Plan Review Notes
Plan Review Notes For Permit 06061475
Permit Number 06061475
Review Stop E
Sequence Number 4
Notes
Date Text
2007-04-08 10:10:06** UNSAT **
  
 1) NOTE: PLEASE SEE THAT NOT ALL SHEETS ARE SIGNED,
 DATED AND SEALED BY THE ENGINEER OF RECORD.
 FS 471.025, FAC 61G15-23.002
  
 2) NOTE: PLEASE SEE THE PLANS WERE ISSUED FOR PERMIT
 WITH *NOTES REDLINED* AND ATTACHED TO PLANS. PLEASE SEE
 TO DATE THAT NO DOCUMENTATION AHS BEEN VERIFIED FOR
 COMPLIANCE TO MEET THE EXCEPTIONS OF THE NEC FOR
 DISCONNECTING MEANS ETC AS PREVIOUSLY GONE OVER FOR THE
 DETACHED BUILDING.
 PLEASE SEE 225.31-225.398
 PLEASE SEE THE NOTES BELOW ARE TAKEN FROM THE ISSUED
 PLANS AND PERMITS FOR SCOPE OF WORK.
 PLEASE PROVIDE COMPLETED DOCUMENTATION FOR EXCEPTION OF
 *SAFE PROCEDURES*, *QUALIFIED PERSONNEL* ON-SITE 24/7
 ETC, PAPERWORK AND DOCUMENTATION MUST BE ORIGINAL,
 SIGNED, AND NOTARIZED.
 IF THIS IS NOT MET THEN PLANS AS ORIGINALLY NOTED WILL
 NEED TO BE REVISED TO MEET NEC CODE COMPLIANCE.
  
 3) NOTE: PLEASE ALSO SEE THAT AS TO DATE OUR RECORDS DO
 NOT INDICATE ANY LOW VOLTAGE PERMIT WHICH HAS BEEN
 APPLIED FOR OR ISSUED FOR THIS PROJECT.
 PLEASE SEE NOTES REDLINED ON PLANS WHICH MENTION THIS
 IS TO BE UNDER A SEPARATE PERMIT.
  
  
  
 ************** NOTES REDLINED*******
  
 *** LOW VOLTAGE WIRING UNDER A SEPARATE PERMIT.
  
  
 **** 1) NOTE: PLEASE KNOW UPON READING RESPONSE FROM
 DESIGN TEAM, THIS OFFICE IS WELL AWARE THAT THE
 STRUCTURE MAY BE FED WITH OTHER SYSTEMS AS LISTED IN
 225.30.PLEASE SEE PREVIOUS NOTES WHICH WAS WITH
 RESPECT TO DISCONNECTING MEANS REQUIRED ETC. PLEASE SEE
 THE FOLLOWING EXCEPTION WHICH IS TAKEN DIRECTLY FROM
 THE NEC WILL BE REQUIRED TO BE VERIFIED ON SITE.THIS
 WAS RED-LINED ON E-5.
 "EXCEPTION NO. 1: FOR INSTALLATIONS UNDER SINGLE
 MANAGEMENT, WHERE DOCUMENTED SAFE SWITCHING PROCEDURES
 ARE ESTABLISHED AND MAINTAINED FOR DISCONNECTION, AND
 WHERE THE INSTALLATION IS MONITORED BY "QUALIFIED
 INDIVIDUALS", THE DISCONNECTING MEANS SHALL BE
 PERMITTED TO BE LOCATED ELSEWHERE ON THE PREMISES "
  
 ** PLEASE SEE NEC ART: 100 FOR*QUALIFIED PERSON*. ONE
 WHO HAS SKILLS AND KNOWLEDGE RELATED TO THE
 CONSTRUCTION AND OPERATION OF THE ELECTRICAL EQUIPMENT
 AND INSTALLATIONS AND HAS RECEIVED SAFETY TRAINING ON
 THE HAZARDS INVOLVED.
 EXCERPT FROM HANDBOOK:
 "NEW IN THE 2002 EDITION, THE DEFINITION OF THE TERM
 QUALIFIED PERSON NOW INCLUDES SAFETY TRAINING. NO
 LONGER IS IT ADEQUATE FOR AN ELECTRICAL WORKER TO BE
 *FAMILIAR WITH THE HAZARDS INVOLVED*; THE ELECTRICAL
 WORKER OF TODAY MUST ALSO HAVE SAFETY TRAINING ON THE
 HAZARDS INVOLVED. "
  
 ** PLEASE KNOW THESE QUALIFIED PERSON(S) SHALL BE
 VERIFIED EMPLOYED BY AND ON SITE 24/7, IF THIS CAN NOT
 BE VERIFIED, ELECTRICAL INSTALLATION AS SHOWN MAY NEED
 TO BE ADJUSTED TO MEET CODE.
 THIS PLANS EXAMINER CAN NOT VERIFY AND WILL BE THE
 RESPONSIBILITY OF THE ENGINEERING / DESIGN TEAM,
 LICENSED ELECTRICAL CONTRACTOR AND ELECTRICAL
 INSPECTOR.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved