Plan Review Notes
Plan Review Notes For Permit 06070492
Permit Number 06070492
Review Stop B
Sequence Number 3
Notes
Date Text
2006-08-22 00:00:00BUILDING REVIEW 3RD CHECKLIST:
  
 TRUSS PACKAGE:
 1- ENGINEER TO PROVIDE ALL HIS
 INFORMATION IN ALL DWGS AS REQ'D BY
 CHAPTER 471 FL. ST. & SEC. 61G15-23.002
 OF FLORIDA ADMINISTRATIVE CODE.
  
 ***NO DONE.
  
 2- ALL ENGINEER DRAWINGS AND LETTERS
 NEED TO BE SIGNED AND SEALED AS REQUIRED
 BY CHAPTER 471 FL. ST. AND 61G15-23.002,
 INCLUDING ALL GENERAL NOTES AND GENERAL
 DETAILS.
  
 ***NO DONE.
  
 3- A) GENERAL DETAILS NEED TO BE
 UPDATED. FBC 2004 CALLS FOR ASCE 7-02,
 NOT ASCE 7-98. ENGINEER TO UPDATE ALL
 DRAWINGS.
  
 ***NO DONE.
  
 B) PROVIDE ONLY THE DETAILS THAT
 APPLY TO THIS JOB. PLEASE, DON'T PROVIDE
 UNNECESSARY INFORMATION TO EXPEDITE THE
 REVIEW PROCESS.
  
 ***OK.
  
 4- DESIGN LOADS SHOWN IN TRUSS LAYOUT,
 ENGINEERED TRUSS AND GENERAL DRAWINGS
 NEED TO MATCH. REVISE AS REQUIRED.
  
  
 ***NO DONE.
  
 5- SPECIFY ROOF SHEATHING NAILING. SEE
 TABLE 2304.9.1 FBC 2004.
  
 ***OK.
  
 6- SPECIFY TRUSS TO WALL CONNECTORS AND
 PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL AS REQUIRED BY RULE 9B-72. GO
 TO WWW.FLORIDABUILDING.ORG TO DOWNLOAD
 PRODUCT APPROVALS.
  
 *** DRAWING 11A BY THE ENGINEER JOHN
 HOLT AND TRUSS LAYOUT DON'T MATCH. TRUSS
 LAYOUT CALLS FOR RAKED BEAM, WHILE
 DRAWING 11A CALLS FOR GABLE END TRUSS.
 THERE IS NOT GABLE END TRUSS. ENGINEER
 DRAWING 11A AND TRUSS DRAWINGS TO MATCH.
 ***NOTE: MAKE SURE DRAWING 11A IS
 LEGIBLE.
  
 7- ROOF PITH OF 2.5:12 REQUIRES 2 LAYERS
 OF UNDERLAYMENT. SEC. 1507.2.2 FBC 2004.
  
 ***OK.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712