2006-03-14 00:00:00 | ****** UNSAT ********** |
| |
| |
| 1)NOTE: PLEASE SEE AN "EQUIPMENT |
| GROUNDING CONDUCTOR" IS NOT INSTALLED |
| UNTIL AFTER THE FIRST MEANS OF |
| DISCONNECT. PLEASE SEE 250.6 THE |
| GROUNDING OF ELECTRICAL SYSTEMS, CIRCUIT |
| CONDUCTORS, SURGE ARRESTERS, AND |
| CONDUCTIVE NON?CURRENT-CARRYING |
| MATERIALS AND EQUIPMENT SHALL BE |
| INSTALLED AND ARRANGED IN A MANNER THAT |
| WILL PREVENT OBJECTIONABLE CURRENT OVER |
| THE GROUNDING CONDUCTORS OR GROUNDING |
| PATHS. |
| |
| 2)NOTE: PLEASE SEE PANEL SCHEDULE AND |
| CONDUCTORS FOR SERVICESEEM TO INDICATE |
| THAT THE SERVICE WILL BE A SINGLE PHASE |
| INSTALLATION. PLEASE SEE ONLY THREE |
| CONDUCTORS ARE COMING FROM METER TO MCB |
| PANEL, YET LOAD CALCULATIONS MENTIONS |
| THE SERVICE BEING 120/208V 3-PHASE. |
| PLEASE SEE LOAD CALCUALTIONS ARE DONE TO |
| SINGLE PHASE?? |
| PLEASE CORRELATE ALL OF THE ABOVE. |
| 215.5. IF 3-PHASE, PLEASE ADJUST CALCS |
| AND CONDUCTORS. |
| |
| 3)NOTE: PLEASE SEE PLANS MENTIONS NEW |
| CEILING LT, HOWEVER NO CEILING OR |
| STRUCTURE COULD B E LOCATED. |
| |
| 4)NOTE: PLEASE SUBMIT SIGNED,DATED AND |
| SEALED ENGINEERED WIND LOAD CALCULATIONS |
| FOR POLES WITH LT FIXTURES. THESE ARE |
| REQUIRED AT THIS TIME AND WILL BE |
| REVIEWED BY THE STRUCTUAL PLANS |
| REVIEWER. PLEASE SEE MIN NDESIGN SHALL |
| MEET FBC 2004 140MPH. |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE DO NOT HESITATE IN CONTACTING |
| THIS OFFICE. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-805-6717 |