Date |
Text |
2007-03-28 08:56:04 | *** PROVISO *** |
| 1) PER 2004 FBC, FUEL GAS - POWERED |
| EQUIPMENT - PERMANENTLY INSTALLED |
| EQUIPMENT POWERED BY INTERNAL COMBUSTION |
| ENGINES SHALL BE INSTALLED IN ACCORDANCE |
| WITH MANUFACTURER'S INSTALLATION |
| INSTRUCTIONS AND NFPA 37. |
| |
| NFPA 37 INSTALLATION & USE OF STATIONARY COMBUSTION |
| ENGINES & GAS TURBINES: |
| 4.1.4ENGINES (GENERATORS) LOCATED |
| OUTDOORS SHALL BE MINIMUM OF 5 FT FROM |
| OPENINGS IN WALLS & AT LEAST 5 FT FROM |
| STRUCTURES HAVING COMBUSTIBLE WALLS.A |
| MINIMUM CLEARANCE IS NOT REQUIRED WHEN |
| (1) THE ADJACENT WALL HAS A MINIMUM FIRE RESISTANCE |
| RATING OF 1 HOUR OR (2) THE WEATHERPROOF ENCLOSURE IS |
| CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS, AND IT HAS |
| BEEN DEMONSTRATED THAT A FIRE WITHIN THE |
| ENCLOSURE WILL NOT IGNITE COMBUSTIBLE |
| MATERIALS OUTSIDE THE ENCLOSURE. |
| INFORMATIVE: A.8.2.3.1EXHAUST SYSTEMS |
| SHOULD NOT TERMINATE UNDER STRUCTURES OR |
| WHERE THE EXHAUST MIGHT BE DRAWN INTO |
| THE VENTILATION INTAKES. |
| |
| 2004 FMC 804.3.5 #3, WHERE THE |
| TERMINATION IS LOCATED BELOW AN ADJACENT |
| ROOF STRUCTURE, THE TERMINATION POINT |
| SHALL BE LOCATED AT LEAST 3 FT FROM THE |
| ROOF STRUCTURE. |
| |
| PLEASE NOTE, WHILE ZONING ALLOWS |
| MECHANICAL EQUIPMENT TO ENCROACH 4 FT |
| INTO THE REQUIRED SETBACK, GENERATORS |
| SHALL MAINTAIN THE REQUIRED ABOVE |
| MENTIONED CLEARANCES TO THE ADJACENT |
| PROPERTY STRUCTURES, I.E. FENCE, |
| BUILDING, WINDOWS, DOORS, OR OPENINGS. |
| |
| FOLLOW MANUFACTURER'S RECOMMENDED |
| CLEARANCES AROUND EQUIPMENT FOR |
| SERVICING,AND PROVIDE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS AT THE JOBSITE |
| FOR THE FIELD INSPECTOR. |
| MECHANICAL PLAN REVIEW BY; |
| TOM GORDON (561) 805-6729. |