2006-10-19 15:39:56 | UNSAT |
| REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1. |
| |
| THE FOLLOWING INFORMATION IS REQUIRED FOR GAS PLAN |
| REVIEW: |
| |
| 1. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| NAME, AND ALSO DATE DRAWING. PLEASE DO |
| THIS PRIOR TO RESUBMITTING. |
| |
| 2. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT (1ST AND 2ND STAGE REGULATORS) TO VERIFY |
| COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2 |
| |
| 3. PLEASE SUBMIT MANUFACTURER CUT SHEETS AND |
| INSTALLATION INSTRUCTIONS OF GENERATOR THAT VERIFY BTU |
| LOAD AND RECOMMENDATION OF MINIMUM CLEARENCES TO |
| STRUCTURES. |
| |
| 4. CLEARLY SHOW THE LOCATION AND CAP- |
| ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| OR ASME), THE DISTANCE OF THE TANK FROM |
| THE BUILDING AND ADJACENT PROPERTY LINES ON TWO COPIES |
| OF SURVEY. |
| THE DISTANCE OF THE TANK FROM ALL SOUR- |
| CES OF IGNITION, OTHER CONTAINERS, BUILD |
| INGS, AND THE LOCATION OF ANY BUILDING |
| OPENINGS BELOW THE RELIEF VALVE OF THE |
| TANK PER NFPA 58, TABLE 3-2.2.2. |
| |
| 5. PROVIDE NOTICE OF COMMENCEMENT RECORDED WITH THE |
| CLERK OF COURT BEFORE A PERMIT CAN BE ISSUED. |
| |
| END OF COMMENTS: |
| |