2007-06-19 08:16:28 | *** UNSAT 2ND REVIEW *** |
| |
| 1) NOTE: PLEASE SEE PLANS WERE SUBMITTED BACK WITHOUT |
| ANY CORRECTIONS OR CHANGES MADE TO PLANS. THE REQUIRED |
| INFORMATION IS NOT ACCEPTABLE ON LETTERS FROM |
| CONTRACTOR. ALL CHANGES TO PLANS AND INFORMATION NEEDED |
| ARE TO BE ON PLANS AND DONE BY THE ENGINEER OF RECORD. |
| OTHER SUPPORTING DOCUMENTATION SUCH AND MANUFACTURE |
| SPEC/CUT SHEETS OF ALL EQUIPMENT AS PREVIOUSLY |
| REQUESTED IS TO BE ATTACHED. THE SHEETS ATTACHED ARE |
| NOT ALL AS REQUESTED. |
| |
| 2) NOTE: PLEASE SEE THE VALUE FOR THE TOTAL SCOPE OF |
| WORK IS COMING BACK AT $148K WHICH IS ABOUT THE SAME |
| VALUE OF THE PREVIOUS PROJECT AT STORE #50 HOWEVER THE |
| SCOPE VALUE IS HIGHER THAN THAT APPLIED. THIS VALUE IS |
| TO BE FOR ALL, INCLUDING GAS HOOK-UP, EQUIPMENT, AND |
| LABOR ETC. THIS IS TO INCLUDE ALL MATERIALS, EQUIPMENT, |
| DESIGN COST ETC EVEN IF ANY OF THESE ARE OWNER |
| SUPPLIED. |
| PLEASE PROVIDE A COMPLETE LIST AND BREAKDOWN OF ALL |
| ABOVE AND THESE VALUES WILL BE COMPARED TO ADOPTED |
| GUIDES UNDER THE FBC. A VALUE MAY BE ASSESSED BY THIS |
| OFFICE IF AN ACCURATE VALUE IS NOT PROVIDED FOR ALL. |
| FEES ARE DUE AT THIS TIME. PROJECT IS BEING PLACED INTO |
| A HOLD STATUS AND NO OTHER REVIEWS WILL BE DONE UNTIL |
| THESE FEES ARE PAID. IF FEES ARE NOT PAID BY 6/27/07 |
| THE PLANS WILL BE REMOVED FROM THE REVIEW PROCESS |
| COMPLETELY. THESE SHOULD BE PAID UPON REVIEW OF THESE |
| COMMENTS BASED ON THE FIRST INCREASE IN THE AMOUNT OF |
| $1,975.80. PLANS WILL BE RETAINED BY THIS OFFICE AND |
| NOT RELEASED UNTIL FEES ARE PAID.PLEASE KNOW THIS |
| COMMENT HAS BEEN MADE ON SEVERAL PROJECTS FOR THE SAME |
| SCOPE OF WORK AND THE SAME RESPONSE IS MADE WITHOUT ANY |
| CORRECTIONS TO APPLIED WORK. ALL PERMIT APPLICATIONS, |
| PLANS MAY BE RETAINED BY THIS OFFICE FOR REVIEW FROM |
| THE CONTRACTORS LICENSING BOARD. |
| FBC 108.3 |
| |
| 3) NOTE: PLEASE SEE THE PLUMBING REVIEW COMMENTS AS THE |
| GAS INFORMATIONWILL BE REQUIRED IN THE SUBMITTED |
| PACKAGE. |
| |
| |
| ** IMPORTANT** |
| ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| PICKED UP FOR CORRECTIONS, PLEASE BE |
| SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| SHEETS AND ONLY INSERT NEW REVISED |
| SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| AND STAMPING. DO NOT LEAVE ANY |
| OLD/VOIDED SHEETS IN SETS. |
| PLEASE KNOW ONLY ONE SET OF THE |
| OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| FOR REFERENCE. |
| THIS WILL HELP IN THE REVIEW PROCESS AND |
| AVOID ANY DELAYS. |
| |
| ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| REVIEWER. |
| |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW II |
| CONSTRUCTION SERVICES DEPT. |
| CITY OF WEST PALM BEACH |
| 561-805-6717 |
| [email protected] |