Date |
Text |
2006-09-06 00:00:00 | |
| |
| DENIED |
| |
| PREVIOUS REVIEW NOTES NOT ADDRESSED: |
| |
| 1) SCOPE OF WORK HARD TO DISCERN. IS NEW |
| LAUNDRY AREA ONLY ACCESSABLE FROM |
| OUTSIDE? DOES NEW INTERIOR FRAMED WALLS |
| HAVE A WINDOW IN THEM? IS EXISTING DOOR |
| OPENING A DOUBLE DOOR? A DRAWING WITH |
| MORE CLARITY IS REQUIRED TO ACCOMPLISH |
| REQUIRED PLAN REVIEW |
| |
| PLEASE COORDINATE DRAWINGS, WHAT |
| RELATIONSHIP DO THE 2 DRAWINGS HAVE WITH |
| EACH OTHER? ONE HAS EXISTING WALL AS |
| 7'-6" WITH A 24"X50" WINDOW OPENING THE |
| OTHER IS 12'-0" WITH A DOUBLE 3'-0" SET |
| OF DOORS AND A 60"X50" WINDOW. PLAN VIEW |
| DOES NOT SHOW ANY WALLS THAT ARE 12'-0" |
| |
| 2) DETAIL SHOWS DOOR AND WINDOW TOGETHER |
| IS POST BETWEEN STRUCTURAL? WHAT IS IT'S |
| MAKE UP (DOUBLE 2X ?)AND HOW IS IT |
| ATTACHED TO THE BEAM AND FLOOR SYSTEM |
| |
| DRAWINGS ARE REQUIRED TO BE CORRECTED |
| THE NOTATIONS ON REVIEW REPORT IS NOT A |
| CORRECTION |
| |
| 4)A DETAIL IS REQUIRED ON PATCH FOR |
| EXISTING WINDOW OPENING TO BE FILLED |
| |
| DRAWINGS ARE REQUIRED TO BE CORRECTED |
| THE NOTATIONS ON REVIEW REPORT IS NOT A |
| CORRECTION |
| |
| 5) IS INTERIOR POST STRUCTURAL? IF SO |
| WHAT FRAMING WILL REPLACE IT? |
| |
| DRAWINGS ARE REQUIRED TO BE CORRECTED |
| THE NOTATIONS ON REVIEW REPORT IS NOT A |
| CORRECTION. ENGINEER OF RECORD SHOULD BE |
| AWARE OF ALL CHANGES TO DETAILS |
| |
| PLEASE NOTE THAT ENGINEERING SHALL MEET |
| ALL THE REQUIREMENTS OF THE FLORIDA |
| STATUTES: |
| |
| AN ENGINEER PRACTICING THROUGH A DULY |
| AUTHORIZED ENGINEERING BUSINESS SHALL |
| INDICATE THEIR NAME AND LICENCE #, AS |
| WELL AS THE NAME,ADDRESS AND CERTIFICATE |
| OF AUTHORIZATION #ON EACH SHEET PER |
| 61G15-23.002 (2) FAC |
| |
| ENGINEERS SEAL,SIGNATURE AND DATE ARE ON |
| THE BLANK SHEET(BACK OF DRAWING) |
| SUCH SIGNATURE, DATE, AND SEAL SHALL BE |
| EVIDENCE OF THE AUTHENTICITY OF THAT TO |
| WHICH THEY ARE AFFIXED FS 471.O25(1) |
| |
| BLDG PLAN REVIEW |
| ADRIAN MORSE |
| 561-805-6716 |