Date |
Text |
2006-08-24 00:00:00 | DENIED; |
| 1.ADA DETAIL FOR PHASE 11 ON PAGE A-2 |
| ONLY SHOWS A DETAIL OF THE LAVATORY. |
| DETAIL OF THE WHOLE BATHROOM IS REQUIRED |
| SHOW THE TOILET, SHOWER, AND LAVATORY IN |
| DETAIL. REQUIREMENTS FOR COMPLIANCE CAN |
| BE FOUND, FBC-2004 CHAPTER 11; TOILET, |
| 11-4.16.1 THRU 11-4.16.6; LAVATORY |
| SECTIONS 11-4.19.1 THRU 11-4.19.6; |
| SHOWER SECTIONS 11-4.21.1 THRU |
| 11-4.21.8. |
| 2.HOT WATER REQUIRED TO SERVICE SINK. |
| (SHOW ON PLAN) SHOW LOCATION OF WATER |
| HEATER, OR WATER HEATERS, SIZE AND FUEL |
| SOURCE. |
| 3.SANITARY RISER DIAGRAM; |
| A)TRENCH DRAIN AND FLOOR DRAIN SHALL |
| NOT BE DOUBLE TRAPPED. SEC 1002.1 |
| B)WHAT IS THE 4" VERTICAL DRAIN AND |
| BACK WATER VALVE FOR? NEED MORE |
| INFORMATION) |
| C)WHY IS A FLOOR DRAIN NEEDED IN THE |
| FUTURE PAINT BOOTH? (SECOND REQUEST) |
| 4.SAND INTERCEPTER; (SECOND REQUEST) |
| PLANS MUST BE VIEWED AND APPROVED BY THE |
| UTILITY DEPTMENT FOR SIZE AND LOCATION. |
| THE CONTACT PERSON IS; |
| LYNN MASSON |
| PHONE # 822-2271 |
| FAX# 822-2279 |
| E-MAIL [email protected] |
| 5.PLUMBING FIXTURE REQUIREMENT TABLE FOR |
| PHASE 11 IS NOT CORRECT. WORK WILL BE |
| DONE IN THIS PART OF THE BUILDING. |
| PLEASE CHANGE CLASIFICATION TO BUSINESS, |
| OR CHANGE BOTH PHASES TO BUSINESS. |
| PLUMBING PLAN REVIEW BY; |
| JOHN LEECH |
| 805-6695 |