Date |
Text |
2006-05-04 00:00:00 | DENIED |
| REFERENCE: FBC-2004 PLUMBING |
| |
| FOUNDATION PLUMBING PERMIT |
| |
| FROM THE PREVIOUS REVIEW: COMMENT |
| NUMBERS SHALL REMAIN THE SAME AS FIRST |
| REVIEW: |
| |
| 2. SUBMIT A STORM RISER DIAGRAM THAT |
| REFLECT THE PIPING SHOWN ON SHT P-10 AND |
| ALL RWL RISERS. SHOW ALL PIPE SIZES, |
| SLOPE OF PIPE ETC. SECTION 106.1.5.1.3. |
| ***RESPONSE NOTED, BUT NO STORM RISER |
| DIAGRAM FOR THE BUILDING STORM DRAIN OR |
| THE VERTICAL RISERS HAS BEEN SUBMITTED. |
| |
| 3. SHT P-15 GREASE WASTE ISOMETRIC |
| DIAGRAM RISER FLOOR SINK REQUIRED AT P/5 |
| DOWNSTREAM OF HUB DRAIN TO REFLECT THE |
| FLOOR PLAN. SECTION 106.1.1. |
| ***RESPONSE NOTED, BUT THE RISER DIAGRAM |
| HAS NOT BEEN CHANGED AS REQUESTED. THE |
| HUB DRAIN UPSTREAM HAS BEEN CHANGED TO A |
| FUNNEL FLOOR DRAIN WHICH IS NOT |
| APPROVED, AND THERE IS A HORIZONTAL DRY |
| VENT WHICH IS NOT APPROVED. SECTIONS |
| 802.3, 802.3.2, 905.3, & 905.4. |
| |
| 4. SEE COMMENTS 5, 7, 9, 15, 17, 18, 19, |
| AND 31 FROM SECOND REVIEW OF BUILDING |
| PERMIT APPLICATION FOR ISSUES THAT MAY |
| AFFECT THE PIPING IN THE FIRST FLOOR |
| SLAB. |
| (THIS COMMENT WILL BE ATTACHED TO PLANS |
| AS A PROVISO WHEN PERMIT IS ISSUED). |
| |
| 5. SECTION 105.13 THE HOLDER OF A PHASED |
| PERMIT FOR THE FOUNDATION OR OTHER PARTS |
| OF A BUILDING OR STRUCTURE SHALL PROCEED |
| AT THE HOLDER'S OWN RISK WITH THE |
| BUILDING OPERATION AND WITHOUT ASSURANCE |
| THAT A PERMIT FOR THE ENTIRE STRUCTURE |
| WILL BE GRANTED. CORRECTIONS MAY BE |
| REQUIRED TO MEET THE REQUIREMENTS OF THE |
| TECHNICAL CODES. |
| (THIS COMMENT WILL BE ATTACHED TO THE |
| PLANS WHEN THE PERMIT IS ISSUED). |
| |
| **************NEW COMMENT*************** |
| |
| 1B. PLEASE SEE ATTACHED SHEET CONCERNING |
| THE DESIGN PROFESSIONAL AND FS |
| 553..80(2)(B). |
| |
| REVIEW BY KEN STEVENS |
| (561) 805-6721 |
| FAX (561) 805-6731 |
| E-MAIL [email protected] |
| |
| |