Date |
Text |
2006-08-17 00:00:00 | ******DENIED****** |
| REFERENCE: FBC-2004 FUEL GAS |
| |
| THE FOLLOWING INFORMATION IS REQUIRED ON |
| THE ISOMETRIC DRAWING FOR GAS PLAN |
| REVIEW. NOTE: THE CORRECTIONS ARE |
| INDICATED IN RED INK: |
| |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| AND CORRESPONDING LENGTHS PER FBC-2004 |
| FUEL GAS CODE. |
| 2. SHOW TYPE OF PIPING MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE BEING USED. |
| 3. TYPE OF GAS, (LP OR NATURAL) PLEASE |
| INDICATE ON DRAWING. |
| 4. INDICATE THE DELIVERY PRESSURE (PSI) |
| PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| NATURAL GAS SPECIFY .5 PSI, 2 PSI OR |
| PROPANE 10 PSI. |
| 5. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND THE |
| FBC-2004 FUEL GAS CODE SEC 402.2. (NOTE: |
| PLEASE SUBMIT MANUFACTURER CUT SHEETS ON |
| GENERATOR OR REFERENCE GEN/RES MASTER |
| NUMBER. IF THE SYSTEM IS A 2LB SYSTEM OR |
| GREATER PLEASE SUBMIT MANUFACTURER CUT |
| SHEETS OF THE REGULATORS.) |
| |
| **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN |
| RESUBMITTING, PLEASE REPLACE ONLY SHEETS |
| WHICH HAVE CHANGED AND PROVIDE ONE COPY |
| OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| ONLY. NOTE: ONLY ONE CORRECTED DRAWING |
| IN RED INK FOR REFERENCE FOR |
| RESUBMITTAL. |
| |
| END OF COMMENTS: |
| |
| REVIEW BY MIKE PERSON |
| (561) 805-6730 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |
| UNDER SUPERVISION OF K.STEVENS |
| (561) 805-6721 |
| |
| |
| |
| |
| |
| |
| |