Date |
Text |
2006-12-13 15:31:02 | ********2ND PLAN CHECK ONLY******* |
| |
| |
| 1.PLEASE PROVIDE ENERGY CALCULATIONS IN ACCORDANCE |
| WITH 2004 FBC CHAPTER 13 SECTION 13-101.1.3. |
| |
| 2.PLEASE PROVIDE ANCHORING DETAILS FOR THE CURBS TO |
| THE ROOF DECK.PLEASE NOTE CURBS SHALL BE A MINIMUM OF |
| 8"ABOVE THE ROOF SURFACE PER 2004 FBC 1509.7. |
| |
| 3.EQUIPMENT STANDS LOCATED ON THE ROOF IN WHICH THE |
| ROOFING MATERIAL IS REQUIRED UNDER THE STAND, THE |
| CLEARANCE REQUIRED BETWEEN THE ROOF SURFACE AND THE |
| BOTTOM OF THE SUPPORT RAIL SHALL BE IN ACCORDANCE WITH |
| 2004 FBC TABLE 1509.7.PLEASE NOTE, PRODUCT APPROVALS |
| REQUIRED FOR EQUIPMENT STANDS LOCATED ON THE ROOF. |
| |
| 4.PLAN SHEET M2 OUTSIDE AIR IS INDICATED ON THE |
| ROOFTOP UNIT SCHEDULE.PLEASE INDICATE OUTSIDE AIR |
| CALCULATIONS IN ACCORDANCE WITH 2004 FMC TABLE 403.3. |
| |
| 5.PLAN SHEET M2 ROOFTOP UNIT SCHEDULE DOES NOT |
| INDICATE DUCT SMOKE DETECTOR ON UNITS 1,2, 9, 11 & 12. |
| PER 2004 FMC 606.2.1 SMOKE DETECTORS SHALL BE INSTALLED |
| INSUPPLY AIR SYSTEMS WITH A DESIGN CAPACITY GREATER |
| THAN 2,000 CFM.WHERE MULTIPLE AIR HANDLING SYSTEMS |
| WHERE THE AGGREGATE AIR IS GREATER THAN 2,000 CFM, DUCT |
| SMOKE DETECTORS WILL BE REQUIRED IN ALL UNITS |
| REGARDLESS OF THE THE CAPACITY, 2004 FMC 606.2.2. |
| |
| PLEASE NOTE, ADDITIONAL PERMITS & PLANS REQUIRED FOR |
| THE HOOD, GREASE DUCT & FIRE SUPPRESSION. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT PATTY KRAUSS |
| AT (561)805-6719 OR E-MAIL [email protected]. |
| |
| |
| |
| |