Date |
Text |
2006-11-16 17:12:06 | PLEASE PROVIDE FOLLOWING INFO: |
| 1. CITY OF WPB STANDARD NOTES ON DRAWING FOR PARKING, |
| HANDICAP PARKING, PAINTPER CITY CODES ETC.,, MUST |
| MEET PER ADA,,SIDEWALK WIDTH, ITS SLOPE, DRIVEWAY |
| ETC., |
| 2. DUMPSTER DETAILS PER CITY OF WPB, &LOCATION ON |
| DWG, MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| SIDEWALK ELEVATION MUST MEET FL BLDG CODE, PLEASE SHOW |
| ON THE DRAWINGS. |
| 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT, AND |
| GEOTECHNICAL REPORT |
| 5.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| OR2.5"CRITERIA, ?PERVIOUS,IMPERVIOUS AREA CAL., |
| |
| 6. WHAT IS THE SITE AREA, ? |
| 7. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| AROUND YOUR SITE SO, WE CAN DETERMINE THE BEST PIPE TO |
| CONNECT WITH THE STORM WATER FROM ALL OTHER STORM WATER |
| PIPES. PLEASE SHOW DETAIL OF THE CONTROL STRUCTURES |
| WITH ELEVATIONS.DID YOU USE EXFILTRATION TRENCH? |
| 8. POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| ETC., PLANS LIKE SHOWING SILT FENCE AROUND THE SITE |
| 9. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| 10. ALSO PLEASE SHOW ALL CATCH BASINS AROUND YOUR SITE |
| FOR STORM WATER DRAIN. |
| |
| PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| PERMITTING PROCESS |
| |
| RASIK CHOKSHI 805-6723 |