Date |
Text |
2006-10-27 13:15:10 | DENIED |
| REFERENCE: FBC-2004 PLUMB |
| FBC-2004 BUILDING |
| FBC-2004 CHAPTER 1 |
| FBC-2004 CHAPTER 11 |
| |
| 1. SHTS A-1.0 & A-1.1 INDICATE THE CLEAR FLOOR SPACE |
| FOR THE BREAK ROOM SINKS PER SECTION 11-4.24.5. - |
| INDICATE THE CLEAR FLOOR SPACE FOR THE URINALS PER |
| SECTION 11-4.18.3. |
| |
| 2. SHT A-3.0 DETAIL #5 SHOW THE HEIGHT FOR THE OVERFLOW |
| SCUPPER. SEE SECTION 1503.4.3. |
| |
| |
| 3. SHT A-7.1 DETAILS #2 & 6 SHOW COMPLIANCE WITH |
| SECTION 11-4.19.5 FAUCETS. |
| |
| 4. SHT A-7.1 DETAILS #4 & 5 SHOW COMPLIANCE WITH |
| SECTIONS 11-4.24.2 HEIGHT, (DETAIL 5), 11-4.24.3 KNEE |
| CLEARANCE, 11-4.24.5 CLEAR FLOOR SPACE, (FORWARD |
| APPROACH REQUIRED). GARBAGE DISPOSALS ARE NOT APPROVED |
| IN THE CLEAR FLOOR SPACE/KNEE CLEARANCE AREA. PLEASE |
| DELETE REFERENCE TO GARBAGE DISPOSALS. |
| |
| 5. SHT A-7.1 DETAILS #1 & 6 SHOW COMPLIANCE WITH |
| SECTION 11-4.18.3 CLEAR FLOOR SPACE & SECTION 11-4.18.4 |
| FLUSH CONTROLS. |
| |
| 6. SHT A-7.1 DETAILS #6 & 7 INDICATE COMPLIANCE WITH |
| SECTIONS 11-4.16, 11-4.18, 11-4.19, & 11-4.22 AND ALL |
| SUBSECTIONS. SUBMIT THE ELEVATIONS FOR ACCESSIBLE |
| STALLS. INDICATE 1'6" OFF THE WALL TO THE CENTERLINE OF |
| THE W/C FIXTURE, AND 1'3" MIN. TO THE CENTERLINE OF THE |
| LAV OFF THE WALL. SEE FIGS. 28, & 32. |
| |
| 7. SHT A-8.0 ROOM FINISH SECEDULE. ROOM MARKS F-10. |
| INDICATE HOW PAINT ON G.B. AND/OR BLOCK MEETS THE |
| REQUIREMENT FOR A "SMOOTH, HARD, NONABSORBENT SURFACE", |
| REQUIRED IN SECTION 1210.2. |
| |
| 8. SHT P5.1 DOMESTIC WATER ISOMETRIC. WATER HAMMER |
| ARRESTOR SHALL BE LOCATED NEAR THE FIXTURE IN AN |
| "EFFECTIVE RANGE", NOT IN THE CEILING AS SHOWN. PDI-WH |
| 201 AND MANUF. INSTALLATION INSTRUCTIONS. - A FULL OPEN |
| VALVE IS REQUIRED AT THE ENTRANCE INTO THE STRUCTURE |
| PER SECTION 606.1(2). PLEASE INDICATE ON WATER RISER |
| ISOMETRIC DIAGRAM. |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |