Date |
Text |
2006-07-01 00:00:00 | PAUL SCHMITZ |
| [email protected] |
| FBC 2004 PLUMBING CODE PLAN REVIEW |
| FBC2004 FUEL GAS CODEPLAN REVIEW |
| FBC 2004 CH 11, FL ACESSIBILITY CODE |
| AMENDMENTS TO THE FLORIDA BUILDING CODE |
| CHAPT.1, ADMINISTRATION, 2004 EDITION |
| |
| UNSAT |
| |
| 1) SHT 2. DEMOLITION |
| SEC 704.5DEAD ENDS.IN THE INSTALLATION |
| OR REMOVAL OF ANY PART OF THE DRAINAGE |
| SYSTEM, DEAD ENDS SHALL BE PROHIBITED. |
| |
| 2) SHT 3. SEC 403.1MINIMUM NUMBER OF |
| PLUMBING FIXTURES SHALL BE PROVIDED FOR |
| THEOCCUPANT LOAD BASED ON TABLE 403.1 |
| |
| 3) SHT 3.SEC 410.1 DRINKING FOUNTAIN |
| REQUIRED. BOTTLED WATER DISPENSER SHALL |
| BE PERMITTED, FOR NOT MORE THAN 50% OF |
| REQUIRED DRINKING FOUNTAINS. |
| |
| 4) SHT 3. SEC 11-4.1.3 PRIVATE TOILET |
| ROOM FOR THE OCCUPANT OF A PRIVATE |
| OFFICE, SHALL BE ADAPTABLE. |
| |
| 5) SHT 3 SEC 11-4.22, UNISEX TOILET |
| ROOM, EACH PUBLIC AND COMMON USE TOILET |
| ROOM SHALL COMPLY WITH SEC 11-4.1.3 |
| |
| 6) SHT 5. ROOF PLAN: SEC 1106 PROVIDE |
| THE CALCULATIONS FOR THE PRIMARY AND |
| SECONDARY ROOF DRAINAGE. |
| TABLE 1106.2,1106.3 AND 1106.7 |
| PROVIDE AN ISOMETRIC DRAWING ALL PIPE |
| SIZES. INCLUDE POINT OF DISPOSAL. |
| |
| 7) SHT 19 SEC 606.1 (4) FULLY OPEN |
| VALVES SHALL BE INSTALLEDON THE TOP OF |
| EVERY WATER DOWN FEED PIPE. |
| |
| END OF COMMENTS QUESTIONS 561-805-6692 |