2006-08-23 00:00:00 | |
| |
| |
| 1)FAC. 61G15-23.002 A PROFESSIONAL |
| ENGINEER SHALL SIGN HIS NAME AND AFFIX |
| HIS SEAL TO ALL |
| PLANS,SPECIFICATIONS,REPORTS,FINAL BID |
| DOCUMENTS PROVIDED TO THE OWNER OR THE |
| OWNER'S REPRESENTATIVE, OR OTHER |
| DOCUMENTS PREPARED OR ISSUED BY SAID |
| REGISTRANT AND BEIG FILED FOR PUBLIC |
| RECORD. THE DATE THAT THE SIGNATURE AND |
| SEAL IS AFFIXED AS PROVIDED HEREIN SHALL |
| BE ENTERED ON SAID PLANS, |
| SPECIFICATTIONS,REPORTS,OR OTHER |
| DOCUMENTS IMMEDIATELY UNDER THE |
| SIGNATURE OF THE PROFESSIONAL ENGINEER. |
| |
| 2) SUBMIT AN ELEVATION DETAIL DRAWING |
| SHOWING THE AREA OF THE WORK. INDICATE |
| ALL MATERIALS WHICH WILL BE USED TO |
| RREPAIR THE WALL. SHOW THE WINDOW HEADER |
| DETAIL,FRAMING DETAIL AND INDICATE ON |
| THE DRAWINGS WHICH TWO WINDOWS WILL BE |
| WORKED ON. WILL THESE WINDOWS BE |
| REPLACED WITH NEW WINDOWS OR THE |
| ORIGINAL WINDOWS WILL BE RE-USED?.IF NEW |
| WINDOWS ARE BEING INSTALLED, SUBMIT THE |
| PRODUCT APPROVALS FOR THOSE WINDOWS |
| |
| 3) STATE THE SQUARE FOOTAGE FOR THE |
| PROJECT ON THE APPLICATION. |
| |
| MYRON JACOBS |
| BUILDING PLAN REVIEWER |
| TEL:(561)805-6726 |