2006-10-20 14:14:50UNSAT
 REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1
  
 THE FOLLOWING INFORMATION IS REQUIRED FOR GAS PLAN
 REVIEW:
  
 1. THE DISTANCES BETWEEN THE GENERATOR AND THE CLOSEST
 STRUCTURES AND PROPERTY LINES MUST BE CLEARLY INDICATED
 ON THE SURVEY.
  
 2. PROVIDE MANUFACTURERS SPECIFICATIONS AND
 RECOMMENDATIONS REGAURDING CLEARENCES FOR THE GENERATOR
 IN RELATION TO PERMANENT STRUCTURES.
  
 3. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE. (NOTE: THIS MEANS ABOVE AND BELOW
 GROUND.)
  
 4. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED. ( NOTE: THIS
 MEANS ABOVE AND BELOW GROUND.)
  
 5. TYPE OF GAS, (LP OR NATURAL)
  
 6. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
  
 7. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
  
 8. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT
 (2LB REGULATOR) TO VERIFY COMPLIANCE WITH STANDARDS
 NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2
  
 10. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 11. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  
 12. FBC-2004 CHAPTER 1,SECTION 106.3.4.2:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING. PLEASE DO
 THIS PRIOR TO RESUBMITTING.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved