2006-10-24 19:55:53 | ----------------DENIED---------------- |
| 1. M0.1 OUTSIDE AIR CALCULATIONS SCHEDULE: NOTE STATES |
| "ALL RTU'S ARE EXISTING..." HOW ARE UNITS EXISTING ON |
| NEW BUILDING? PLEASE CORRECT OR CLARIFY. |
| |
| 2. M0.1 MECHANICAL NOTES: NOTE 7B STATES "ALL AIR |
| CONDITIONING DUCTWORK SHALL BE OF 1 1/2"... |
| FIBERGLASS..."THIS IS IN CONFLICT WITH NOTE 7C. |
| PLEASE CLARIFY. |
| |
| 3. M2.1 ROOMS 117 AND 119 SHOW TRANSFER JUMPERS FOR |
| RETURN AIR. PROVIDE SIZES FOR FLEX DUCTS TO SHOW |
| COMPLIANCE WITH FBC,M 601.4 EXCEPTION 1. DUCT SIZES ON |
| FLEX SCHEDULE DO NOT MEET THE EXCEPTION REQUIREMENTS. |
| |
| 4. M2.1 ROOM 120 THE DESIGN CFM OF THE DUCTED RETURN |
| (500CFM) IS LESS THAN THAT OF THE SUPPLY (600CFM) PLUS |
| THE TRANSFER RETURN AIR FROM ROOM 119 (80CFM) FOR A |
| TOTAL OF 680CFM TO BE RETURNED. PLEASE SHOW BALANCED |
| RETURN I THIS AREA PER FBC,M 601.4 |
| |
| 5. M0.1 NOTE #20: NO DETAIL FOR ROOF-TO-CURB OR |
| CURB-TO-EQUIPMENT ATTACHMENTS WAS PROVIDED BY |
| STRUCTURAL ENGINEER. SHOW COMPLIANCE WITH WIND LOAD |
| REQUIREMENTS OF FBC 1509, 1522 AND CHAPTER 16. |
| |
| 6. PLEASE SHOW LOCATIONS FOR CONDENSATE DISPOSAL IN |
| COMPLIANCE WITH FBC,M 307.2 AND FBC 1503.6. SECONDARY |
| DRAIN PROTECTION IS ALSO REQUIRED PER FBC,M 307.2.3. IS |
| THIS WHAT IS MEANT ON EQUIPMENT SCHEDULE NOTE #13? |
| |
| 7. GUARDS SHALL BE PROVIDED WHERE EQUIPMENT REQUIRING |
| SERVICE IS LOCATED WITHIN 10 FEET OF ROOF EDGE PER |
| FBC,M 304.10 |
| |
| 8. M7.1 GRAVITY RELIEF HOOD DETAIL: THIS HOOD APPEARS |
| TO BE FOR INKATE PURPOSES BUT IT IS SHOWN ATTACHED TO |
| AN EXHAUST DUCT. THE BACKDRAFT DAMPER AS SHOWN WILL NOT |
| ALLOW AIR TO ENTER THE BUILDING THROUGH THE HOOD. |
| PLEASE CLARIFY. |
| |