 B. 11-4.19.2 CLEARANCES
 C. 11-4.19.4 EXPOSED PIPES & SURFACES ******RESPONSE
 NOTED, BUT THE SHEET NUMBER WAS A TYPO. THIS IS
 REQUIRED ON SHT A-04.7.
  
 3C. SHT P1-6.0 THE FOLLOWING VENTS ARE NOT SHOWN ON THE
 ROOF. P1, P2, P3, & P10. PLEASE SHOW ON THIS SHEET OR
 INDICATE WHERE THEY ARE SHOWN. SECTION 106.1.1.
 ******RESPONSE NOTED, BUT VTR P2 IS NOT INDICATED AND
 SHOULD BE LOCATED AT OR NEAR COL. LINE H/2 AS THE RISER
 DIAGRAM INDICATES THE VENT WITH NO OFFSETS.
  
 **************NEW COMMENTS*************
  
 1D. SHT P3-2.0, 1ST FLOOR VENTING FOR THE WATER CLOSETS
 AT THE BASE OF RISER P10 IS NOT SHOWN. SECTION
 901.2.1.
  
 2D. SHT P2-1.0 DETAILS 1 THRU 5. THE SANITARY PIPING IS
 NOT SHOWN ON THE ENLARGED PLANS. ALSO CHECK FOR BOTH
 HOT AND COLD WATER LINES. SECTION 106.1.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. SUBMITTING THE RED
 LINED SET OF PLUMBING SHEETS WHEN RESUBMITTING FOR
 REVIEW WILL HELP EXPEDITE THE PERMIT ALSO. THANK YOU
 FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6721
 E-MAIL [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy