2007-06-04 21:09:29** UNSAT 3RD REVIEW **
  
 *** PLEASE SEE THERE ARE SOME EXISTING COMMENTS WHICH
 ARE STILL IN NEED OF ADDRESSING ALONG WITH SOME NEW
 COMMENTS BASED ON REVISED PLANS SUBMITTED AND SOME
 ITEMS BEING SUBMITTED FOR THE FIRST TIME FOR REVIEW.
  
 1) NOTE:PLEASE CLARIFY WHY THE CODES ON E1.01 WERE
 UPDATE TO THE 2005 NEC AND 2004 FBC W/ 2006 REVISIONS?
 THE TITLE BLOCK MENTIONS THIS WAS DONE PER BLDG
 DEPARTMENT COMMENTS; HOWEVER THERE WERE COMMENTS FROM
 THIS REVIEWER ON EITHER OF THE TWO PREVIOUS REVIEWS
 WHICH REQUESTED THE CODES TO BE CHANGED. PLEASE SEE ANY
 NOTES FROM PREVIOUS REVIEW WHICH REFERENCE CODE YEARS,
 REFERENCED THE 2002 NEC.
 PLEASE KNOW THAT ALL PERMITS APPLIED FOR BEFORE
 DECEMBER 8TH, 2006 PLACES PROJECTS UNDER THE 2004 FBC
 W/2005 REVISIONS AND THE 2002 NFPA-70 (NEC).
  
 2) NOTE: PLEASE SEE PREVIOUS NOTE WITH RESPECT TO THE
 ENERGY CALCULATIONS WHICH REQUESTED THE SIGNATURE OF
 THE OWNER AGENT( CONTRACTOR) AS STATED ON ENERGY
 CALCULATIONS. THESE WERE SUBMITTED WITHOUT SIGNATURES.
  
 ** PLEASE SEE THE ENERGY CALCULATIONS SUBMITTED ARE NOT
 FROM THE CORRECT VERSION ADOPTED BY THE FBC FOR THIS
 PERMIT. THE ENERGY CALCULATIONS EVEN STATE THEY ARE
 ONLY EFFECTIVE AFTER DECEMBER 8TH, 2006.
 PLEASE SEE THAT ALL PERMITS ONCE AGAIN APPLIED BEFORE
 THIS DATE PLACES VERSIONS UNDER THE 2004 FBC W/2005
 REVISIONS. ( VERSION FOR ENERGY CALCULATIONS 2.1?)
 PLEASE SEE THE ENERGY CALCULATIONS SUBMITTED NEED TO
 CORRELATE WITH THE ELECTRICAL LIGHTING ON PLANS. PLEASE
 SEE THE PLANS DO INDICATE EXTERIOR LIGHTING, HOWEVER
 THE ENERGY CALCULATIONSDO NOT INCLUDE ANY EXTERIOR
 LIGHTING ENTERED IN THE SUMMARY/LIGHTINGPERFORMANCE
 OR INPUT DATA REPORT.
 PLEASE REVISE AND ADJUST ALL ENERGY CALCULATIONSPER
 13-103.1.1.1, 13-415.1.AB.1.1, 13-415.2
  
 3) NOTE: PLEASE SEE THE TWO PREVIOUS REVIEWS REQUESTED
 PHOTO-METRICS TO VERIFY CODE COMPLIANCE FOR EXIT PATHS
 AND STAIRS. PLEASE SEE THE PLANS WERE REVISED TO
 INCREASE LIGHTING FIXTURES, HOWEVER THE RESPONSE LETTER
 MENTIONS TO SEE THE PHOTO-METRICS ATTACHED, YET NONE
 COULD BE LOCATED AS PART OF THE DESIGNERS SUBMITTED
 PLANS OR ATTACHED SHEETS.
 PLEASE SEE LS 101 2003, 7.8.1.3, 7.9.2.2.
 AS NONE WERE SUBMITTED, REVIEW CAN NOT BE
 ACCOMPLISHED.
  
 4) NOTE: PLEASE SEE THIS IS THE FIRST REVIEW WHERE
 SPECS/CUT SHEETS FOR ATS/ GENERATOR WAS SUBMITTED FOR
 REVIEW. PLEASE CLARIFY THEATS DEVICES IF THEY ARE
 3-POLE OR 4-POLE. AS THE SHEETS ONLY INDICATE ORDERING
 METHOD FOR TYPE AND THE PLANS ONLY INDICATE 3-PHASE AND
 4-WIRE.
 IF SD SYSTEMS, RISER WOULD NEED TO COMPLY WITH 250.20,
 250.50 ETC.
  
 5) NOTE: PLEASE SEE PLANS SEEM TO MENTIONS THE
 GENERATOR BUILDING AS INDEED A SEPARATE *BUILDING*?
 PLEASE SEE 225.31, AND 250.32 FOR THIS IS A SEPARATE
 BUILDING/STRUCTURE, THEN GROUNDING AT THIS BUILDING
 WOULD BE SHOWN AND A DISCONNECTING MEANS IN PANEL GR.
 PLEASE SEE THE FOLLOWING NOTE FOR MORE CLARIFY FOR THE
 GR PANEL.
  
 6) NOTE: PLEASE SEE PREVIOUS COMMENTS SPOKE OF CIRCUITS
 FOR COMMON AREAS.(MAIN ELECTRICAL ROOM, GENERATOR ROOM,
 OUTSIDE LIGHTING, ROOFTOP RECEPTS)ETC. BRANCH CIRCUITS
 WHICHARE SHOWN COMING FROM TENANT SERVICES WHICH IS
 NOT PERMITTED.
 (EXAMPLE, ROOFTOP BRANCH CIRCUIT FOR WP RECEPTACLES
 TRIPS, HOWEVER THE ONLY ACCESS TO THE OCP/BREAKER IS TO
 THE SECOND FLOOR TENANT WHICH IS NOT ACCESSIBLE TO
 ANYONE)
 PLEASE SEE THE RISER SHOWS CIRCUITS IN THE MAIN
 ELECTRICAL ROOM TO THE PANEL P1 WHICH IN THE PANEL
 SCHEDULE THESE SAME CIRCUITS ARE BLANK?
 PLEASE SEE THERE IS NO PANEL SCHEDULE FOR PANEL GR AND
 YET THE CIRCUITS WHICH ARE SHOWN ON PANEL P1 ACTUALLY
 ARE LABELED TO FEED THE CIRCUITS IN THE GENERATOR ROOM
 WHICH INDICATE CIRCUITS TO A GR PANEL? THIS IS
 CONFUSING AND NOT CLEAR WHAT IS BEING PROPOSED.
 PLEASE ALSO SEE THE LIGHTING ON THE EXTERIOR OF
 BUILDING AND STAIRS INDICATES CIRCUITS TO A PANEL GP
 WHICH IS NOT ON RISER AND NO PANEL WAS SCHEDULE
 SUBMITTED ETC?? PLEASE CLARIFY WHERE THESE ARE BEING
 FED FROM?
 240.24, 210.25 FBC 106.1.2, 106.3.5.1.2, 215.5, FBC
 106.1.2, 106.3.5.1.2, 106.4
  
 7) NOTE: PLEASE SEE THE RISER SHOWS THE NEW PANEL GR
 BEING *TAPPED* FROM A DISCONNECT YET THE EQUIPMENT
 COORDINATION SCHEDULE SHOWS THIS BEING *TAPPED* FROM
 THE ATS-1?
 PLEASE ALSO SEE 240.21 FOR THE TAPPED CONDUCTOR
 LIMITS.
 PLEASE SEE THAT BESIDE THE LENGTH NOT PERMITTED ANY
 TAPPED CONDUCTORS MUST TERMINATE IN OVER CURRENT
 PROTECTION AND AS NO PANEL GR SCHEDULE WAS SUBMITTED NO
 VERIFICATION FOR MCB AND OCP CAN BE VERIFIED.
 PLEASE KNOW THERE ARE SEVERAL QUESTIONS ON NOTES 5, 6
 AND 7.
  
 8) NOTE: PLEASE SEE THE RISER SHOWS *EQUIPMENT
 GROUNDING CONDUCTORS* FROM THE METER TO THE FIRST MEANS
 OF DISCONNECT WHICH IS NOT PERMITTED. 250.6, 250.24
 (THIS WOULD HAVE BEEN REDLINED IF PLANS WERE NOT COMING
 BACK FOR OTHER COMMENTS.
  
 9) NOTE: PLEASE SEE 620.22 AND CLARIFY THE SEPARATE
 BRANCH CIRCUITS FOR ELEVATOR CAB LIGHTS. IF TAPPED,
 PLEASE INDICATE THE CONDUCTORS AND OCP AT TERMINATION.
 (RISER AND EQUIPMENT SCHEDULE INDICATE 3-POLE FOR
 LIGHTING??
 240.4, 240.21, 310.16.
  
 10) NOTE: PLEASE CLARIFY THE 225AMP BREAKER IN PANEL M2
 IS FEEDING THE 200AMP RATED DISCONNECT FOR THE
 ELEVATOR. THE RESPONSE MENTIONS THIS IS TO AVOID *FALSE
 TRIPPING*? THIS IS NOT CLEAR WHEN THE DISCONNECT IS
 200AMPS AND THE TAPS FOR WHAT APPEARS TO BE THE
 ELEVATOR CAB LIGHTS IS IN QUESTION PER NOTE #9.
  
 11) NOTE: PLEASE SEE PREVIOUS REVIEW REQUESTED FOR ANY
 OLD/VOIDED SHEETS TO BE SUBMITTED BACK FOR REFERENCE
 YET NONE WERE SUBMITTED?
 PLEASE SEE THAT THE SAME NOTE WILL APPLY FOR THE
 FOLLOWING REVIEW.
  
 * ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved