Date |
Text |
2006-10-31 15:27:24 | |
| COMMENTS FROM REVIEW DATED 10-13-06: |
| |
| COMMENT 1, 2 ,3 |
| |
| COMMENT 4: EF-2 TERMINATION TO THE ROOF IS NOT |
| INDICATED ON PLAN SHEET M-1.2.THIS WAS NOT ADDRESSED. |
| REFERENCED PLAN SHEET WAS REMOVED FROM THE RESUBMITTED |
| PLANS.PLEASE PROVIDE DETAIL OF EQUIPMENT LOCATED ON |
| THE ROOF.PROVIDE DETAIL OF REQUIRED CLEARANCES FROM |
| ROOF SURFACE, FRESH AIR INTAKE IN RELATION TO EXHAUST |
| TERMINATIONS, AS WELL AS CLEARANCES FOR THE GREASE DUCT |
| TERMINATION TO PROPERTY LINES, CONTINGUOUS BUILDINGS |
| ETC.2004 FMC 506.3.12.3. |
| |
| COMMENT 5 WAS NOT ADDRESSED.PLAN SHEET M-1 INDICATES |
| EF-2 (WHICH THE LOCATION OR TERMINATION IS NOT |
| INDICATED ON THE PLAN). IS THIS A GRILLE AT THE |
| CEILING?A HOOD IS NOT SHOWN OVER THE OVEN.PLEASE |
| INDICATE WHAT TYPE OF "OVEN" THIS IS.PLEASE |
| REFERENCE 2004 FMC 507.2.1, TYPE I HOOD SHALL BE |
| INSTALLED WHERE COOKING APPLIANCES PRODUCE GREASE OR |
| SMOKE, SUCH AS OCCURS WITH GRIDDLES, FRYERS, BOILERS, |
| OVENS, RANGES, AND WOK RANGES.A TYPE II HOOD IS SHALL |
| BE INSTALLED WHERE COOKING OR DISHWASHING APPLIANCES |
| THAT PRODUCE HEAT OR STEAM AND DO NOT PRODUCE GREASE OR |
| SMOKE, SUCH AS STEAMERS, KETTLES, PASTA COOKERS & |
| DISHWASHING MACHINES.PLEASE CLARIFY.PLEASE PROVIDE |
| MANUFACTURER'S SUBMITTAL FOR THE OVEN. |
| |
| COMMENT6 WAS NOT ADDRESSED.(PLAN SHEET M-1.2 WAS |
| REMOVED FROM SUBMITTAL SET)PLAN SHEET M-1.2 APPEARS |
| TO HAVE A WALL THAT TERMINATES ABOVE THE ROOF THAT |
| SEPARATES RTU-1 & EF-1. PER 2004 FMC 306.5, ACCESS |
| SHALL NOT REQUIRE CLIMBING OVER OBSTRUCTIONS GREATER |
| THAN 30 INCHES.PLEASE NOTE, SHOULD ROOF HAVE A SLOPE |
| GREATER THAN 4/14 PITCH SHOW COMPLIANCE WITH 306.5 |
| ITEMS 1 THROUGH 7. |
| |
| COMMENT 7 WAS NOT ADDRESSED.PLEASE INDICATE ACCESS TO |
| ROOF. |
| |
| COMMENT8 WAS NOT ADDRESSED.PLEASE CLARIFY WHAT |
| EQUIPMENTTHE20"X48" RETURN AIR DUCT & 20"X32" |
| SUPPLY DUCT TERMINATING ON THE ROOF GO TO (RTU-1?) |
| |
| COMMENT 9 WAS NOT ADDRESSED.ADDITIONAL PERMITS |
| REQUIRED FOR HOOD, FIRE SUPPRESSION, & WALK-IN COOLER. |
| PLEASE PROVIDE PLANS AND MANUFACTURER'S SUBMITTAL DATA |
| WITH PERMIT APPLICATION. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT PATTY KRAUSS |
| AT (561)805-6719 OR E-MAIL [email protected]. |
| |
| |
| |
| |
| PLEASE NOTE, FAN SCHEDULE ON PLAN SHEET M-1 SHOWS EF-1 |
| AS A COOKING LINE HOOD FAN BUT THE PLAN INDICATES EF-1 |
| IN THE RESTROOM |
| |
| PLEASE NOTE, GREASE DUCT ENCLOSURE OR SHAFT SHALL NOT |
| ENCLOSE ANY OTHER DUCT SYSTEMS PER NFPA 96-01 SECTION |
| 7.7.5.2. |