Plan Review Notes For Permit 06090950 |
Permit Number |
06090950 |
|
Review Stop |
B |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2006-11-06 17:28:21 | BUILDING REVIEW 2ND CHECKLIST: | | | | 1- ACCORDING TO INSTALLATION SCHEDULE SUBMITTED THE | | EDGE DISTANCE IS 3".THEREFORE,NEED TO REVISE THE | | ANCHOR SPACING AS REQUIRED ON PAGE 7 OF 8 OF DRAWINGS | | SUBMITTED. | | | | 2- ACCORDING TO THE INSTALLATION SCHEDULE SUBMITTED THE | | CALCULATED DESIGN PRESSURES ARE -60PSF.NEED TO REVISE | | ANCHOR SPACING ACCORDING TO THE DESIGN PRESSURES AND IF | | STRUCTURE TO BE ATTACHED IS HOLLOW CONCRETE BLOCK OR | | CONCRETE BLOCK WITH FILLED CELLS. SEE DRAWING 6 OF 8 OF | | DRAWINGS SUBMITTED. CLEARLY INDICATE IF CONCRETE BLOCK | | HAS FILLED CELLS OR NOT. | | | | JULIO GOMEZ | | BUILDING PLANS EXAMINER | | (561)805-6712 |
|